Examples of O&M Activities in a sentence
Both documents are available upon request from Marin County Public Works, room 304 of the Marin County Civic Center or electronically on the MCSTOPPP website: Minimum Control Measures for Small Construction Projects:https://mcstoppp.org/wp-content/uploads/2020/09/esc-measures-for-small-construction-projects.pdf Municipal Field O&M Activities BMP Guidelines: https://mcstoppp.org/e11h_field-om-bmps-handbook/ Under E.11 Pollution Prevention and Good Housekeeping (E.11.g and h).
Both documents are available upon request from Marin County Public Works, room 304 of the Marin County Civic Center or electronically on the MCSTOPPP website: Minimum Control Measures for Small Construction Projects: http://www.marincounty.org/depts/pw/divisions/mcstoppp/development/during-construction?panelnum=2 Municipal Field O&M Activities BMP Guidelines: http://www.marincounty.org/depts/pw/divisions/mcstoppp/municipalities-only# Under E.11 Pollution Prevention and Good Housekeeping (E.11.g and h).
Except as otherwise provided in the 2012 IMA, all fines, penalties and claims relating to O&M Activities will be allocated based on the Actual Flows of District, Fairfax, WSSC and Non-Party Users.
In the event that construction works are necessary for O&M Activities or construction defect rectification these works will be managed through the Permit to Work System implemented by Watersure.All works conducted on the DWSS requires a permit to work approved and issued by Watersure.
Fiscal Year 2011 VMP O&M Activities ActivitiesFY 2011 O&MCost ProposalFY 2011 Actual O&M CostSpot Tree Trimming$60,000$26,456Trouble and Restoration Maintenance$60,000$12,785Planned Cycle Trimming$762,000$634,533Cycle Trimming Police Detail Expenses$67,000$120,163Hazard Tree Removal$287,500$318,607Interim Trimming$58,000$0Tree Planting$500$1,137Other Police Detail Expenses$23,000$16,793Optional Enhanced Hazard Tree Removal$100,000$64,979Total$1,418,000$1,195,453 Table 3.
Project Highway taken-up for O&M Activities are presented in Table below: Project Highway Road Section: Project RoadNote: At four locations on Project Highway of UPG-04 Minor Bridge/Culvert construction across the road has been carried out by the Irrigation Department.
In compensation for paying the costs of such O&M Activities, Gatherer shall receive all revenues derived from the operation of the DFW Gathering System during the term of this designation, including the applicable Xxxxxxx Fees paid for all volumes of Producers’ Gas and MV Mitigation Gas delivered to the DFW Gathering System during the term of this designation.
Each Manager, with respect to the Transmission Assets for which it is responsible, shall prepare and maintain an Operations and Maintenance Manual setting out the policies and procedures it shall adopt and implement in carrying out the O&M Activities.
However, in some cases the contracting options may be limited by an existing “master contract”.Develop an Appropriate Scope of Work for Baseline O&M Activities Baseline or defined O&M includes project management, utilities, materials, labor, and analytical costs that are necessary to keep a system running effectively and efficiently.
Maritime Link Life Extension Projects required by Nalcor shall be performed or caused to be performed by Emera in accordance with this Agreement as part of the Maritime Link O&M Activities, except that all Maritime Link Life Extension Costs attributable to Maritime Link Life Extension Projects shall be for Nalcor’s account and charged in accordance with Section 5.8.