Order of Magnitude Estimate definition

Order of Magnitude Estimate means a high level indication of the costs of the contemplated Change prepared on an order of magnitude basis and based on Project Co’s potential solutions to implement such Change;
Order of Magnitude Estimate has the meaning set out in Schedule 6 [Changes];
Order of Magnitude Estimate means a high level indication of the costs of a contemplated Change prepared on an order of magnitude basis and based on Project Co’s potential solutions to implement such Change;

Examples of Order of Magnitude Estimate in a sentence

  • The cost estimate for each activity shall be based on the scope of work defined for the WBS element.

  • Additional estimates will be established following requirements determination.) Very High - Greater than 1000 hours High - 501 to 1000 hours Medium - 251 to 500 hours Low - 51 to 250 hours Very Low - Less than 50 hours Supporting Information:7.b. Business: Order of Magnitude Estimate - Check Very High, High, Medium, Low.

  • Appendix 2 - Preliminary Order of Magnitude Estimate - Option A (under separate cover)3.

  • However, the following additional information is requested: A Rough Order of Magnitude Estimate to include level(s) of effort, order of magnitude cost estimates, and expected duration.

  • Estimated costs, including costs for database management, are included in the Rough Order of Magnitude Estimate section of this Study.

  • Seal Retainer Ring : Ductile Iron ASTM A 536 Grade 65-45-12 or Grade 400-15.

  • A statement shall be included of whether a Reasonable Order of Magnitude Estimate is or is not required by District and, if required, the Field Order shall include a Reasonable Order of Magnitude Estimate prepared by Design-Builder, or prepared by District and acknowledged in writing as accepted by Design-Builder, of the probable amount of the Contract Adjustment to the Contract Sum and Contract Time associated with performance of the Compensable Change.

  • Initial Sponsor Guidance for Risk Tolerance Category No. A Guide to the Project Management Body of Knowledge PMBOK Guide provides the following guidelines Rough Order of Magnitude Estimate 25 percent to.

  • Unemori After being employed to submit the conditioned SMA Permit Order of Magnitude Estimate for engineering valuations for a subdivision which they were the civil engineer of record, WSUE dishonestly claimed they were not employed to perform “any service in connection with the Special Management Area permit process”.

  • A statement shall be included of whether a Reasonable Order of Magnitude Estimate is or is not required by District and, if required, the Field Order shall include a Reasonable Order of Magnitude Estimate prepared by DBE, or prepared by Construction Manager and acknowledged in writing as accepted by DBE, of the probable amount of the Contract Adjustment to the Contract Sum Payable and Contract Time associated with performance of the Compensable Change.

Related to Order of Magnitude Estimate

  • Intrinsic Loss Estimate means total losses under the shared loss agreements in the amount of One hundred Sixty-eight million dollars ($168,000,000.00).

  • SF1-4 Intrinsic Loss Estimate means total losses under this Single Family Shared-Loss Agreement in the amount of eleven million dollars ($11,000,000.00).

  • Cost Estimate means the detailed projected expenditure, including material costs and overhead, equipment costs and overhead, labor costs and overhead, and all taxes associated with each major material and service component, required for a line extension. It shall also separately identify any incremental costs associated with providing premium services. The Company may, for the purpose of standardization, establish standard construction cost estimates, for basic or premium service plans, which shall not exceed, in any event, the average cost of constructing such line extensions in the area involved, in which case the term “cost estimate” as used in this section will be understood to mean the standard estimate thus established.

  • Severity means the dollar amount of losses on claims.

  • Remediation means any response, remedial, removal, or corrective action, any activity to cleanup, detoxify, decontaminate, contain or otherwise remediate any Hazardous Materials, Regulated Substances or USTs, any actions to prevent, cure or mitigate any Release, any action to comply with any Environmental Laws or with any permits issued pursuant thereto, any inspection, investigation, study, monitoring, assessment, audit, sampling and testing, laboratory or other analysis, or any evaluation relating to any Hazardous Materials, Regulated Substances or USTs.

  • Remediation waste means all solid and hazardous wastes, and all media (including groundwater, surface water, soils, and sediments) and debris that are managed for implementing cleanup.

  • Total Intrinsic Loss Estimate means the sum of the SF1-4 Intrinsic Loss Estimate in the Single Family Shared-Loss Agreement, and the Commercial Intrinsic Loss Estimate in the Commercial Shared-Loss Agreement, expressed in dollars.

  • Severity 3 means the unavailability of an individual resource and automated redundancy is fulfilling demand.

  • Cost of materials means the cost of components, parts or materials which are intended for the production, manufacturing or assembling of the goods bid for and which are not produced, manufactured or assembled in the factory where the production, manufacture or assembly of such goods occurs, including freight, landing costs, port charges, import duties and other import costs of such components, parts or materials and all costs in connection with the handling and transport thereof prior to delivery at that factory;

  • Estimate means to be based on technical evaluation of the sources contributing to the discharge including, but not limited to, pump capabilities, water meters, and batch discharge volumes.

  • Extreme Vetting means data mining, threat modeling, predictive risk analysis, or other similar services." Extreme Vetting does not include:

  • Tare Weight means the weight of an empty shipping container, excluding all materials used for wrapping, cushioning, banding, waterproofing, packaging, blocking and bracing articles within the exterior container.

  • Corrective Measure means a measure as defined in Article 3, point 16, of Regulation (EU) 2019/1020;

  • Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).

  • Blended learning means the delivery of instruction in a combination of time in a supervised physical location away from home and online delivery whereby the student has some element of control over time, place, path, or pace of learning.

  • Potential geologic hazard area means an area that:

  • Comprehensive assessment means the gathering of relevant social, psychological, medical and level of care information by the case manager and is used as a basis for the development of the consumer service plan.

  • Cost outlier means cases which have an extraordinarily high cost as established in 79.1(5)“f,” so as to be eligible for additional payments above and beyond the initial DRG payment.

  • Severity 1 means the unavailability of multiple service resources and redundant capability is not available or has been exhausted.

  • Estimated Cost , for the purposes of rule 22, means the estimated cost to maintain, repair or replace a major capital item;

  • Recalibration means the adjustment of all DRG weights to reflect changes in relative resource consumption.

  • Environmental Review means the Federal

  • Licensed site remediation professional means an individual

  • forecast prices and costs means future prices and costs that are:

  • Tests means and include such test or tests to be carried out on the part of the contractor as are prescribed in the contract or considered necessary by BHEL, in order to ascertain the quality, workmanship, performance and efficiency of the contractor or part thereof.

  • COVID-19 symptoms means fever of 100.4 degrees Fahrenheit or higher, chills, cough, shortness of breath or difficulty breathing, fatigue, muscle or body aches, headache, new loss of taste or smell, sore throat, congestion or runny nose, nausea or vomiting, or diarrhea, unless a licensed health care professional determines the person’s symptoms were caused by a known condition other than COVID-19.