Drawing No Sample Clauses
Drawing No. Drawing No. Drawing No. : General Notes : General Above and Underground Services : Grading Control Plan : General Removals Plan : Storm Sewer Drainage Area Plan : Sanitary Sewer Drainage Area Plan : Details : Standard Details – OPSD : Plan and Profile – Street ‘A’ : Plan and Profile – Storm Easement : Plan and Profile – Street ‘B’ : Erosion and Sediment Control Plan Drawing No. : Erosion and Sediment Control Details
Drawing No. Drawing No. Drawing No. : Construction Management Plan : Landscape & Streetscape Plans : Composite Utility Plan : Signage and Pavement Marking Plan : Landscape Plan : Landscape Plan Details
Drawing No. DRAWN DATE ________ -------------------------------------------------------------------------------------------- EXHIBIT L (2) - 2 of 12
Drawing No. 1101.02, Sheet 12, TEMPORARY LANE CLOSURES, replace General Note #11 with the following:
Drawing No. 2. Location of the Works Contract in reference to physical and geographic units 29
Drawing No. 圖號 App. 6.1e Rev - Echinomuricea spp Source from: xxx.xxxxxxxxxx.xxx/ research/izg/echinomuricea.htm Balanophyllia sp Source from: xxx.xxx-xxxxxxxx.xxx/ 05/balanophyllia-regia.php Phyllangia spSource from: xxx.xxxxxxxx.xxx/XxxxxXxxxx/ Agreement No. CE 51/2002 (DS) Upgrading of Pillar Point Sewage Treatment Works - Investigation, Design and Construction Photographic Record of Representative Habitats and Species of Conservation Interest (Sheet 6 of 7) SCALE 比例 N.T.S. DATE 日期 Aug-06 CHECK SLMH DRAWN LLMC
Drawing No. Contains Variation to Contract No Yes Contractor hereby certifies that Contractor has complied with the requirements of Contact Documents in preparation, review, and submission of designated Submittal and the Submittal is complete and in accordance with the Contract Documents and requirements of laws and regulations and governing agencies. By: Contractor (Authorized Signature) This form is intended for internal and external stakeholders to document and agree upon proposed contract modifications, it does not actually modify a contract. Please complete all sections and attach this form, along with supporting documentation, to the Authorization for Contract Modification.
Drawing No. Rev. Description ----------- ---- -----------
Drawing No. Quantity on order Earlier Passed Qty. Quantity offered for inspection on date Quantity passed: Quantity rejected: Balance quantity: Consignee: Firm’s Quality Control In-charge RDSO inspecting official
1. Pre inspection checks X.xx. Parameter to be checked Observation
a) Availability of valid internal test reports.
b) Calibration status of testing equipments.
c) Audit checks of manufacturing procedure/internal quality system.
d) Availability of approved QAP/Drgs of the firm.
e) Availability of test bars of casting components of CBC for testing of chemical and mechanical properties.
f) Test Plan submitted by vendor as per para 6.5.10 of spec. Firm’s Quality Control In-charge RDSO inspecting official
2. Summary of results S.N. parameters Specified value Observation
a) Visual & operational check No cracks, Components should be operating freely in assembled condition. Marking as per specification.
b) Chemical composition (clause no.4.10 of spec.) C- 0.32 (Max.) Mn- 1.85 (Max.) P- 0.03 (Max.) S- 0.03 (Max.) Si- 1.50 (Max.)
c) Dimensional As per approved drg/gauges drawings
d) Physical properties (clause no. 4.13 of spec.) Grade E i) Tensile strength(Min.) 8435 Kg/cm2 ii) Yield Point(Min.) 7030 Kg/cm2 iii) Elongation in 51 mm (Min.) 14% iv) Reduction in area 30%
e) Impact test (clause no. 4.13.3 of spec.) Cast steel: Grade E Temp:-400C, Energy(Kg-m): 2.77(Min.)
f) Proof static tension test. (clause no. 5.1.4) Max. permanent set in mm for grade E steel: a) Knuckle at 181.5t: – 0.76 b) coupler body at 317.5 t: -0.76 Minimum ultimate load: a) knuckle: 295t b) coupler body: 408t (Note: Test to be done at the time of prototype inspection and thereafter once supply reached 200 numbers.)
g) Proof test of clevis (clause no. 5.1.5 of spec.) The clevis shall be able to withstand a proof load of 750KN without any deformation. (Note: Test to be done at the time of prototype inspection and thereafter once supply reached 200 numbers.)
Drawing No. Contract location