Grievance Description 80. The Union and the City agree that the following guidelines will be used in the submission of grievances.
System Description The DLCS is a network consisting of devices which are remotely controlled over RF transmission equipment by the PowerCAMPTM Software or equivalent. CL&P shall have access to the PowerCAMP™ LMS (as defined below) via the web interface. The PowerCAMPTM LMS shall include the software and hardware necessary to manage the Control Devices installed at the End-use Equipment at Participating Facilities. The PowerCAMPTM LMS includes AER’s PowerCAMPTM Server and PowerCAMPTM Suite, networking equipment, and third party software. PowerCAMPTM LMS Hardware
Template That certain three well drilling template acquired, inter alia, by Seller for use in connection with the drilling of the OCS-G 7049 #5 Well.
Maintenance Manual No later than 60 (sixty) days prior to the Project Completion Date, the Contractor shall, in consultation with the Authority’s Engineer, evolve a maintenance manual (the “Maintenance Manual”) for the regular and preventive maintenance of the Project Highway in conformity with the Specifications and Standards, safety requirements and Good Industry Practice, and shall provide 5 (five) copies thereof to the Authority’s Engineer. The Authority’s Engineer shall review the Maintenance Manual within 15 (fifteen) days of its receipt and communicate its comments to the Contractor for necessary modifications, if any.
Sick Leave Verification Process a. The new school district shall provide the employee with the necessary verification form at the time the employee receives confirmation of employment in the school district.
Work Description T-804 Opening Roads - Removal of closure devices, cleaning ditches, removing berms, and blading the traveled-way T-811 Closing Roads - Entrance treatment for 150' cross-rip; debris block (slash, earth, berm, rocks, etc.) + seed + water bar T-811 Closing Roads - Water bar frequency per BMPs for remainder of road T-811 Closing Roads - Engineering Rep. or Construction Inspector must be notified prior to performing closeout NFSR Road No. Lane Width & Maintenance Level Mile Marker Begin End 76L Single Lane / Level 2 76 0.00 Ending 0.48
GRIEVANCE REPORT FORM Grievance # School District Distribution of Form 1. Superintendent
Technical Specification As enumerated in Special Conditions of Contract/Scope of Work/attached Drawing/ Details/Schedule of Rates.
Templates The Applicant shall use Templates provided by Alberta Innovates to comply with its Required Reporting Metrics, Reports obligations, and with the Survey requirements. Because the Reports may contain technical or proprietary information about the Project or the Applicant, the Templates will specify when a section will be considered non-confidential. The content of sections that are marked as non-confidential can be disclosed in the public domain. All other sections will be considered confidential, and thus can only be disclosed to the Government of Alberta and to Funding Partners, if any, in confidence, but to no other party.
Implementation Report Within 150 days after the Effective Date, Extendicare shall submit a written report to OIG summarizing the status of its implementation of the requirements of this CIA (Implementation Report). The Implementation Report shall, at a minimum, include: