Examples of Phased projects in a sentence
Phased projects must obtain the ATO for each phase completion resulting in a production change.
Phased projects or work areas that are geographically separated from each other may require separate permits for the phases or areas, when directed by the Designated Representative.
Phased projects will be required to perform a traffic study which analyzes both the impact of the phase(s) seeking a Certificate of Concurrency and the ultimate build out of the entire project.
Phased projects must include these amenities on the project site for each phase.
Phased projects should only quantify the project components for the phase seeking AHSC funding in the current application cycle.
Phased projects must adhere to the requirements of this section with the following exception:Multiple projects on the same parcel owned by the same owner/applicant are considered one project and must submit a completely executed copy of the governing document of the entity verifying ownership of the entire project by the owner/applicant and confirming the project will not be split upon sale.
Additional capacity may need to be purchased when the lot is developed. Phased projects, and/or projects that are closely associated, shall be considered one project for determining the impact on MPW’s system; and Layout of any fire protection system.
Phased projects with differing in- service dates for the respective phases were tabulated as separate projects.
The term “cross-enrolment” refers to simultaneous enrolment in two schools within a semester.
Phased projects with staggered incentives may require multiple post-construction inspections.