Welding/Cutting Torch Use Sample Clauses

Welding/Cutting Torch Use. No welding or cutting torch is to be used in the Building without the prior approval of Landlord. If such approval is granted by Landlord, the General Contractor must have a fire extinguisher present in the Work Area at all times when the equipment is being used. Additionally, the General Contractor must perform any such work after-hours because of the fumes which may be associated with such welding/cutting torch usage.
AutoNDA by SimpleDocs
Welding/Cutting Torch Use. No welding/cutting torch or arc welding equipment is to be used in the Building without prior approval of Project Manager. If such approval is granted by Building Management, the general contractor must have a fire extinguisher present in the Work Area at all times when the equipment is being used. Additionally, the Tenant and its general contractor may be required to perform all such work during non-Business Hours because of the fumes which may be associated with such welding. Tenant and its general contractor shall take efforts to protect life safety system from activating, and if a false alarm is signaled, Tenant will be charged $1,000.00 for each incident.
Welding/Cutting Torch Use. At no time is any welding, cutting torch or any open flame tool to be used in the Building without prior approval from Management. If approval is granted, the Contractor must have an appropriate fire extinguisher present in the work area at all times that the equipment is in use.
Welding/Cutting Torch Use. No welding, burning or cutting torch work is to be performed at the Project Site without the prior approval of Owner. If such approval is granted by Owner, the Contractor must have a firewatch, fire blankets, and a fire extinguisher present in the Work Area at all times when the equipment is being used. Additionally, the Contractor may, at Owner’s request, be required to perform any such work after-hours because of the fumes which may be associated with such welding/cutting torch usage. AFDOCS//21459967
Welding/Cutting Torch Use. At no time is any welding, cutting torch, or any open flame tool to be used in the building without prior approval in the form of a Hot Work Permit. Hot Work Permits can be obtained from the Landlord’s Representative. If approval is granted, the contractor must coordinate the timing with the Landlord’s Representative, twenty-four (24) hours before the work begins, then must have an appropriate fire extinguisher present in the work area at all times that the equipment is in use.

Related to Welding/Cutting Torch Use

  • Walls 12 Developer shall provide rustication patterns on all walls, except drainage headwalls, in Aesthetic 13 Area 3 in accordance with Exhibit L2.24 of the LAADCR. The final designs shall resemble these 14 simulations.

  • Speed The relative importance we attach is “high”.

  • Floor Loading Floor loading capacity shall be within building design capacity. Tenant may exceed floor loading capacity with Landlord’s consent, at Landlord’s sole discretion and must, at Tenant’s sole cost and expense, reinforce the floor as required for such excess loading.

  • Spares/bunkers, etc The Sellers shall deliver the Vessel to the Buyers with everything belonging to her on board and on shore. All spare parts and spare equipment including spare tail-end shaft(s) and/or spare propeller(s)/propeller blade(s), if any, belonging to the Vessel at the time of inspection used or unused, whether on board or not shall become the Buyers' property, but spares on order are to be excluded. Forwarding charges, if any, shall be for the Buyers' account. The Sellers are not required to replace spare parts including spare tail-end shaft(s) and spare propeller(s)/propeller blade(s) which are taken out of spare and used as replacement prior to delivery, but the replaced items shall be the property of the Buyers. The radio installation and navigational equipment shall be included in the sale without extra payment if they are the property of the Sellers. Unused stores and provisions shall be included in the sale and be taken over by the Buyers without extra payment. The Sellers have the right to take ashore crockery, plates, cutlery, linen and other articles bearing the Sellers' flag or name, provided they replace same with similar unmarked items. Library, forms, etc., exclusively for use in the Sellers' vessel(s), shall be excluded without compensation. Captain's, Officers' and Crew's personal belongings including the slop chest are to be excluded from the sale, as well as the following additional items (including items on hire): Please see Clause 19 The Buyers bunkers are the Charterers property and are to be excluded from the sale. The shall take over the remaining bunkers and unused lubricating oils in storage tanks and sealed drums shall remain the property of the sellers. Vessel’s new managers will pay sellers for these lubricating oils at net contract price as and when they are broached and pay the current net market price (excluding barging expenses) at the port and date of delivery of the Vessel. Payment under this Clause shall be made at the same time and place and in the same currency as the Purchase Price.

  • Roof Any leaks or evidence of moisture? Yes No Unknown Type of Roof: Age Comments: Is there any existing fire retardant treated plywood? Yes No Unknown Comments:

  • Multi-Tenant Floors If other tenants occupy space on the floor on which the Premises is located, Tenant’s identifying signage shall be provided by Landlord, at Tenant’s cost, and such signage shall be comparable to that used by Landlord for other similar floors in the Building and shall comply with Landlord’s then-current Building standard signage program.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.

  • Excavation If any excavation shall be made upon land adjacent to or under the Building, or shall be authorized to be made, Tenant shall afford to the person causing or authorized to cause such excavation, license to enter the Premises for the purpose of performing such work as said person shall deem necessary or desirable to preserve and protect the Building from injury or damage and to support the same by proper foundations, without any claim for damages or liability against Landlord and without reducing or otherwise affecting Tenant’s obligations under this Lease.

Time is Money Join Law Insider Premium to draft better contracts faster.