end of pipe definition

end of pipe means the location at which water is released to waters or land.
end of pipe means the location where effluent discharges from the end of the advanced pretreatment unit before ultimately dispersing into the soil drainfield. This is the location where nitrogen and phosphorus sampling may occur in order to determine compliance with the applicable performance standard.
end of pipe. End of pipe shall mean the control manhole, provided the samples collected from the control manhole are representative of the discharge to the POTW.

Examples of end of pipe in a sentence

  • Currently, they are rather being treated more in their capacity to reveal the socio-cultural context in which they were produced and the writing subject’s self-positioning within the community/groups he belongs.

  • Specific milestones, timelines and effectiveness metrics are listed in Table 11 for the Control Action Emerging End of Pipe Stormwater Technologies.

  • End of Pipe - Large Ship Pollutant Medians that Do Not Meet Alaska Water Quality Standards Blackwater Graywater Pollutant Units AWQS 2003 2002 2001 2000 2003 Note: Fecal coliform information is a geometric mean.

  • Local Limits apply at End of Pipe and are expressed as maximum per day limits, or as otherwise specifically provided.

  • Query access points from Fairfax_STORMNET_NODES (select by attributes, TYPE_NAME = {Bioretention, Control Structure, Curb Inlet, Dry Pond, Grated Inlet, Infall, Parking Lot, Roof Top, Sand Filter, Trench, Wet Pond, Wetland, Yard Inlet, End of Pipe, End Wall, Inlet Pipe, Headwall, End Section}).

  • End of Pipe - For the purpose of determining compliance with limitations prescribed by Article 9, end of pipe shall mean the control manhole, provided the samples collected from the control manhole are representative of the discharge to the POTW.

  • C2.01 SWM Facility Treatment Options‌ Stormwater BMP’s and LID’s can be implemented at three different locations in the stormwater system: At the Source, Conveyance, and End of Pipe locations.

  • Note related modifications and markups of Record Drawings and Specifications.

  • Since EP (End of Pipe) technology in pollution countermeasures does not directly raise the efficiency of resource use, CP (Cleaner Production) technology was the subject of analysis as a basic pollution countermeasure.

  • Outside Diameter D in.Numberof Threads Per Inchn Pitch of Thread p in.Normal Engagement By HandL1 in.Length of Effective Thread L2 in.Wrench Makeup Length for Internal ThreadL3in.Total Length: End of Pipe to Vanish PointL4in.Pitch Diameter at Beginning of External ThreadE0in.Pitch Diameter at Beginning of Internal ThreadE1in.


More Definitions of end of pipe

end of pipe means the terminal points in all reclaimed water users' distribution systems.
end of pipe means the terminal points in all reclaimed water users’distribution systems.
end of pipe means the location at which water is released to waters or land. “environmental authority holder” means the holder of this environmental authority. “environmental authority” means an environmental authority granted in relation to an environmentally relevant activity under the Environmental Protection Act 1994. “environmental harm” has the meaning in section 14 of the Environmental Protection Act 1994. “environmental nuisance” has the meaning in section 15 of the Environmental Protection Act 1994. “environmentally relevant activity” means an environmentally relevant activity as defined under Section 18 of the Environmental Protection Act 1994 and listed under Schedule 3 of the Environmental Protection Regulation 2019. “existing structure” means a structure that was in existence prior to the adoption of this schedule of conditions under the authority. “extreme storm storage” means a storm storage allowance determined in accordance with the criteria in the Manual for Assessing Consequence Categories and Hydraulic Performance of Structures (ESR/2016/1933) published by the administering authority.“flaring” means process of combusting mine gases “flood protection landform” means an area of land that:(a) when compared to current conditions does not materially increase afflux upstream, or velocity downstream beyond the boundary of Lot 32 Plan RP908643 and Lot 31 Plan CP864573;(b) is not a regulated structure under the Manual; and(c) is safe, stable, non-polluting, and is able to sustain an agreed post-mining land use. “flowable substance” means matter or a mixture of materials which can flow under any conditions potentially affecting that substance. Constituents of a flowable substance can include water, other liquid, fluids or solids, or a mixture that includes water and any other liquids fluids or solids either in solution or suspension. “foreseeable future” is the period used for assessing the total probability of an event occurring. Permanent structures and ecological sustainability should be expected to still exist at the end of a 150 year foreseeable future with an acceptable probability of failure before that time. “groundwater receiving environment” means any part of the regional groundwater, including any part of the alluvium aquifer, exclusive of groundwater contained within the residual voids. “GDA94” means the Geocentric Datum of Australia 1994. “hazardous waste” means any substance, whether liquid, solid or gaseous, derived by or resulting from, the p...
end of pipe means the location where effluent discharges from the end of the advanced pretreatment unit before ultimately dispersing into the soil drainfield. This is the location where nitrogen and

Related to end of pipe

  • Interconnection is As Defined in the Act.

  • Interconnection Agreement means the Agreement between the Parties entitled “Interconnection Agreement Under §§251 and 252 of the Telecommunications Act of 1996,” dated July 16, 1996.

  • Modern Slavery has the meaning given to that term or, if “Modern Slavery” is not used, similar terms (such as forced labor), in the Modern Slavery Laws. Seller confirms that it does not use any Forced Labor, it conducts its business in compliance with the applicable Modern Slavery Laws, and it is not subject to any investigation, enforcement or conviction involving Modern Slavery. Seller shall promptly notify Buyer of any actual or suspected breaches by Seller or its Subcontractors of the applicable Modern Slavery Laws, and Seller agrees to provide Buyer immediately upon request any information and assistance that Buyer may require for compliance with the applicable Modern Slavery Laws.