Material Design Changes definition

Material Design Changes means any change in the project, its scope, or its quality which would affect its underwriting or compliance with MFA’s Mandatory Design Standards. For example, a change in building area, unit areas, unit counts, amenities, parking quantities, landscaping scope, energy performance, water usage, quality of construction or specification would each constitute a material change.
Material Design Changes means any changes to the design of a Product which renders or may render the Product non-compliant with the Standard applicable to the Product, and “Material” will have a corresponding meaning.

Examples of Material Design Changes in a sentence

  • The Project architect must further certify either there have been no Material Design Changes in the final plans and specifications or, if there have been Material Design Changes made, changes in the key development team members, or if the costs as identified on Schedule D of the original Application have changed more than 5%, then a detailed narrative description of the changes made in the construction drawings and/or Schedule D between Application and Carryover must be provided.

  • In the event there are Material Design Changes between the plans and specifications submitted at Application and those contained in final construction documents, MFA will require Applicant to submit a detailed narrative (at time of submission of final construction documents) of the changes made to the final construction documents and the reason(s) for the change(s).

  • All Applicants will be required to sign a certification stating that there have been no Material Design Changes, as defined in the QAP, between the plans and specifications submitted at Application and those contained in final construction documents.

  • A final, detailed, site specific Construction and Environmental Management Plan shall be submitted to, and agreed in writing with, the planning authority at least five weeks in advance of site clearance and site works commencing.

  • Material Design Changes: Differences between the plans and specifications submitted with the Application and those contained in the final construction documents must be approved by MFA.

  • In the event there are Material Design Changes/differences between those plans and specifications submitted at Application and those contained in final construction documents, MFA will require Applicant to submit a detailed narrative of Material Design Changes made to final plans and specifications.

  • The Applicant must submit a detailed narrative of Material Design Changes made to final plans and specifications along with the Change Fee described in Section IV.I.

  • Additionally, if applicable, provide the completed Waiver Procedure for Design Requirements form or any preliminary approval granted prior to submission of the Application.All Applicants will be required to sign a certification stating that there have been no Material Design Changes, as defined in the QAP, between the plans and specifications submitted at Application and those contained in final construction documents.

  • Joe Prescott, Preferred Benefits Services, discussed his insurance plans for health, dental and vision.

  • The Project architect must further certify either there have been no Material Design Changes in the final plans and specifications or, if there have been Material Design Changes made, then a detailed narrative description of the changes made in the construction drawings between Application and Carryover must be provided.

Related to Material Design Changes

  • Design Change is a change in work and/or materials shown in the Schedule of Items and described in Plans or specifications that has been mutually agreed to in writing or ordered by Contracting Officer. Changes of a minor nature (such as adjustment in horizontal and vertical alignment, that do not exceed specified tolerance, necessary to maintain or balance earthwork quantities substantially as designed) and variation in quantities, as described in B5.251, shall not be considered Design Changes.

  • Schematic Design Documents means drawings prepared by the Trade Contractor that illustrate the scale and relationship of the various Trade Contractor Work components and which also contain square footage and volume calculations for the building interior spaces, building exterior spaces, and major architectural and interior finishes.

  • Application Software means Software formulated to perform specific business or technical functions and interface with the business or technical users of the System and is identified as such in Appendix4 of the Contract Agreement and such other Software as the parties may agree in writing to be Application Software.

  • Design Documentation means all schematics and test, assembly and package documentation relating to the Product, including all design, specification and assembly documentation and data files for Materials, which is necessary for the production, manufacture, qualification, testing and delivery of the Product to be attached as Exhibit A.

  • Material Modifications means any modifications to the material related party transactions which were approved by the Audit Committee or Shareholders during the year which will change the complete nature of the transaction and in case of monetary thresholds which is in excess of 10% of the originally approved transaction, in case of exigencies only.

  • Server Software means software that provides services or functionality on a computer acting as a server.

  • Minor Change means an amendment of an existing authorisation that is not of a purely administrative nature and requires only a limited re-assessment of the properties or efficacy of the biocidal product or biocidal product family;

  • Plans and Specifications means the plans, drawings and specifications reasonably necessary to properly assess and review proposed Work prior to issuance of any approval that may be required under this Agreement;

  • System Software means Software that provides the operating and management instructions for the underlying hardware and other components, and is identified as such in Appendix 4 of the Contract Agreement and such other Software as the parties may agree in writing to be Systems Software. Such System Software includes, but is not restricted to, micro-code embedded in hardware (i.e., “firmware”), operating systems, communications, system and network management, and utility software.

  • Material Deviation refers to any contents or characteristics of the proposal that is significantly different from an essential aspect or requirement of the RFP, and : (i) substantially alters the scope and quality of the requirements; (ii) limits the rights of UNDP and/or the obligations of the offeror; and (iii) adversely impacts the fairness and principles of the procurement process, such as those that compromise the competitive position of other offerors.

  • Material Modification means any modification to an Interconnection Request that has a material adverse effect on the cost or timing of Interconnection Studies related to, or any Network Upgrades or Local Upgrades needed to accommodate, any Interconnection Request with a later Queue Position.

  • Adverse System Impact means a negative effect that compromises the safety or reliability of the electric distribution system or materially affects the quality of electric service provided by the electric distribution company (EDC) to other customers.

  • Major Change means any event or proposed modification that, in the opinion of the Fund, will involve a major change in, or a restructuring of, a Funded Activity’s scope, structure, design or objectives, including a reallocation of GCF Proceeds beyond the threshold set out in the relevant FAA affecting the Funded Activity’s scope or objectives, or any other change that substantially alters the purpose or benefit of the Funded Activity, in each case, as may be described in detail in the relevant FAA;

  • Design Documents means, collectively and as applicable, the Conceptual Design Documents, Schematic Design Documents, the Design Development Documents and the Construction Documents prepared by the Trade Contractor.

  • Design Manual means the MOHLTC design manual or manuals in effect and applicable to the development, upgrade, retrofit, renovation or redevelopment of the Home or Beds subject to this Agreement.

  • Standard Specifications means a compilation in book form of specifica- tions approved for general application and repetitive use;

  • Design Guidelines means the Fernkloof Estate architectural design guidelines to control all aspects of design and landscaping of any development within the Fernkloof Estate dev elopment, as amended from time to t ime in terms of the constitution of the MPOA or as required by the Council , a copy of the current draft which i s av ailable for inspection at the offices of the Association;

  • Change Orders mean changes or modifications to any Construction Contract or any other contract with labor or material suppliers.

  • Proposed Change Order (PCO means a document that informs Contractor of a proposed change in the Work and appropriately describes or otherwise documents such change including Contractor’s response of pricing for the proposed change.

  • Project designer means a person who designs any of the following activities with respect to RACM in a facility:

  • Supplier Software means software which is proprietary to the Supplier or its Affiliates which is used or supplied by the Supplier in the provision of the Services; Supplier Staff means all persons employed or engaged by the Supplier together with the Supplier's servants, agents, suppliers, consultants and Sub-Contractors (and all persons employed by any Sub-Contractor together with the Sub-Contractor’s servants, consultants, agents, suppliers and Sub-Contractors) used in the performance of its obligations under this Contract; Time and Materials means the pricing mechanism for the Services as may be agreed by the Parties and set out at paragraph Error: Reference source not found in the SOW; TUPE means the Transfer of Undertakings (Protection of Employment) Regulations 2006 (SI 2006/246) as amended or replaced or any other regulations or UK legislation implementing the Acquired Rights Directive; Velocity means the Metric which measures the total number of Story Points for Stories that have been accepted in a Sprint, indicating the rate of progress towards Acceptance of all Stories from the Product Backlog;

  • Urgent Works means any urgent measures, which in the opinion of the Engineer-in-charge become necessary during the progress of the work to obviate any risk of accident or failure or which become necessary for security.

  • Major Work means any Work to Construct or Maintain the Distribution System that costs more than One Hundred Thousand ($100,000.00) Dollars;

  • Design-Build Agreement means the design and construction agreement between Project Co and the Design-Builder, a certified copy of which has been delivered by Project Co to the Authority, as amended, supplemented or replaced from time to time in accordance with this Agreement;

  • Major modification means any physical change in or change in the method of operation of a major stationary source that would result in a significant emissions increase of a regulated NSR pollutant and a significant net emissions increase of that pollutant from the major stationary source.

  • Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.