Examples of Instructions Procedures in a sentence
The requirements for the content and generation of the procedures controlling these processes are addressed in Section 5, Instructions, Procedures, and Drawings.
The team identified examples of a violation of 10 CFR 72.150, "Instructions, Procedures, and Drawings." Holtec Procedure HPP-2464-400 provided direction and guidance for verifying canister movement, canister centering operations, and for lowering the canister into the vault.
The procurement documents are controlled to address deviations from the specified requirements.1.5 Instructions, Procedures, and Drawings [CA] provides documents such as, but not limited to, written instructions, plant procedures, drawings, vendor technical manuals, and special instructions in work orders, to direct the performance of activities affecting quality.
The Bank may also issue separate requirements, restrictions, instructions, activation and access procedures, or any additional conditions pertaining to the access and use of the Mobile Banking Service, the Software, the Security Codes for the Mobile Banking Service, and the transmission of Instructions ("Procedures").
Hazard Prevention and ControlChapter 4, Procurement Document Control Chapter 5, Instructions, Procedures, and DrawingsChapter 6, Document, ControlChapter 7, Control of Purchased Items and ServicesChapter 8, Identification and Control of Items Chapter 9, Control of Special Processes Chapter 11, Test Control Chapter 12, Control of Measuring and Test EquipmentChapter 13, Handling, Storage, and ShippingChapter 15, Control of Nonconforming Items 7.
D Special Labeling Instructions Procedures labeled “ONLY for crop/counties with a 2005 crop year CCD prior to 8/31/2004” apply only to those crops/counties covered under the 04-BR Basic Provisions for the 2005 crop year.
The procurement documents are controlled to address deviations from the specified requirements.1.5 Instructions, Procedures, and DrawingsFermi 3 shall provide documents such as, but not limited to, written instructions, plant procedures, drawings, vendor technical manuals, and special instructions in work orders, to direct the performance of activities affecting quality.
A self-revealing Green noncited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," was identified after the licensee failed to follow reassembly procedures for the letdown system backpressure control valve.
The inspectors identified a Severity Level IV NCV of 10 CFR 72.150, "Instructions, Procedures, and Drawings." Specifically, the licensee failed to have procedures in place to ensure that the design basis peak fuel cladding temperature limit would not be exceeded during vacuum drying operations.
The inspectors identified a noncited violation of 10 CFR Part 50, Appendix B, Criterion V, "Instructions, Procedures, and Drawings," for the failure to follow Procedure AP 28A-0100, "Condition Reports," Revision 13.