Examples of Gate In in a sentence
Gate In Time [CDM Field T14] – dddddd The time at which a flight pulls in at the gate as reported by the CDM Participant via a CDM message.
Gate Charges for Equipment Not Used Gate Out Charge$100.00 per container (for all Marine depots) Gate In Charge$100.00 per container (for all Marine depots) Gate Out Charge$ 50.00 per container (for all non-Marine depots) Gate In Charge$ 50.00 per container (for all non-Marine depots) B.
Despatch the items to BHEL, Stores / Shipping along with Delivery Chelan (DC), Inspection Report (IR), and Dimensional Report (DR) each 6 copies and shall get Inward Entry on Delivery Chelan (DC) from the Gate In charge.
For exports, Cargo is delivered directly by shippers or their agent from Road Gate In (on road transport or other mode arranged by the shipper or its agent) to Vessel’s hook without landing at a place of rest.
The use of this product allows VCT to exchange various EDIFACT messages with its customers such as: • BAPLIE• CODECO• COARRI• MOVINS In addition to the EDIFACT messages, VCT will send In Yard list of containers, Export container EIR soft copy and Gate In / Gate Out details of the containers in flat file by email to the respective SLs on a daily basis.
Cleaning Within 2-4 days from the date Gate In Structural repairs Light damages-Within 2 days from the date of approval Heavy damages-Within five days from approval received date/ extent of repair.
Input 8 Gate In #3 Inputs Outputs HALF-SIZE 2.58 4.90 TYP.(124,5)MODULE: (65,5) Outputs Output #1Output #2Output #3A –OutputF –OutputL –OutputB –Sense*G –SenseM –SenseC Trim*H TrimN TrimD +Sense*J +SenseP +SenseE +OutputK +OutputQ +Output*For Units with BatMod B-IMONC-ITRIMD-VTRIML- and LJ-Series 0.53 SER.
It is important to note that the cost of freight could not go high as the contract was already signed and we had to perform the shipment on approved rates.5. Another issue we faced was at the time of Gate In at Shanghai.
Despatch the items to BHEL, Shipping / Stores along with Delivery Chelan (DC), Inspection Report (IR), and Dimensional Report (DR) each 6 copies and shall get Inward Entry on Delivery Chelan (DC) from the Gate In charge.
The register setting of 0-255 corresponds to about 0-25% of the full-scale output.• Gate: In software, the user may set the gate “off”, in which case the gate input is ignored.