acres Site-Specific Conditions
Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.
Dist No. 1 of Snohomish, 554 U.S. 527 (2008).
OVERLAPPING CONTRACT ITEMS Products/services available in this Contract may also be available from other New York State contracts. Authorized Users will be advised to select the most cost effective procurement alternative that meets their program requirements and to maintain a procurement record documenting the basis for this selection.
Wage Scales All workers covered by this Agreement shall be classified and paid in accordance with the classification and wage scales as attached as Appendices "A" and forming part of this Agreement.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Wage Scale The wages shown in Appendix A will be part of this Agreement.
Grades At the end of each semester, students shall receive a final grade report that shall become a part of their permanent record. The College District’s grading system shall apply to all courses: A (90-100) - Excellent B (80-89) - Good C (70-79) - Average D (60-69) - Poor F (Below 60) - Failure I Incomplete Q Dropped W Dropped Due to Good Cause or Withdrawal from College CR Credit P Pass NP Not Passing FS Academic Fresh Start I - Incomplete: indicates that the coursework was incomplete because of serious illness or other justified emergency. The instructor shall change the grade of “I” to a grade based on the work completed for the course in addition to the work specified in the course completion contract. All incomplete work shall be completed within 90 days of the start of the next long semester. Failure to complete the work specified in the course completion contract shall result in a grade of zero, which shall be factored into the final grade calculation with appropriate weighting relative to other course grades.
Terminal Receipt You can get a receipt at the time you make any transaction (except inquiries) involving your account using an ATM and/or point-of-sale (POS) terminal.
Contract Quantity The Contract Quantity during each Contract Year is the amount set forth in the applicable Contract Year in Section D of the Cover Sheet (“Delivery Term Contract Quantity Schedule”), which amount is inclusive of outages.