Individual NPDES permit definition

Individual NPDES permit means an NPDES permit issued to one (1) MS4 operator that contains requirements specific to that MS4 conveyance.
Individual NPDES permit means an NPDES permit issued to one (1) facility which contains requirements specific to that facility.
Individual NPDES permit means an NPDES permit that:

Examples of Individual NPDES permit in a sentence

  • An Individual NPDES permit allows Fermilab to pre-treat and release effluent from the Central Utility Building (CUB) regeneration process to the City of Batavia sanitary sewer system.

  • IS ADDED TO READ AS FOLLOWS: 327 IAC 5-1.5-25.5 "Individual NPDES permit" or "individual permit" definedAuthority: IC 13-14-8; IC 13-14-9; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3 Affected: IC 13-11-2; IC 13-18-3-15; IC 13-18-4 Sec.

  • In addition to the Individual NPDES permit, PDX holds a NPDES 1200-CA (Construction Discharge) permit, a Water Pollution Control Facilities (WPCF) 1700-B Wastewater permit, and a Pretreatment permit issued by the City for discharges to the sanitary system.

  • This Individual NPDES permit is structured to specifically address the Columbia Slough Total Maximum Daily Load (TMDL) parameters which include dissolved oxygen, pH, nutrients, bacteria, and toxics.

  • These stormwater discharges are permitted under the Individual PDX NPDES Waste and Stormwater Discharge Permit No. 101647 (Individual NPDES permit) issued and administered by the Oregon Department of Environmental Quality (DEQ).

  • The simplified permit is usually issued within 2 weeks of receipt of the appli- cation.• An NPDES permit issued by the Bureau of Water has a maximum life of 5 years.• If you are required to obtain an Individual NPDES permit from the Bureau of Water, you are required to make a timely application 180 days prior to a new discharge or expiration of the existing NPDES permit if you wish to renew the permit.

  • This statement does not imply that theological study is the core element to one’s faith journey, nor was there a lack of teaching beforehand.Rather, in the context of my journey as a confused and frustrated young man seeking answers, theological education provided me with in-depth knowledge that the church did not, and would not provide.Malua Theological College and Bossey Ecumenical Institute both provided the ‘corned beef’ through my theological formation.

  • The City has had in place since its implementation of the Individual NPDES permit a GIS mapping system for the public infrastructure.

  • These discharges are also covered under the Port’s Individual NPDES permit.

  • Other PDX tenants whose operations trigger the need for a stormwater permit can either obtain their own 1200-Z permit or, if their stormwater comingles with stormwater from other PDX industrial operations, become a co-permittee with the Port on the Port’s Individual NPDES permit.


More Definitions of Individual NPDES permit

Individual NPDES permit means a NPDES permit issued by the commissioner under 327 IAC 5 to a single facility that contains requirements specific to that individual facility.
Individual NPDES permit means a NPDES permit issued by the commissioner under 327 IAC 5 to a single facility that
Individual NPDES permit means a NPDES permit issued by the commissioner under 327 IAC 5 to a single facility that

Related to Individual NPDES permit

  • NPDES Permit means any permit or equivalent document or requirements issued by the Administrator, or, where appropriated by the Director, after enactment of the Federal Clean Water Act to regulate the discharge of pollutants pursuant to Section 402 of the Federal Act.

  • Administrative permit amendment means an air quality operating permit revision that:

  • Operating Permit means a permit issued pursuant to section 10 of this local law. The term “Operating Permit” shall also include an Operating Permit which is renewed, amended or extended pursuant to any provision of this local law.

  • Planning Permission means any permission, consent or approval given under the Planning Acts;

  • General air quality operating permit or "general permit" means an air quality operating permit that meets the requirements of ARM 17.8.1222, covers multiple sources in a source category, and is issued in lieu of individual permits being issued to each source.

  • General permit means a Permit which covers multiple dischargers of a point source category within a designated geographical area, in lieu of individual Permits being issued to each discharger.