Examples of Comprehensive O&M in a sentence
Bid shall confirm in all respects with requirements and conditions referred in this RFP or its amendments, if any.The Comprehensive O&M of solar PV system shall include wear, tear, overhauling, machine breakdown, appropriate insurance (if and as required), and replacement of defective modules, invertors / Power Conditioning Unit (PCU), spares, consumables & other parts for a period of twenty five (25) Operational Years.
The Work Order shall consist of a single rate for Supply, Erection, Commissioning and Comprehensive O&M.
Any supplies which have not been specifically mentioned in this RFP but which are necessary during construction or Comprehensive O&M period of the Project shall be provided by the Contractor without any extra cost and within the time schedule for efficient and smooth construction and Comprehensive O&M of the Project.
Comprehensive O&M of the Project at every location, from the date of the Commissioning of Project must be carried out by the Contractor.
Two sets of Engineering, electrical drawings and Installation and Comprehensive O&M manuals are to be supplied.
In case of termination of the Agreement, the Contractor shall be responsible for fulfilling all obligations required for Commissioning and Comprehensive O&M having attained Completion.
From an environmental per- spective, long distance travel is through their high demand for fuel consumption and contribution to global greenhouse emissions.These implications make long distance travel a greater concern to policy makers and companies in all industries, but specially in tourism and transporta- tion sectors.
Any supplies which have not been specifically mentioned in this tender but which are necessary during installation or Comprehensive O&M period shall be provided by the Contractor without any extra cost and within the time schedule for efficient and smooth installation, commissioning and Comprehensive O &M of the equipment.
The bidder shall quote rates for Comprehensive O&M for the first block on yearly basis from 3rd year to tenth year.
In case stabilization work of all the WEGs and BOP is delayed beyond stipulated period of two months by the Contractor the Comprehensive O&M period shall commence from the date when successful stabilization of all WEGs & BOP has been done and certified by the Engineer-in-Charge.