Inspection Schedule definition

Inspection Schedule means the inspection schedule set forth in Section 3.2 of the approved Part B application, and any subsequent KDHE-approved revision or modification to the Inspection Schedule.
Inspection Schedule means the Inspection Schedule provided in the Notice of Inspections within the meaning of the Act. Notice includes any notice issued under the Act or this contract.
Inspection Schedule means the inspection schedule set forth in Appendix 7 of the Permit Application, and any subsequent Secretary-approved revision or modification to the Inspection Schedule.

Examples of Inspection Schedule in a sentence

  • Anecdotal evidence indicates that through a lack of awareness many families are exposing themselves to serious lead poisoning as they undertake privately funded rehab activities on older homes many times with their own labor;▪ Provide assistance to landlords of older subsidized units to defray the cost of lead hazard reduction.

  • If the Council does not provide the Inspection Schedule, the Developer must request the Inspection Schedule from the Council prior to the Works commencing.

  • Determine and indicate in Testing and Inspection Schedule necessary time for preparation and submission of reports of tests and inspections.

  • Funding will be based on the compliance with Live Fire Training Structure Inspection Schedule criteria listed in Section (S) of this document.

  • Testing and Inspection Schedule: After discussion with University's Representative and Testing Laboratory in advance of performance of testing and inspection services, Contractor shall determine dates and times necessary for Testing Laboratory to schedule performance of required tests and inspections and determine due dates for issuance of reports.

  • Revising Testing and Inspection Schedule: When changes of the construction schedule are necessary during construction, coordinate all such changes of schedule with the testing laboratory as required.

  • Integrate Testing and Inspection Schedule with Construction Progress Schedule specified in Section 01 32 00- Construction Progress Schedules and indicate in the Inspections List submittal in Section 01 45 00 – Quality Control and Inspections.

  • The user‘s representative may during the repairs / refits invariably attend such tests and inspections as per the QA Plan/Quality Inspection Schedule.

  • Adherence to Testing and Inspection Schedule: When the Testing Laboratory is ready to test according to the determined schedule but is prevented from testing or taking specimens due to incompleteness of the work, all extra costs for testing attributed to the delay may be back-charged to the Contractor and shall not be borne by the University.

  • Upon verifying that the employer is a current participant, the CSHO shall notify the Area Director or designee so that the company can be removed from the OSHA General Programmed Inspection Schedule for the approved exemption period, which begins on the date the Regional Office approves the employer’s participation in SHARP.


More Definitions of Inspection Schedule

Inspection Schedule means the Inspection Schedule provided in the Notice of Inspections within the meaning of the Act. Practicable Completion means the date the builder has completed the Building Works in accordance with the Building Contract.
Inspection Schedule means the actions described in Section F-2 of the Permit Application (as defined in this section) and any subsequent EPA approved revision or modification to the Inspection Schedule.
Inspection Schedule means a written list as set out in Schedule 1, 2, 3 or 4, itemizing the components of a commercial vehicle to be inspected and the defects and major defects associated with each component;

Related to Inspection Schedule

  • Specification Schedule means the Schedule containing details of the Specification.

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • Implementation Schedule means the Implementation Schedule in Section VII of the tendering documents.

  • Environmental impact statement means a detailed written statement as required by section 102(2)(C) of the Act.

  • Allocation Schedule has the meaning set forth in Section 2.07.

  • Asset Schedule means with respect to any Transaction as of any date, an asset schedule in the form of a computer tape or other electronic medium (including an Excel spreadsheet) generated by Seller and delivered to Buyer and the Custodian, which provides information (including, without limitation, the information set forth on Exhibit E attached hereto) relating to the Purchased Mortgage Loans in a format reasonably acceptable to Buyer.

  • Project Schedule means a document that, with respect to each Phase of the Project, identifies, coordinates and integrates the anticipated design and construction schedules, the Contracting Authority’s and Owner's responsibilities, government authority reviews and other activities as are necessary for the timely completion of the Work.

  • Conversion Schedule means the Conversion Schedule in the form of Schedule 1 attached hereto.

  • Construction Completion Certificate means a document:

  • Survey Report means a report of the results of a Survey, containing the information set out in clause 12.4 and Schedule 6.

  • Shift Schedule means a written statement setting forth the days and hours upon which the employees are required to work.

  • Update means a modification to a Component System necessary to maintain the operation of the Component System in compliance with the Documentation in effect as of the Component System’s applicable License Effective Date and includes without limitation modifications correcting any design or operational errors in the Component System and modifications enabling the Component System to be operated in any revised operating environment issued by BNYM and excludes Upgrades.

  • Preliminary Closing Statement has the meaning specified in Section 2.3(a)(ii).

  • Time Schedule means the Time Schedule for final completion of the Works or Mechanical Completion of the Plant(s)/Unit(s) as the case may be, incorporated in the Contract or as may be extended by the OWNER or Engineer-in-Charge pursuant to the provisions hereof and shall include interim time schedules set up for achieving interim/phase-wise/stage-wise progress/completion/testing/commissioning/handing over, as may be prescribed by the OWNER/Engineer-in-Charge, within the overall Time Schedule as originally envisaged or as extended.