Phasing Plans definition
Examples of Phasing Plans in a sentence
Construction Phasing Plans must show all required phasing, construction procedures, controlling dimensions and elevations.
The CSPP document will also include the Phasing Plans prepared for the Project that are applicable to all phases of construction.
Subject to and in accordance with Schedule 17.16, the Depot SPC shall provide monthly reports to Network Rail, the Operator and the Secretary of State detailing the progress of the Depot Works in accordance with the Depot Phasing Plans and separately shall advise the said parties as soon as reasonably practicable in the event of any material problems or material delays affecting the Depot Works.
The currently anticipated sequence of construction and critical dates for the District are indicated on the Phasing Plans within the provided SD drawings.
The location and type of Regional Facilities shown on the Conceptual Water, Sewer, Stormwater and Phasing Plans (attached hereto as Exhibit “K”) are approximate and may change during the design phase provided that the intent of the plans is met as reasonably determined by the Designated Official.
The application, processing, and approval by the County of Development Phases and Phasing Plans that include the Property or any portion thereof shall be performed by the County in accordance with the application requirements and approval standards set forth in the County Code and this Agreement.
As and when needed to serve subsequent Development Phases within the Specific Plan, additional school sites shall be reserved for acquisition in locations approved by the parties during the processing and approval of the Phasing Plans for such Development Phases, consistent with the Specific Plan and improved consistent with the foregoing improvement standards in accordance with the separate agreements to be entered into with the applicable school districts described below.
Phasing of such improvements shall be addressed in the Phasing Plan(s) (see section 3.5.2.1(c) below).
The procedure outlined in Schedule 14 shall apply in relation to the issuing, consideration of, authorisation and implementation of Variations to any Related Depot Agreement, including but not limited to the rights and/or obligations of the parties to this Agreement and Variations to the Depot Requirements and/or the Depot Design in Principle, the Depot Phasing Plans and the Information Production Programme.
The Parties presently anticipate that the Owner will construct all on site road improvements (including, but not limited to, the completion of Schooner Cove Parkway), and will construct and dedicate all collector roads, local roads, lanes and emergency roads on a phased basis as generally shown on the Infrastructure Phasing Plans, to the standards referenced in the MoTI Preliminary Commentary, and including the accompanying ISMP works.