Workshops During the month of September or October of each year during the term of this Agreement, there shall be held at each University a workshop for Department Chairs at which will be discussed their roles and responsibilities as such. Representatives of the University, at its election, and representatives of the Association, at its election, shall be permitted to participate jointly in such workshop.
Work Week The work week will begin at 12:00 a.m. on Sunday and end at 11:59 p.m. the following Saturday.
Shiftwork (A) Where the Employee would have received shift loadings had the Employee not been on leave during the relevant period and such loadings would have entitled the Employee to a greater amount than a loading of 17.5% of the payment under clause 23.1(c), then the shift loadings must be added to the payment under clause 23.1(c)(i) instead of the 17.5% loading. (B) Provided further that if the shift allowance would have entitled the Employee to a lesser amount than the loading of 17.5% then such loading of 17.5% shall be used for the purpose of calculating annual leave loading in lieu of the shift allowance.
Synchronization, Commissioning and Commercial Operation 4.1.1 The Power Producer shall give at least fifteen (15) days written notice to the SLDC / ALDC / DISCOM as the case may be, of the date on which it intends to synchronize the Power Project to the Grid System. 4.1.2 Subject to Article 4.1.1, the Power Project may be synchronized by the Power Producer to the Grid System when it meets all the connection conditions prescribed in the Grid Code and otherwise meets all other Indian legal requirements for synchronization to the Grid System. 4.1.3 The synchronization equipment and all necessary arrangements / equipment including Remote Terminal Unit (RTU) for scheduling of power generated from the Project and transmission of data to the concerned authority as per applicable regulation shall be installed by the Power Producer at its generation facility of the Power Project at its own cost. The Power Producer shall synchronize its system with the Grid System only after the approval of GETCO / SLDC / ALDC and GEDA. 4.1.4 The Power Producer shall immediately after each synchronization / tripping of generator, inform the sub-station of the Grid System to which the Power Project is electrically connected in accordance with applicable Grid Code. 4.1.5 The Power Producer shall commission the Project within SCOD. 4.1.6 The Power Producer shall be required to obtain Developer and/ or Transfer Permission, Key Plan drawing etc, if required, from GEDA. In cases of conversion of land from Agricultural to Non-Agriculture, the commissioning shall be taken up by GEDA only upon submission of N.A. permission by the Power Producer. 4.1.7 The Power Producer shall be required to follow the Forecasting and Scheduling procedures as per the Regulations issued by Hon’ble GERC from time to time. It is to clarify that in terms of GERC (Forecasting, Scheduling, Deviation Settlement and Related Matters of Solar and Wind Generation Sources) Regulations, 2019 the procedures for Forecasting, Scheduling & Deviation Settlment are applicable to all solar generators having combined installed capacity above 1 MW connected to the State Grid / Substation including those connected via pooling stations.
Start-Up and Synchronization Consistent with the mutually acceptable procedures of the Developer and Connecting Transmission Owner, the Developer is responsible for the proper synchronization of the Large Generating Facility to the New York State Transmission System in accordance with NYISO and Connecting Transmission Owner procedures and requirements.
Basic Work Week a) The basic work week of an employee working full- time shall be forty (40) hours consisting of five eight hour days; b) Daily hours of work shall be consecutive with the exception of rest and meal periods. No split shifts shall be worked; c) Employees shall not work longer than their regular, scheduled work day, unless requested to do so by Management; in which event, additional time will be paid at applicable regular or overtime rates. Employees are required to leave the store as soon as it is reasonable to do so.
Pre-Commencement Phase Services The services required to be provided by the Contractor for the Pre- Commencement Phase of the Project in accordance with the Contract Documents.
Project Management Plan 3.2.1 Developer is responsible for all quality assurance and quality control activities necessary to manage the Work, including the Utility Adjustment Work. Developer shall undertake all aspects of quality assurance and quality control for the Project and Work in accordance with the approved Project Management Plan, Good Industry Practice and applicable Law. 3.2.2 Developer shall develop the Project Management Plan and its component parts, plans and other documentation in accordance with the requirements set forth in Section 1.5.2.5
Normal Work Week The normal work week shall be thirty-seven and one-half (37 1/2) hours, and the normal daily hours of work shall be seven and one-half (7 1/2) hours, exclusive of a meal period. The normal work week shall be Monday through Friday and the normal workday shall be scheduled between 7:00 a.m. and 6:00 p.m.
Construction Phase Services 3.1.1 – Basic Construction Services