Examples of Erosion and Sedimentation Control Plan in a sentence
The contractor shall implement the Erosion and Sedimentation Control Plan (ESCP) provided to him by the Engineer-in-charge as part of the larger Construction Management Plan (CMP).
The contractor shall obtain the Erosion and Sedimentation Control Plan (ESCP) Guidelines from the Engineer-in-charge and then prepare “working plan” for the following month’s activities as a CAD drawing showing the construction management, staging & ESCP.
The purpose of such inspections will be to determine the overall effectiveness of the Erosion and Sedimentation Control Plan, and the need for maintenance or additional control measures as well as verifying compliance with the Stormwater Management Plan.
The contractor shall obtain the Erosion and Sedimentation Control Plan (ESCP) Guidelines from the Engineer-in-charge and then prepare “working plan” for the following month‟s activities as a CAD drawing showing the construction management, staging & ESCP.
Prior to the commencement of any onsite works on the Lands, including earth movement or tree removal other than that required for preliminary survey purposes, or associated offsite works, the Developer shall have prepared by a Professional Engineer and submitted to the Municipality a detailed Erosion and Sedimentation Control Plan.
Water quality would be controlled during construction by use of silt fences and straw bales in accordance with a Temporary Erosion and Sedimentation Control Plan (TESCP) required by Chapter 30.63A SCC.
The Stormwater Authority or its designated agent shall make inspections as herein required and shall either approve that portion of the work completed or shall notify the applicant wherein the work fails to comply with the Erosion and Sedimentation Control Plan or the Stormwater Management Plan as approved.
Furthermore, PennEast’s Erosion and Sedimentation Control Plan requires site-specific plans to mitigate sedimentation.122.
The contractor shall obtain the Erosion and Sedimentation Control Plan (ESCP) Guidelines from the Engineer-in-charge and then prepare―working plan‖ for the following month‘s activities as a CAD drawing showing the construction management, staging & ESCP.
The approved Erosion and Sedimentation Control Plan and associated plans for grading, stripping, excavating, and filling work, bearing the signature of approval of the Stormwater Authority, shall be maintained at the site during the progress of the work.