Examples of Individual NPDES permit in a sentence
An Individual NPDES permit allows Fermilab to pre-treat and release effluent from the Central Utility Building (CUB) regeneration process to the City of Batavia sanitary sewer system.
IS ADDED TO READ AS FOLLOWS: 327 IAC 5-1.5-25.5 "Individual NPDES permit" or "individual permit" definedAuthority: IC 13-14-8; IC 13-14-9; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3 Affected: IC 13-11-2; IC 13-18-3-15; IC 13-18-4 Sec.
In addition to the Individual NPDES permit, PDX holds a NPDES 1200-CA (Construction Discharge) permit, a Water Pollution Control Facilities (WPCF) 1700-B Wastewater permit, and a Pretreatment permit issued by the City for discharges to the sanitary system.
This Individual NPDES permit is structured to specifically address the Columbia Slough Total Maximum Daily Load (TMDL) parameters which include dissolved oxygen, pH, nutrients, bacteria, and toxics.
These stormwater discharges are permitted under the Individual PDX NPDES Waste and Stormwater Discharge Permit No. 101647 (Individual NPDES permit) issued and administered by the Oregon Department of Environmental Quality (DEQ).
The simplified permit is usually issued within 2 weeks of receipt of the appli- cation.• An NPDES permit issued by the Bureau of Water has a maximum life of 5 years.• If you are required to obtain an Individual NPDES permit from the Bureau of Water, you are required to make a timely application 180 days prior to a new discharge or expiration of the existing NPDES permit if you wish to renew the permit.
This statement does not imply that theological study is the core element to one’s faith journey, nor was there a lack of teaching beforehand.Rather, in the context of my journey as a confused and frustrated young man seeking answers, theological education provided me with in-depth knowledge that the church did not, and would not provide.Malua Theological College and Bossey Ecumenical Institute both provided the ‘corned beef’ through my theological formation.
The City has had in place since its implementation of the Individual NPDES permit a GIS mapping system for the public infrastructure.
These discharges are also covered under the Port’s Individual NPDES permit.
Other PDX tenants whose operations trigger the need for a stormwater permit can either obtain their own 1200-Z permit or, if their stormwater comingles with stormwater from other PDX industrial operations, become a co-permittee with the Port on the Port’s Individual NPDES permit.