Utility Data and Coordination Sample Clauses

Utility Data and Coordination. Tetra Tech will coordinate with utility companies potentially affected by the proposed pipeline alignment to obtain utility facility data and submit a pdf version of the 60% and 90% construction drawings to the utilities with an email or letter requesting markups or verification of utilities not affected. This coordination will include follow-up calls and emails which will be documented and filed for future use as needed. Tetra Tech will coordinate two (2) meetings or conference calls for coordination with utility companies in the project corridor as applicable.
AutoNDA by SimpleDocs
Utility Data and Coordination. Tetra Tech will coordinate with utility companies potentially affected by the proposed utilities and submit a pdf version of the 95% construction drawings with an email requesting markups or verification of utilities affected by the construction. This coordination will include follow-up calls and emails which will be documented and filed for future use as needed. Tetra Tech will coordinate and summarize two (2) meetings or conference calls including the City and OUC for coordination with utility companies in the project corridor as applicable. Should an existing utility be required to relocate as a result from this coordination, a utility work schedule will be required by the Utility Owner/Agency (UAO).

Related to Utility Data and Coordination

  • Project Coordination The Engineer shall coordinate all subconsultant activity to include quality and consistency of deliverables and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.

  • Utility Coordination Identify all potential utility conflicts and provide preliminary office check plans showing the problem locations, posted to the City’s FTP site. Plans will clearly identify specific utility company facilities by color and by name (i.e. not just “gas” or “fiber optic”). ENGINEER shall include a conflict list for each utility, also posted to the FTP site. ENGINEER shall meet with utility company representatives to review plans and utility verification forms (Attachment No. 3 to Exhibit “A”) at each milestone date and as directed by the CITY and as determined necessary by the ENGINEER. This in- formation will be compiled into a summary report (Attachment No. 4 to Exhibit “A” also available on the City’s FTP site) maintained and updated by ENGINEER as necessary to present a cohesive and reflective status of utilities, and provided to the City as necessary. ENGINEER shall maintain involvement with utility companies until all conflicts have been resolved (not just identified). When appropriate, the City Engineer will approve the identification on plans of conflicts to be resolved during construction. ENGINEER shall meet with involved utility company/ies and project contractor to resolve any conflicts with utilities that occur during construction.

  • Information Services Traffic 5.1 For purposes of this Section 5, Voice Information Services and Voice Information Services Traffic refer to switched voice traffic, delivered to information service providers who offer recorded voice announcement information or open vocal discussion programs to the general public. Voice Information Services Traffic does not include any form of Internet Traffic. Voice Information Services Traffic also does not include 555 traffic or similar traffic with AIN service interfaces, which traffic shall be subject to separate arrangements between the Parties. Voice Information services Traffic is not subject to Reciprocal Compensation as Local Traffic under the Interconnection Attachment.

  • Project Management and Coordination The Engineer shall coordinate all subconsultant activity to include quality of and consistency of work and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.

  • Operation and Coordination The ISO shall direct the operation of, and coordinate the maintenance scheduling of, certain facilities of the NYS Power System, including coordination with control centers maintained by the Transmission Owners in accordance with the Reliability Rules, as follows:

  • Coordination of Work Licensee shall be responsible for coordination of its Equipment installation work to avoid any interference with existing utilities, substructures, facilities and/or SFMTA transit operations. Licensee shall be the City's point of contact for all Equipment installation and except in case of emergency, all communications concerning Equipment installation shall be through Licensee's field representatives.

  • Donor Coordination Throughout the multi-year development of the Compact, MCC and the Government have engaged in an inclusive process that included consultations with the United States Government, Nepali communities and key private sector actors, non-government actors, and other donors as well as multilateral organizations. In particular, MCC worked closely with the World Bank and the Asian Development Bank in reviewing and agreeing on various power sector reforms required in Nepal for future programming by the two banks. MCC also consulted frequently with the United Kingdom’s Department for International Development (“DFID”) during its preparation of a political economy analysis of power sector reform.

  • Information regarding Interconnection Facilities 4.2.1 The SPD shall be required to obtain all information from the STU/CTU/concerned authority with regard to the Interconnection Facilities as is reasonably necessary to enable it to design, install and operate all interconnection plant and apparatus on the SPD’s side of the Delivery Point to enable delivery of electricity at the Delivery Point. The transmission of power up to the point of interconnection where the metering is done for energy accounting shall be the responsibility of the SPD at his own cost.

  • Cooperation and Coordination The Parties acknowledge and agree that it is their mutual objective and intent to minimize, to the extent feasible and legal, taxes payable with respect to their collaborative efforts under this Agreement and that they shall use all commercially reasonable efforts to cooperate and coordinate with each other to achieve such objective.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.