Unpacking. Unpack the machine per the instructions listed on the car- ton. Note: You must be able to lift up to 50 lbs. in order to assemble the Galaxy II.
Unpacking. The PDR-2000 may be supplied as an individual chassis, stacked interconnected chassis, or mounted in a rack or cabinet. Follow the procedure for the type of system supplied. INDIVIDUAL CHASSIS An individual chassis will be packed in its own shipping carton. Inspect the carton for possible damage in transit. Open each carton carefully and remove the chassis. Inspect the equipment for possible damage. Verify all items of value have been removed from the carton prior to discarding the packing material. NOTE: It is suggested the carton be retained for possible onward shipment. INTERCONNECTED CHASSIS An interconnected chassis or equipment mounted in racks or cabinets will be shipped either in special boxes (wood crates or via air-ride van without any case). Inspect the crate or other packaging for possible damage in transit. Carefully remove the equipment from the container and inspect it for damage. Verify all items of value have been removed from the crate prior to discarding any packaging material and refer to above note. Should transit damage be found, please notify INIVEN immediately. MOUNTING INDIVIDUAL CHASSIS Two screws are required per mounting bracket (four total per chassis) and are not supplied with the unit. Install the chassis in the desired location and securely tighten all four screws. Spacing of the mounting holes is compliant with EIA and DIN standards. SYSTEMS Systems provided in a rack or cabinet from the factory must be secured to the floor or wall as required. Mounting hardware is not supplied due to the various surfaces and mounting methods. CAUTION: EQUIPMENT MOUNTED IN SWING RACK TYPE CABINETS MUST BE SECURED TO THE MOUNTING SURFACE PRIOR TO OPENING THE SWING RACK TO PREVENT THE CABINET FROM FALLING. INTERCONNECTED CHASSIS Interconnected chassis or equipment mounted on shipping rails will be mounted similarly to a single chassis. When shipping rails are provided, the equipment is to be placed near the desired location. Remove the screws holding the shipping rails. Slide the equipment into the rack or cabinet and secure it with the proper screws for mating hardware being used. Tighten all screws. NOTE: Adequate ventilation is required for reliable operation of electronic equipment. Temperatures within the equipment room should be kept within specifications to assure reliable operation. ELECTRICAL CONNECTIONS User connections are made on the rear of the chassis (except for the RS-232 port on the front of the chassis) through barrier and s...
Unpacking. 1) Upon delivery, all items on the inventory list shall be verified by the Ordering Agency as having been delivered prior to invoice payment.
Unpacking. 1. Cut and remove the metal bands from the carton.
Unpacking. 2.8.1 If unpacking is required, the Provider shall unpack items with efficiency and care and with consideration of all safety requirements.
Unpacking. August 29, 2023 - Convocation Day (8 a.m. – 3 p.m.): Approximately three (3) hours will be made available for unpacking purposes. August 30, 2023 - Professional Development Day (8 a.m. – 2 p.m.): PreK-5 will have the full day for unpacking; Grades 6- 12 will participate in professional development activities. Week of August 28, 2023 through September1, 2023 at noon: Teachers may submit time slips for up to three (3) hours for unpacking purposes, to be paid at the then current contractual rate which as of the date of execution of this Agreement is $40.00/hour. Buildings will only be available on September 1, 2023 until noon.
Unpacking. Please clean the area where the backdrop will be unrolled or unfolded. Make sure the area is free and clear of dirt, water, debris, paint, etc. Preferably, lay out a drop cloth or plastic on the floor before unpacking the backdrop. Rigging: At least 2 people must be used to hang a backdrop that is up to 20’ wide. Use more than 2 people if the backdrop is wider than 20’. Backdrops should be hung with clamps. Make sure the clamps are tipped with rubber, or place a clean piece or wood between the clamp and the backdrop to protect the surface. For backdrops with grommets, use string or zip-ties to attach the backdrop onto a pipe for hanging.
Unpacking. The School/Authority shall be responsible for the unpacking of crates.
Unpacking. The following is a list of items you should have received: ! WATERLOG® H-3531 FlashLite™ pressure transducer ! Main interface cable ! RS232 communication cable.(optional) ! Owner's Manual
Unpacking. Unpack the machine per the instructions listed on the car- ton.