Dedicated Transport A DS0-, DS1-, or DS3-capacity transmission facility between Verizon switches (as identified in the LERG) or UNE Wire Centers, within a LATA, that is dedicated to a particular end user or carrier. Dedicated Transport is sometimes referred to as dedicated interoffice facilities ("IOF"). Dedicated Transport does not include any facility that does not connect a pair of Verizon UNE Wire Centers.
Transition Period Due to the nature of our purchasing process, the District often requires an existing service provider to continue to provide goods and/or services while the District is in the process of advertising, evaluating, and awarding a contract for the provision of the same goods and/or services in the future. To accommodate this process, the Contractor shall agree to maintain the same terms and conditions set forth in this Agreement for a period up to ninety (90) days after the automatic termination of this Agreement at the end of its term, if requested by the District, as a transition period. In addition, if the Contractor is not the successful bidder for a future solicitation for the same or similar services, he or she shall agree to provide the same goods and/or services provided in this Agreement for a period up to ninety (90) days to allow for an orderly transition to the new provider. The District and the Contractor may mutually agree to a longer transition period.
Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.
Interconnection Customer Compensation for Actions During Emergency Condition The CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff for its provision of real and reactive power and other Emergency Condition services that the Interconnection Customer provides to support the CAISO Controlled Grid during an Emergency Condition in accordance with Article 11.6.
Interconnection Customer Compensation If the CAISO requests or directs the Interconnection Customer to provide a service pursuant to Articles 9.6.3 (Payment for Reactive Power) or 13.5.1 of this LGIA, the CAISO shall compensate the Interconnection Customer in accordance with the CAISO Tariff.
Service Period The Service Period of this Agreement is for 1 year in respect of the unit and starts on the Start Date as defined in the Terms and Conditions, or, in the case of an extension of renewal of the provision of Support Services, starts on the date of payment of the Charges.
COMMERCIAL REUSE OF SERVICES The member or user herein agrees not to replicate, duplicate, copy, trade, sell, resell nor exploit for any commercial reason any part, use of, or access to 's sites.
Shared Transport The Shared Transport Network Element (“Shared Transport”) provides the collective interoffice transmission facilities shared by various Carriers (including Qwest) between end-office switches and between end-office switches and local tandem switches within the Local Calling Area. Shared Transport uses the existing routing tables resident in Qwest switches to carry the End User Customer’s originating and terminating local/extended area service interoffice Local traffic on the Qwest interoffice message trunk network. CLEC traffic will be carried on the same transmission facilities between end- office switches, between end-office switches and tandem switches and between tandem switches on the same network facilities that Qwest uses for its own traffic. Shared Transport does not include use of tandem switches or transport between tandem switches and end-office switches for Local Calls that originate from end users served by non- Qwest Telecommunications Carriers (“Carrier(s)”) which terminate to QLSP End Users.
Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.
Delivery Point The delivery point is the point of delivery of the Power Product to the CAISO Controlled Grid (the “Delivery Point”). Seller shall provide and convey to Buyer the Power Product from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product transfer from Seller to Buyer at the Delivery Point.