Project levee definition

Project levee means any levee that is part of the facilities of the State Plan of Flood Control.
Project levee means a federal flood control levee that is a project facility under the State Water Resources Law of 1945, Chapter 1 (commencing with Water Code section 12570) and Chapter 2 (commencing with section 12639 of Part 6 of the Water Code).
Project levee means any levee that is part of the facilities of the State Plan of Flood Control (California Government Code Section 65007(h)).

Examples of Project levee in a sentence

  • Right-of-Way Support: The TRLIA team will continue to quantify right-of-way needs for the Project (levee footprint, borrow site(s), ecological, and construction).

  • The District provides on-going operation and maintenance for interior drainage canals, storm water pumping stations andportions of the Sacramento River Flood Control Project levee system surrounding the Natomas Basin perimeter.

  • No removal of trees or woody vegetation is planned at this site, since the project purpose is to mitigate for the loss of riparian woodlands caused by the ARCF 2016 Project levee improvements.

  • Commercial transportation on the Sacramento River reached its peak in 1925 as a result of Sacramento River Flood Control Project levee construction projects and channel dredging.

  • A short spur levee starting at Station 6052+00, approximately 0.3 miles in length, and oriented parallel to and directly north of Claire Avenue, was constructed as part of the 1950s project and remains a Project levee although its regional flood protection purpose was overcome by the improvements made in the 1990s.

  • The Project levee O&M standard and the PL 84-99 (Bulletin 192-82) non- urban standard have different levee slopes called out for the water-side and land-side which raise some issues on the smaller project levees like Georgiana Slough.

  • Reclamation District No. 1601, also known as Twitchell Island, maintains 11.9 miles of levee made up of2.5 miles of Federal Flood Control Project levee and 9.4 miles of non-project levee.

  • Require annual updates from the District and the City of Oakley on the status of the Dutch Slough Tidal Marsh Restoration Project, levee work, and project funding.

  • Inverse condemnation liability gives private individuals a pathway to recover for disproportionate damages caused by public improvements projects.20 After the 1986 storms and subsequent levee failures, a lawsuit involving some 3,000 plaintiffs claiming damages from a SPFC Project levee failure which resulted in evacuations, deaths, and hundreds of millions of property damage was filed against the State (Paterno v.

  • The 40 CFR part 82 regulations cited by the commenter are largely concerned with additions to and subtractions from the supply of ozone- depleting substances available for emissive use, but the part 82 regulations do include requirements for reporting the production of ozone-depleting substances even if they are transformed into substances that do not deplete the ozone layer.


More Definitions of Project levee

Project levee means any levee that is part of the facilities of the State Plan of Flood Control, as defined in Section 5096.805 of the Public Resources Code.
Project levee means a federal flood control levee, as shown on page 40 of the Department of Water Resources “Sacramento-San Joaquin Delta Atlas,” dated 1993, that is a project facility under the State Water Resources Law of 1945 (Chapter 1 (commencing with Section 12570) and Chapter 2 (commencing with Section 12639) of Part 6), if not less than a majority of the acreage within the jurisdiction of the local agency that maintains the levee is within the primary zone of the delta, as defined in Section 29728 of the Public Resources Code.

Related to Project levee

  • Project Leader has the meaning set forth in Section 3.1.

  • Project Management Report means each report prepared in accordance with Section 4.02 of this Agreement;

  • Project Land means any parcel or parcels of land on which the project is developed and constructed by a promoter;

  • Project Management The individuals appointed by each Party cf. clause 4.1 in the Agreement.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project Manager means the principal employee or agent of the Recipient having administrative authority over the Project designated in Appendix B pursuant to Section VI hereof, or authorized designee as per written notification to the Director.

  • Project Team means Owner, Contractor, A/E and consultants, any separate Contractors employed by Owner, and others employed for the purpose of programming, design, and construction of the Project. The members of the Project Team will be designated in writing by Owner and may be modified from time to time in writing by Owner.

  • Project Coordinator means the employee of Alamo Colleges District designated in Exhibit A hereto who will manage the relationship between Alamo Colleges District and Contractor. The designated employee will be knowledgeable of the Project and be experienced in managing projects similar to the one established herein.

  • Development Project means a project for the development of land within a project area.

  • Construction management at-risk means a project delivery method in which the District awards separate contracts, one for architectural and engineering services to design an infrastructure facility and the second to a construction manager at-risk for both construction of the infrastructure facility according to the design and construction management services.

  • Team Leader means an employee who is in a set or team and who is generally responsible for the work executed by the employees comprising such set or team;

  • Subproject means a specific development project to be carried out by a Beneficiary under Part B.2 of the Project and to be financed out of the proceeds of a Matching Grant.

  • Project Management Unit or “PMU” means the Recipient’s management and Implementation unit referred to in Section I.A.2 of Schedule 2 to this Agreement.

  • Project Engineer means the surveyor or engineer employed by or private

  • Sustainability Coordinator means BofA Securities, Inc., in its capacity as the sustainability coordinator.

  • Total resource cost test or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures, as well as other quantifiable societal benefits, including avoided natural gas utility costs, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).