Examples of Terminal 1 in a sentence
Complete Start Baseline Projected Finish Baseline Projected Start Baseline Projected Finish Baseline Projected Berth 400-409 - APMT Terminal 1.
As used in this Permit, Terminal 1 shall mean the existing terminal building at the Airport designated by Port as “Terminal 1”, presently consisting of Buildings X-000, X-000 xxx X-000; Terminal 2 shall mean the existing terminal building at the Airport designated by Port as “Terminal 2”, presently consisting of buildings M-130 and M- 152; and “Terminal 2 Extension” shall mean the improvements and extensions of Terminal 2, known as Buildings 367 and 368.
As used in this Permit, Terminal 1 shall mean the existing terminal building at the Airport designated by Port as “Terminal 1”, presently consisting of Buildings X-000, X-000 xxx X-000; Terminal 2 shall mean the existing terminal building at the Airport designated by Port as “Terminal 2”, presently consisting of buildings M-130 and M-152; and “Terminal 2 Extension” shall mean the improvements and extensions of Terminal 2, known as Buildings 367 and 368.
The equipment shall be installed into an existing Terminal 1 substation thus, the RMU shall be rated for indoor use.
To make connections easier and transfer times shorter, Air Astana will move in Frankfurt in Lufthansa’s Terminal 1.
Known as GTAs, GTA 0 is located immediately east of Terminal 1; GTA 1 is located between Terminal 1 and Terminal 2; GTA 2 is located between Terminals 2 and 3; GTA 3 is located between Terminal 3 and Terminal 4 and GTA 4 is located east of Terminal 4.
MTD’s combined administrative, operations, dispatch, and maintenance facility, referred to as Olive Terminal or Terminal 1, is located at 000 Xxxxx Xxxxxx in Santa Xxxxxxx.
Authority further reserves the right at all times to retain under its exclusive control a minimum of four (4) ticket counters in Terminal 1, a minimum of two (2) ticket counters in Terminal 2 East, and a minimum of three (3) ticket counters in Terminal 2 West as Authority-Controlled Facilities.
The targets of the ROI indicator relate to the works completion dates as follows: Target Extension of the East Pier Second quarter of 2016 Renovation of runway 4 at Paris-Orly Fourth quarter of 2016 First phase of the renovation of runway 3 at Paris-Orly Third quarter of 2018 Baggage sorting system in Hall L (TDS3) Second quarter of 2018 Orly New Departure Junction First quarter of 2018 Junction of B and D terminals Second quarter of 2019 Link-up of the satellites of Terminal 1 at Xxxxx-Xxxxxxx xx Gaulle.
Authority reserves the right at all times to retain under its exclusive control a minimum of four (4) Gates in Terminal 1, two (2) Gates in Terminal 2 East, and three (3) Gates in Terminal 2 West.