Initial Construction Period definition

Initial Construction Period means for any lease which contemplates construction or renovation for Premises not previously occupied in whole or in part by Lessee under this Agreement and/or any previous Agreement, a period of time not to exceed six (6) months commencing with the date on which Lessee breaks ground on the Premises for construction of foundations or commences such renovation.
Initial Construction Period means the period of time for performance of the Initial Construction Work as shown on the Initial Construction Schedule. “Initial Construction Schedule” means the schedule for the completion of the Initial Construction Work, including dates for partial completion, set forthon Schedule 1.1(G).
Initial Construction Period means the period of [ here insert period] months commencing on the Effective Date as the same may be extended pursuant to the terms of this Concession Contract;

Examples of Initial Construction Period in a sentence

  • After the expiration of the Initial Construction Period except in the case of an emergency, Grantee agrees to notify the Authority not less than seventy-two (72) hours prior to Grantee’s employees, agents or contractors entering upon the Easement for construction, maintenance, repairs or other operations.

  • After the expiration of the Initial Construction Period, Grantee shall be permitted to have ingress and egress to and from the Easement for the construction, operation, maintenance, inspection, repair, removal or replacement of the Pipeline Facilities over a route or routes, across Authority’s adjacent lands, if any, designated in advance by Authority.

  • The rights of ingress and egress hereinabove referred to in Grantee shall be confined to the above-described Easements during the Initial Construction Period.

  • Grantee during the Initial Construction Period, shall not have the right to cross Authority's adjacent land, store materials or equipment on Authority’s adjacent land, or conduct any of Grantee’s operations on Authority’s adjacent land, without the prior express written consent of Authority.

  • The objectives of the Initial Construction Period (Mine Completion) have been met and from that point Suyamarca became responsible for all sustaining capital and operating costs of the mine.

  • City shall be responsible for any reduction in crop yield caused by the initial construction or any subsequent maintenance, repair or other activities of City on the Easements after the Initial Construction Period.

  • The Pipeline Facilities, including above-ground improvements, to be constructed in the Permanent Easement Parcel during the Initial Construction Period shall be as shown in the attached exhibit.

  • Collateral Management Agreement, dated December 15, 2006, among GSC European CDO I-R S.A., GSCP (NJ), LP and BNP Paribas Trust Corporation UK Limited and Deed of Amendment to the Collateral Management Agreement, dated February 1, 2007 J-11.

  • The customers who wish to avail the offer will be required to provide KYC documents to the TCL CRE at the CROMA store.

  • City shall have commercially reasonable access to the Permanent Easement Parcel during the Initial Construction Period and pay the College reasonable compensation for same.


More Definitions of Initial Construction Period

Initial Construction Period means the period of monthscommencing on the Effective Date as the same may be extended pursuant to the terms of this Concession Contract;
Initial Construction Period has the meaning set forth in Section 3.1(b) below.
Initial Construction Period means the period of …………………….. months commencing on the Effective Date as the same may be extended pursuant to the terms of this Concession Contract;
Initial Construction Period means the period of time for performance of the Initial Construction Work as shown on the Initial Construction Schedule.

Related to Initial Construction Period

  • Original construction ’ shall mean the first or initial construction

  • Residential construction means construction on single-family or two-family dwellings occupied or used, or intended to be occupied or used, primarily for residential purposes, and includes real property pursuant to chapter 499B.

  • Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;

  • Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • The constructional plant means all appliances, tools, plants or machinery or whatsoever nature required in or about the execution, completion or maintenance of the works but does not include materials or other things intended to form part of the permanent work.

  • Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.

  • Commencement of Construction means the commencement of construction of foundation components or elements (such as footings, rafts or piles) for the home.

  • Commenced Construction means (a) all of the following site preparation work is completed: ingress and egress routes exist; the site on which the Project will be located is cleared and graded; there is power service to the site; footings are prepared; and foundations have been poured consistent with purchased equipment specifications and project design; or (b) the following financial commitments have been made: (i) (A) an engineering, procurement, and construction contract (“EPC”) has been executed by all parties and is effective; or (B) contracts (collectively, “EPC Equivalents”) for all of the following have been executed by all parties and is effective: (1) project engineering, (2) procurement of all major equipment, and (3) construction of the Project, and (ii) the cumulative payments made by the Developer under the EPC or EPC Equivalents to the counterparties to those respective agreements is equal to at least thirty (30) percent of the total costs of the EPC or EPC Equivalents.

  • Commence Construction means that an owner or operator has either undertaken a continuous program of construction or has entered into a contractual obligation to undertake and complete, within a reasonable time, a continuous program of construction.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • Completion of Construction means the date, as determined by the Division after consultation with the Recipient, that the work of building and erection of the Project is substantially complete.

  • Existing construction means any structure for which the "start of construction" commenced before the effective date of the initial floodplain management code or ordinance adopted by the community as a basis for that community's participation in the NFIP.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Construction and demolition debris means and includes:

  • Begin actual construction means, in general, initiation of physical on-site construction activities on an emissions unit which are of a permanent nature. Such activities include, but are not limited to, installation of building supports and foundations, laying of underground pipework, and construction of permanent storage structures. With respect to a change in method of operation, this term refers to those on-site activities, other than preparatory activities, which mark the initiation of the change.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Cost of Construction means the total cost to Owner of those portions of the entire Project designed or specified by the Design Professional. Cost of Construction does not include the Design Professional's compensation and expenses and Owner's expenses associated with the Project or the cost of other services to be provided by others to the Owner.

  • Pipeline Construction means a substantial disturbance to agricultural land associated with installation, replacement, removal, operation or maintenance of a pipeline, but shall not include work performed during an emergency. Emergency means a condition where there is clear and immediate danger to life or health, or essential services, or a potentially significant loss of property. When the emergency condition ends, pipeline construction will be in accordance with these rules.

  • Land disturbing construction activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling and grading activities.

  • Construction Completion means physical construction of a cleanup action component is complete.

  • Contribution in aid of construction, as used in this subrule, means a nonrefundable cash payment grossed-up for the income tax effect of such revenue covering the costs of a distribution main extension or service line that are in excess of costs paid by the utility. The amount of tax shall be reduced by the present value of the tax benefits to be obtained by depreciating the property in determining the tax liability.