Preliminary site review definition

Preliminary site review means a site visit conducted by the chief that includes the applicant or the applicant’s designee and the professional engineer, if applicable, who is responsible for preparing the drawings or the professional engineer’s designee to review the location of a proposed oil and gas waste facility.
Preliminary site review means a site visit conducted by the chief that may include the applicant or the applicant’s designee to review the location of a proposed class II disposal well or class II disposal well and surface facility.

Examples of Preliminary site review in a sentence

  • Preliminary site review does not show the presence of wetlands or other restricting features.

  • Preliminary site review indicates: A maximum 30 foot wide driveway approach access is proposed off Gertie Avenue.

Related to Preliminary site review

  • Preliminary Work means all work done in the concept and preparatory stages (including non-exhaustively design, artwork, colour matching).

  • Preliminary assessment means the first phase in the process of identifying areas of concern and determining whether contaminants are or were present at a site or have migrated or are migrating from a site, and shall include the initial search for and evaluation of, existing site specific operational and environmental information, both current and historic, to determine if further investigation concerning the documented, alleged, suspected or latent discharge of any contaminant is required. The evaluation of historic information shall be conducted from 1932 to the present, except that the department may require the search for and evaluation of additional information relating to ownership and use of the site prior to 1932 if such information is available through diligent inquiry of the public records.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Project Implementation Manual or “PIM” means the manual setting out the measures required for the implementation of the Project, as the same may be amended from time to time, subject to prior approval of the Association;

  • Application Review Start Date means the later date of either the date on which the District issues its written notice that the Applicant has submitted a completed Application or the date on which the Comptroller issues its written notice that the Applicant has submitted a completed Application and as further identified in Section 2.3.A of this Agreement.

  • Review Package A package of documents consisting of a memorandum outlining the analysis and recommendation (in accordance with the Servicing Standard) of the Master Servicer or the Special Servicer, as the case may be, with respect to the matters that are the subject thereof, and copies of all relevant documentation.

  • Site Plan means a document or map that may be required by a county during a preliminary review preceding the issuance of a building permit to demonstrate that an owner's or developer's proposed development activity meets a land use requirement.

  • Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;

  • Project Completion Schedule means the progressive Project Milestones set forth in Schedule-J for completion of the Project Highway on or before the Scheduled Completion Date;

  • Construction Schedule means a construction schedule indicating the planned start and completion dates of the major activities of the Work as set out in Appendix [ ], a future Appendix;

  • construction site means a workplace where construction work is being performed;

  • technical specification means a document that prescribes technical requirements to be fulfilled by a product, process or service;

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Construction Completion Certificate means a certificate of the I-Bank to the effect that the construction of the Project is complete.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Project Completion Date means the date on which the Completion Certificate is issued;

  • Permit revision means any permit modification or administrative permit amendment.

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Project Deliverables means the Project deliverables set out in Schedule 2. Project Material means all the material including but not limited to documents, computer software, and data stored by any means which is created by the Fellow in the course of undertaking the Project.

  • Standard Specifications means a compilation in book form of specifica- tions approved for general application and repetitive use;

  • Utilization review means the prospective (prior to), concurrent (during) or retrospective (after) review of any service to determine whether such service was properly authorized, constitutes a medically necessary service for purposes of benefit payment, and is a covered healthcare service under this plan. WE, US, and OUR means Blue Cross & Blue Shield of Rhode Island. WE, US, or OUR will have the same meaning whether italicized or not. YOU and YOUR means the subscriber or member enrolled for coverage under this agreement. YOU and YOUR will have the same meaning whether italicized or not.

  • Technical Specifications A specification in a document defining the characteristics of a product or a service, such as the quality levels, the environmental and climate performance levels, the design for all needs, including accessibility for people with disabilities, and the evaluation of conformity, of product performance, of the use of the product, safety or dimensions, as well as requirements applicable to the product as regards the name by which it is sold, terminology, symbols, testing and test methods, packaging, marking or labelling, instructions for use, the production processes and methods at every stage in the life cycle of the supply or service, as well as the evaluation and conformity procedures;

  • MSAA Indicator Technical Specifications document means, as the context requires, either or both of the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Indicator Technical Specifications November 5, 2018 Version 1.3” and the document entitled “Multi-Sector Service Accountability Agreement (MSAA) 2019-20 Target and Corridor-Setting Guidelines” as they may be amended or replaced from time to time;

  • Preliminary plat means a map showing the salient features of a proposed subdivision submitted to an approving authority for purposes of preliminary consideration.

  • Site Engineer means an Engineer appointed by the SBIIMS at site as their representative for day-to-day supervision of work and to give instructions to the contractors.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;