Voltage Schedule Coordination Sample Clauses

Voltage Schedule Coordination. The Parties will coordinate the use of voltage control equipment to maintain a reliable bulk power transmission system voltage profile on the PJM, MIDWEST ISO, and surrounding systems. Providing reactive power and proper voltage support to a large interconnected power system is an iterative process. Reactive support starts at the distribution and sub-transmission levels as load increases, substation capacitors are switched, tap changing transformers, and generating unit MVAR outputs are adjusted in concert to hold overall system voltage levels. In general, the voltage schedules are determined by the local transmission operator based on the local design characteristics and equipment availability. The following procedures are intended to ensure that bulk systems voltage levels enhance system reliability.
AutoNDA by SimpleDocs

Related to Voltage Schedule Coordination

  • Project Coordination The Engineer shall coordinate all subconsultant activity to include quality and consistency of deliverables and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.

  • Voltage Schedules Once the Developer has synchronized the Large Generating Facility with the New York State Transmission System, NYISO shall require Developer to operate the Large Generating Facility to produce or absorb reactive power within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria). NYISO’s voltage schedules shall treat all sources of reactive power in the New York Control Area in an equitable and not unduly discriminatory manner. NYISO shall exercise Reasonable Efforts to provide Developer with such schedules in accordance with NYISO procedures, and may make changes to such schedules as necessary to maintain the reliability of the New York State Transmission System. Developer shall operate the Large Generating Facility to maintain the specified output voltage or power factor at the Point of Interconnection within the design capability of the Large Generating Facility set forth in Article 9.5.1 (Power Factor Design Criteria) as directed by the Connecting Transmission Owner’s System Operator or the NYISO. If Developer is unable to maintain the specified voltage or power factor, it shall promptly notify NYISO.

  • General Coordination 5.1.1 Contractor’s Pre-Construction Phase Services team shall attend Project Team meetings with Owner, Owner representatives, and A/E at regularly scheduled intervals throughout the Pre-Construction Phase. Frequent Project Team meetings are anticipated prior to Owner acceptance of the GMP and during completion of the Construction Documents.

  • Order Coordination and Order Coordination-Time Specific 2.1.9.1 “Order Coordination” (OC) allows BellSouth and Global Connection to coordinate the installation of the SL2 Loops, Unbundled Digital Loops (UDL) and other Loops where OC may be purchased as an option, to Global Connection’s facilities to limit end user service outage. OC is available when the Loop is provisioned over an existing circuit that is currently providing service to the end user. OC for physical conversions will be scheduled at BellSouth’s discretion during normal working hours on the committed due date. OC shall be provided in accordance with the chart set forth below.

  • Project Coordinator 3. Within 14 days of the effective date of this Consent Agreement, DTSC and Respondent shall each designate a Project Coordinator and shall notify each other in writing of the Project Coordinator selected. Each Project Coordinator shall be responsible for overseeing the implementation of this Consent Agreement and for designating a person to act in his/her absence. All communications between Respondent and DTSC, and all documents, report approvals, and other correspondence concerning the activities performed pursuant to this Consent Agreement shall be directed through the Project Coordinators. Each party may change its Project Coordinator with at least seven days prior written notice. WORK TO BE PERFORMED

  • Donor Coordination Throughout the multi-year development of the Compact, MCC and the Government have engaged in an inclusive process that included consultations with the United States Government, Nepali communities and key private sector actors, non-government actors, and other donors as well as multilateral organizations. In particular, MCC worked closely with the World Bank and the Asian Development Bank in reviewing and agreeing on various power sector reforms required in Nepal for future programming by the two banks. MCC also consulted frequently with the United Kingdom’s Department for International Development (“DFID”) during its preparation of a political economy analysis of power sector reform.

  • Project Management and Coordination The Engineer shall coordinate all subconsultant activity to include quality of and consistency of work and administration of the invoices and monthly progress reports. The Engineer shall coordinate with necessary local entities.

  • CAISO Scheduling Coordinator Charge The CAISO Scheduling Coordinator Charge for each Unit shall be the product of $0.31 and the Unit’s Billable MWh for the Billing Month.

  • Outage Schedules The Connecting Transmission Owner shall post scheduled outages of its transmission facilities on the NYISO OASIS. Developer shall submit its planned maintenance schedules for the Large Generating Facility to Connecting Transmission Owner and NYISO for a minimum of a rolling thirty-six month period. Developer shall update its planned maintenance schedules as necessary. NYISO may direct, or the Connecting Transmission Owner may request, Developer to reschedule its maintenance as necessary to maintain the reliability of the New York State Transmission System. Compensation to Developer for any additional direct costs that the Developer incurs as a result of rescheduling maintenance, including any additional overtime, breaking of maintenance contracts or other costs above and beyond the cost the Developer would have incurred absent the request to reschedule maintenance, shall be in accordance with the NYISO OATT. Developer will not be eligible to receive compensation, if during the twelve (12) months prior to the date of the scheduled maintenance, the Developer had modified its schedule of maintenance activities other than at the direction of the NYISO or request of the Connecting Transmission Owner.

  • Scheduling Coordinator Buyer shall act as the Scheduling Coordinator for the Project. In that regard, Buyer and Seller shall agree to the following: