Transit Mode Share - Managed Lanes Sample Clauses

Transit Mode Share - Managed Lanes. Figure 18 presents the transit mode share within the managed lanes between 2002 and 2009, defined as the proportion of peak period person throughput carried by the 95 Express bus service.
AutoNDA by SimpleDocs
Transit Mode Share - Managed Lanes. Figure 18 shows that transit mode share within the managed lanes has been on a generally upward trend since 2002, with average transit mode share rising from around 10 percent in 2002 to around 15 percent in 2008, with exact values depending on the direction and location. Looking specifically at the 2009 transit mode share value (northbound direction south of Golden Glades) it can be seen that this value has dropped from 15 percent in 2008 to 12.3 percent in 2009. This is due to the introduction of single occupant vehicles into the managed lanes, as illustrated in Table 14.

Related to Transit Mode Share - Managed Lanes

  • Statewide HUB Program Statewide Procurement Division Note: In order for State agencies and institutions of higher education (universities) to be credited for utilizing this business as a HUB, they must award payment under the Certificate/VID Number identified above. Agencies, universities and prime contractors are encouraged to verify the company’s HUB certification prior to issuing a notice of award by accessing the Internet (xxxxx://xxxxx.xxx.xxxxx.xx.xx/tpasscmblsearch/index.jsp) or by contacting the HUB Program at 000-000-0000 or toll-free in Texas at 0-000-000-0000.

  • Transit Service is the delivery of certain traffic between Carrier and a third party ILEC, CLEC or CMRS provider by Frontier over a separate trunk group between Carrier and Frontier where appropriate trunks exist between Carrier and third party through Frontier’s tandem. The following traffic types will be delivered: (I) Local Traffic originated from Carrier to such third-party and (ii) Local Traffic originated from such third-party to Frontier’s tandem and terminated to Carrier.

  • Supervisory Control and Data Acquisition (SCADA) Capability The wind plant shall provide SCADA capability to transmit data and receive instructions from the ISO and/or the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, as applicable, to protect system reliability. The Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected and the wind plant Developer shall determine what SCADA information is essential for the proposed wind plant, taking into account the size of the plant and its characteristics, location, and importance in maintaining generation resource adequacy and transmission system reliability in its area.

  • Transit Traffic The following rates will apply:

  • Synchronisation Commissioning and Commercial Operation 8.1 The Developer shall provide at least forty (40) days advanced preliminary written notice and at least twenty (20) days advanced final written notice to ESCOM of the date on which it intends to synchronize the Power Project to the Grid System.

  • Managed Services HP will provide the services as described in a Statement of Work (“SOW”) attached to this Agreement or incorporating it by reference. Each party will appoint a single point of contact as set forth in the SOW who will serve as their primary representative, have overall responsibility for managing performance, and meet with the other party’s representative to review progress. Change requests are governed by the change management procedures as set forth in the SOW.

  • Red Hat Directory Server Use Cases Subscription Services are provided for Red Hat Directory Server only when used for its supported Use Case in accordance with the terms of this Exhibit and Table 3.1 below.

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least thirty (30) days written notice to the SLDC and GUVNL, of the date on which it intends to synchronize the Power Project to the Grid System.

  • Configuration Management The Contractor shall maintain a configuration management program, which shall provide for the administrative and functional systems necessary for configuration identification, control, status accounting and reporting, to ensure configuration identity with the UCEU and associated cables produced by the Contractor. The Contractor shall maintain a Contractor approved Configuration Management Plan that complies with ANSI/EIA-649 2011. Notwithstanding ANSI/EIA-649 2011, the Contractor’s configuration management program shall comply with the VLS Configuration Management Plans, TL130-AD-PLN-010-VLS, and shall comply with the following:

Time is Money Join Law Insider Premium to draft better contracts faster.