Minimum Run Time definition

Minimum Run Time. For all generating units that are not combined cycle units, “Minimum Run Time” shall mean the minimum number of hours a unit must run, in real-time operations, from the time after generator breaker closure, which is typically indicated by telemetered or aggregated State Estimator megawatts greater than zero, to the time of generator breaker opening, as measured by PJM's State Estimator. For combined cycle units, “Minimum Run Time” shall mean the time period after the first combustion turbine generator breaker closure, which is typically indicated by telemetered or aggregated State Estimator megawatts greater than zero, and the last generator breaker opening as measured by PJM’s State Estimator.
Minimum Run Time means, for each Unit, the minimum time the Unit must remain Synchronized following Start-up. The Minimum Run Time for each Unit is shown in Section 10 of Schedule A.
Minimum Run Time means the amount of time that a Unit must stay on-line after a Start-Up prior to being Shut-Down as specified in Appendix II (Operational Limitations).

Examples of Minimum Run Time in a sentence

  • A COG that can be started up and complete its Minimum Run Time within a five-hour period can be committed by the STUC.

  • The COG is eligible to set the RTM LMP in any Dispatch Interval in which a portion of its output is needed to serve Demand, not taking into consideration its Minimum Run Time constraint.

  • An IFM Self-Commitment Period for a Bid Cost Recovery Eligible Resource may not be less than the relevant Minimum Run Time (MRT), rounded up to the next hour.

  • If Owner has disputed a Dispatch Notice under Section 4.6 (i) (Minimum Load) (ii) (Minimum Run Time) (iii) (Minimum Off Time) (iv) (Start-up Lead Time and Ramping constraint), or (v) (Unit Availability Limit) and such dispute is not resolved prior to the time for delivery, Owner will use reasonable efforts to comply with the Dispatch Notice, but shall not be liable to CAISO if it is unable to do so and Owner prevails in the dispute.

  • If Owner has disputed a Dispatch Notice under Section 4.6 (i) (Minimum Load) (ii) (Minimum Run Time) (iii) (Minimum Off Time) (iv) (Start-up Lead Time and Ramping Constraint), or (v) (Unit Availability Limit) and such dispute is not resolved prior to the time for delivery, Owner will use reasonable efforts to comply with the Dispatch Notice, but shall not be liable to CAISO if it is unable to do so and Owner prevails in the dispute.


More Definitions of Minimum Run Time

Minimum Run Time. For all generating units that are not combined cycle units, “
Minimum Run Time means the minimum number of hours a unit must run, in real-time operations, from the time after generator breaker closure, which is typically indicated by telemetered or aggregated State Estimator megawatts greater than zero, to the time of generator breaker opening, as measured by PJM's State Estimator. For combined cycle units, “Minimum Run Time” shall mean the time period after the first combustion turbine generator breaker closure, which is typically indicated by telemetered or aggregated State Estimator megawatts greater than zero, and the last generator breaker opening as measured by PJM’s State Estimator.
Minimum Run Time has the meaning set forth in the Tariff. To the extent this Tariff definition refers to or is applicable to a generation resource, such definition shall apply to the Storage Unit(s) as if the Storage Unit(s) are generation resources; provided, it shall only apply to the Storage Unit(s)’ ability to discharge energy and for instances where the Storage Unit(s) are discharging energy.
Minimum Run Time means the amount of time that the Facility must stay synchronizing with the Grid System after a Start-Up prior to a subsequent shutdown, as further described in Appendix J (Operating Characteristics).
Minimum Run Time has the meaning set forth in the Tariff.
Minimum Run Time means the time period after the first combustion turbine generator breaker closure, which is typically indicated by telemetered or aggregated State Estimator megawatts greater than zero, and the last generator breaker opening as measured by PJM’s State Estimator.
Minimum Run Time means the minimum time the Facility is required to operate at or above the Minimum Operating Level once Dispatched, as specified for the Facility in Schedule 2, Part 1, verified by Performance Tests conducted prior to the Final Commercial Operation Date and amended, if relevant, in accordance with the results of the Performance Tests.