Date of Mechanical Completion definition

Date of Mechanical Completion means, in relation to the Plant, the date to be notified by Corporation, on which, and the construction of the Plant is expected to be completed with all equipment and be ready for testing and commissioning.
Date of Mechanical Completion means the date, by which, the construction of the Project is to be completed which shall be the date, not being later than 9 months from the Effective Date.
Date of Mechanical Completion means the actual calendar date upon which the Plant and Facility achieves, and all Work hereunder and Engineering Work under the Engineering Contract has been completed to, Mechanical Completion, as further specified in Annex ______ [Annex F of Engineering Contract?].

Examples of Date of Mechanical Completion in a sentence

  • CONTRACTOR assumes all risk of any loss or damage thereto until the Date of Mechanical Completion.

  • If at any time within one (1) year after the Date of Mechanical Completion, any defect in the engineering, design or other Work or Construction Work or other breach of this warranty is discovered by OWNER, OWNER shall promptly notify CONTRACTOR thereof, and CONTRACTOR shall promptly remedy and correct any such defects or breaches (including any associated equipment or machinery failures) at its sole risk, cost and expense.

  • If at any time within one (1) year after the Date of Mechanical Completion, any defect in the construction, erection or other Work or other breach of this warranty is discovered by OWNER, OWNER shall promptly notify CONTRACTOR thereof, and CONTRACTOR shall promptly remedy and correct any such defects or breaches (including any associated equipment or machinery failures) at its sole risk, cost and expense.

  • In case of JV, Leader above should be read as “One of the partners” for above commercial experience Date of Mechanical Completion will be considered as completion date and that should fall within the qualifying period.“Similar” nature of job is as defined at Sr. No.13.5.2. Above.

  • If at any time within one (1) year after the Date of Mechanical Completion, OWNER determines that the Plant [Facility] or any operation or performance thereof does not fulfill the Performance Guarantees, then OWNER shall promptly notify CONTRACTOR and, subject to the immediately succeeding sentence, CONTRACTOR shall promptly correct any such deficiencies at CONTRACTOR's sole risk, cost and expense.

  • CONTRACTOR and Engineering Contractor shall have care, custody and control of, and shall be solely responsible for, the Work in progress (including, without limitation, the Plant, the Facility (or any portion thereof), equipment, machinery, parts, materials and supplies on the premises of CONTRACTOR, the Site or any Subcontractor or Vendor, or in transit or in storage, which are intended for incorporation into the Work) until the Date of Mechanical Completion.

  • CONTRACTOR represents, warrants and guarantees all equipment, machinery, parts, materials, supplies and other items supplied, procured or specified by CONTRACTOR or any Vendor or Subcontractor, and all workmanship (including field workmanship), labor and services furnished in connection with the Work (whether by CONTRACTOR or any Subcontractor) against defects (latent or patent) in materials or workmanship, or otherwise, for a period of one (1) year after the Date of Mechanical Completion.

  • If within one (1) year after the Date of Mechanical Completion, OWNER discovers a defect or other breach of this warranty, OWNER shall promptly notify CONTRACTOR, and CONTRACTOR shall remedy and correct any such defect or breach at its sole risk, cost and expense.


More Definitions of Date of Mechanical Completion

Date of Mechanical Completion means the date certified in the Certificate of Mechanical Completion as described in Article 12.1, below.
Date of Mechanical Completion has the meaning set forth in the Construction Contract.

Related to Date of Mechanical Completion

  • Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.

  • Date of Practical Completion means the date certified in the QBCC Form 7 - Certificate of Practical Completion in accordance with Condition 28.

  • Practical Completion means the completion of the Project where the building is fit for occupancy and/or purpose.

  • Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Substantial Completion Date means the date on which Substantial Completion occurs.

  • Final Completion Date means the date on which Final Completion occurs.

  • Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;

  • Date of Completion with respect to a Project shall mean: (i) the date upon which such Project and all components thereof have been acquired or constructed and are capable of performing the functions for which they were intended, as evidenced by an Engineers’ Certificate filed with the Trustee and the Issuer; or (ii) the date on which the Issuer determines, upon the recommendation of or in consultation with the Consulting Engineer, that it cannot complete such Project in a sound and economical manner within a reasonable period of time as evidenced by an Engineers’ Certificate filed with the Trustee and the Issuer; provided that in each case such certificate of the Consulting Engineer shall set forth the amount of all Costs of such Project which have theretofore been incurred, but which on the Date of Completion is or will be unpaid or unreimbursed.

  • The Completion Date means the date of completion of the Works as certified by the Employer’s Representative.

  • Virtual Completion means the premise is in the opinion of the Employer fit for occupation.

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Date of Commercial Operation means the date on which the (nuclear or non-nuclear) power plant has successfully passed all performance and operational tests required by the end customer for commercial operation. In all other cases the warranty shall apply for twenty-four (24) months from delivery of the goods or performance of the services, or such longer period of time as customarily provided by Supplier, plus delays such as those due to non-conforming goods and services. The warranties shall apply to Buyer, its successors, assigns and the users of goods and services covered by this Order.

  • Time of Completion means the time for completing the execution of and passing the Tests on Completion of the Works of any section or part thereof as stated in the Contract (or as extended under Clause...) calculated from the Commencement Date

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Date of commencement of the project means the date of the agreement.

  • Certificate of Substantial Completion means the certificate executed by the A/E, ODR and Contractor that documents to the best of A/E’s and ODR’s knowledge and understanding, Contractor’s sufficient completion of the work in accordance with the Contract, so as to be operational and fit for the use intended.

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Commercial Operations Date or "COD": The date on which Facility first achieves Commercial Operations.

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Target Completion Date has the meaning given such term in Section 3.3(b).

  • Final completion and acceptance means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.

  • Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity

  • Occupancy Date means the date on which occupancy of all Units in a Project is permitted;

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;