Initial Acceptance Test definition

Initial Acceptance Test means the test for Initial Acceptance of the Facilities.
Initial Acceptance Test has the meaning as set forth in Section 6(b).
Initial Acceptance Test shall have the meaning assigned to it in Section 11.2.1.1.

Examples of Initial Acceptance Test in a sentence

  • Initial Acceptance Test for CORS network: The Test shall be carried out in the closed polygonal area bounded by the 1stfive Reference Stations at adjoining locations 40-50 km apart, to which the Control Centre & corresponding Site Server have been integrated.

  • The hosted solution hardware and software installation along with the Initial Acceptance Test should be completed as mentioned in the purchase order.

  • The Initial Acceptance Test is performed in either the development environment or a testing environment.

  • Although a letter of intent is not required, is not binding, and does not enter into the review of subsequent applications, the information allows NCI staff to estimate the potential review workload and to avoid conflict of interest in the review.

  • The Facilities must pass two acceptance tests: an Initial Acceptance Test as part of and as a condition of Substantial Completion and a Final Acceptance Test as part of and as a condition for Final Acceptance and Completion.

  • G-1.3 Initial Acceptance Test (IAT)Application components are tested on an individual basis to verify the inputs, outputs, and processing logic of each application component functions without errors.

  • Section 5.2 of the Contract specified that 90% of the total amount would be payable on notification that the shipment as specified in Paragraph 1.1 and Initial Acceptance Test (IAT) had been completed.

  • For example, non-operating components such as landscaping of some equipment are not critical to Substantial Completion and the Initial Acceptance Test.

  • In no event, shall the penalties assessed under this paragraph 10 exceed twenty-five (25%) of a software module license fee, if the software module ultimately passes the Initial Acceptance Test.

  • The test will include: -coin drop -note drop -meter reconciliations and adjustments -report production -variance reporting -work order production and tracking -machine moves-including retirement/addition/configuration changes The Initial Acceptance Test shall be completed by February 15, 1999.

Related to Initial Acceptance Test

  • Acceptance Test is a test of the Features executed by the Customer to prepare the acceptance.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • Acceptance Testing mean the tests, reviews and other activities that are performed by or on behalf of Agency to determine whether the Deliverables meet the Acceptance Criteria or otherwise satisfy the Agency, as determined by the Agency in its sole discretion.

  • Acceptance Tests means those tests performed during the Performance Period which are intended to determine compliance of Equipment and Software with the specifications and all other Attachments incorporated herein by reference and to determine the reliability of the Equipment.

  • Final Acceptance Date means, in respect of any Offer, the final date for acceptance of such Offer which, if such Offer is extended prior to becoming unconditional, shall be the final date for acceptance of the extended Offer (but, if such Offer is or becomes unconditional, disregarding any additional or further period during which such Offer is open for acceptance);

  • Final Acceptance means final written acceptance of all the Work by the Commissioner, a copy of which shall be sent to the Contractor.

  • Operational Acceptance means the acceptance by the Procuring Entity of the Facilities (or any part of the Facilities where the Contract provides for acceptance of the Facilities in parts), which certifies the Contractor's fulfillment of the Contract in respect of Functional Guarantees of the Facilities (or the relevant part thereof) in accordance with the provisions of GCC Clause 28 (Functional Guarantees) hereof and shall include deemed acceptance in accordance with GCC Clause 25 (Commissioning and Operational Acceptance) hereof.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Drug use test means a scientifically substantiated method to test for the presence of illegal or performance-enhancing drugs or the metabolites thereof in a person’s urine.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Conditional Acceptance means a conditional acceptance by the Liquidity Provider of an extension of the Scheduled Termination Date.

  • Final Completion Date means the date on which Final Completion occurs.

  • Final completion and acceptance means the stage in the progress of the work as determined by the Contracting Officer and confirmed in writing to the Contractor, at which all work required under the contract has been completed in a satisfactory manner, subject to the discovery of defects after final completion, and except for items specifically excluded in the notice of final acceptance.

  • Acceptance Test Document means a document, which defines procedures for testing the functioning of installed system. The document will be finalized with the contractor within 7 days of issuance of the Letter of Award.

  • DNS test Means one non-­‐recursive DNS query sent to a particular “IP address” (via UDP or TCP). If DNSSEC is offered in the queried DNS zone, for a query to be considered answered, the signatures must be positively verified against a corresponding DS record published in the parent zone or, if the parent is not signed, against a statically configured Trust Anchor. The answer to the query must contain the corresponding information from the Registry System, otherwise the query will be considered unanswered. A query with a “DNS resolution RTT” 5 times higher than the corresponding SLR, will be considered unanswered. The possible results to a DNS test are: a number in milliseconds corresponding to the “DNS resolution RTT” or, undefined/unanswered.

  • Performance Test means all operational checks and tests required to determine the performance parameters including inter-alia capacity, efficiency and operating characteristics of the Stores as specified in the Contract.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Completion Period means the period starting from the date of issue of "Order" and required to complete the work in all respect.

  • Drug test means a test designed to detect the illegal use of a controlled substance.

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Maintenance Test means the maintenance test set out in Clause 12.1 (Maintenance Test).

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • EPP test Means one EPP command sent to a particular “IP address” for one of the EPP servers. Query and transform commands, with the exception of “create”, shall be about existing objects in the Registry System. The response shall include appropriate data from the Registry System. The possible results to an EPP test are: a number in milliseconds corresponding to the “EPP command RTT” or undefined/unanswered.

  • Project Milestone means the project milestone set forth in Schedule-J;

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.