Drawing No. DRAWN DATE ________ -------------------------------------------------------------------------------------------- EXHIBIT L (2) - 2 of 12
Drawing No. Drawing No. Drawing No. : Construction Management Plan : Landscape & Streetscape Plans : Composite Utility Plan : Signage and Pavement Marking Plan : Landscape Plan : Landscape Plan Details
Drawing No. Drawing No. Drawing No. : General Notes : General Above and Underground Services : Grading Control Plan : General Removals Plan : Storm Sewer Drainage Area Plan : Sanitary Sewer Drainage Area Plan : Details : Standard Details – OPSD : Plan and Profile – Street ‘A’ : Plan and Profile – Storm Easement : Plan and Profile – Street ‘B’ : Erosion and Sediment Control Plan Drawing No. : Erosion and Sediment Control Details
Drawing No. 1101.02, Sheet 13, TEMPORARY LANE CLOSURES, replace General Note #12 with the following:
Drawing No. 11.4.3A Rev -
Drawing No. 12520493–G002 Rev 0 Drawing No. 12520493–G003 Rev 0 Drawing No. 12520493–G004 Rev 0 Drawing No. 12520493-S001 Rev 0 Drawing No. 12520493-S002 Rev 0 Drawing No. 12520493-S003 Rev 0 Drawing No. 12520493-S004 Rev 0 Drawing No. 12520493-S005 Rev 0
Drawing No. 209506/EIA/AIR/005-007 shows the contours of mitigated 1-hour (Tier 1), 24-hour (Tier 1) and annual cumulative TSP concentrations at the worst affected level (i.e. 1.5m above ground). For 1-hour and 24-hour TSP concentration, there are no air sensitive uses identified within the area of exceedance. Adverse short-term dust impact is therefore not anticipated.
Drawing No. 209506/EIA/IN/001 illustrates the proposed alignment of the CBL.
Drawing No. 22936/EN/001 shows the original coastline as accurately as is possible with the maps available. It should be noted that, east of the Sacred Hill, the coastline was very low- lying and flat, with salt-marshes and mud-flats off-shore, so that it is not always easy to be sure of where the normal high-water line was.