Project Power means the United States' entitlement to capacity and energy from the Navajo Generating Station and the Transmission System, or any replacement thereof, as authorized by Section 303 of the Basin Project Act and as described in contracts entered into pursuant to that Act.

Examples of Project Power in a sentence

  • In the event of a default, OMEGA JV5 may take certain actions including the termination of a defaulting JV5 Participant’s entitlement to Project Power.

  • Purchaser Participants purchase the Project Power associated with its Project Share.

  • Before the Subcommittee on Seapower and Projection Forces of the House Armed Services Committee on Capacity of the U.S. Navy to Project Power With large Surface Combatants, June 17, 2015, pp.

  • The Contract Demands for Project Power and Energy may be modified by the Authority if the amounts of such Project Power and Energy available for sale from the Project are modified as required to comply with any ruling, order or decision of any regulatory or judicial body having jurisdiction.

  • BA hosting services shall be limited to those services necessary to implement the PRPO pursuant to Section 7 of the Contract for Open-Market Sale of Priest Rapids Project Power.

  • The Authority may cancel service hereunder or modify the quantities of Project Power and Energy allocated to Customer only (a) if such cancellation or modification is required to comply with any final ruling, order or decision of any regulatory or judicial body of competent jurisdiction (including any licensing or re-licensing order or orders of the FERC or its successor agency), or (b) as otherwise provided herein or in the Rules.

  • Axis Bank had created charge on assets of Project (Power Plant), whose yearly revenue was in the range of INR 6-8 Crs, to secure due repayment of outstanding dues.

  • Authority shall make Project Power and Energy available to Customer, Customer’s Authorized Recipient or Customer’s Agent at the Project Switchyard.

  • Customer, or the entity acting as LSE, Customer’s Authorized Recipient, or Customer’s Agent shall arrange for the transmission of the Project Power and Energy supplied hereunder from the Project Switchyard to Customer’s points of delivery or the conversion of the Allocation into financial settlements and benefits by such other method of disposition consistent with Article VI of this Agreement and Appendix A hereto.

  • MEAG Power and each of the CC Participants have amended their applicable CC Project Power Sales Contract, which allows MEAG Power to utilize a credit facility for the purpose of funding, on an interim basis, certain CC Project costs, including fuel costs, capital costs and working capital requirements.

Related to Project Power

  • net power means the power obtained on a test bench at the end of the crankshaft or its equivalent at the corresponding engine speed with the auxiliaries and equipment listed in Table 1 of Annex 4 to this Regulation, determined under reference atmospheric conditions;

  • Market power means the ability to impose on customers a sustained price for a product or service above the price that would prevail in a competitive market.

  • Station Power means energy used for operating the electric equipment on the site of a generation facility located in the PJM Region or for the heating, lighting, air-conditioning and office equipment needs of buildings on the site of such a generation facility that are used in the operation, maintenance, or repair of the facility. Station Power does not include any energy (i) used to power synchronous condensers; (ii) used for pumping at a pumped storage facility; (iii) used in association with restoration or black start service; or (iv) that is Direct Charging Energy.

  • relevant power means any power, whether exercisable by voting or otherwise and whether excisable alone or in association with others-

  • Power Plant means a facility for the generation of

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Project means the goods or Services described in the Signature Document or a Work Order of this Contract.

  • Project Contracts means collectively this Agreement, the Land Lease Agreement, the Construction Contract, O&M Contracts (if any) and any other material contract (other than the Financing Documents) entered into or may hereafter be entered into by the Concessionaire in connection with the Project;

  • Power Project or “Project” shall mean the Wind Power generation facility of Contracted Capacity of ………..[Insert capacity] MW, located at [Insert name of the place] in …. [Insert name of the District and State] having a separate control system, metering and a single point of injection into the grid at Delivery/Interconnection/Metering point at ISTS substation or in case of sharing of transmission lines, by separate injection at pooling point. This includes all units and auxiliaries such as water supply, treatment or storage facilities; bay/s for transmission system in the switchyard, dedicated transmission line up to the Delivery Point and all the other assets, buildings/structures, equipment, plant and machinery, facilities and related assets required for the efficient and economic operation of the power generation facility; whether completed or at any stage of development and construction or intended to be developed and constructed for the purpose of supply of power as per this Agreement;

  • Repower means to replace an existing engine with a newer, cleaner engine or power source that is certified by EPA and, if applicable, CARB, to meet a more stringent set of engine emission standards. Repower includes, but is not limited to, diesel engine replacement with an engine certified for use with diesel or a clean alternate fuel, diesel engine replacement with an electric power source (e.g., grid, battery), diesel engine replacement with a fuel cell, diesel engine replacement with an electric generator(s) (genset), diesel engine upgrades in Ferries/Tugs with an EPA Certified Remanufacture System, and/or diesel engine upgrades in Ferries/Tugs with an EPA Verified Engine Upgrade. All-Electric and fuel cell Repowers do not require EPA or CARB certification.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;

  • Combustion turbine means an enclosed fossil or other fuel-fired device that is comprised of a compressor, a combustor, and a turbine, and in which the flue gas resulting from the combustion of fuel in the combustor passes through the turbine, rotating the turbine.

  • Project Engineer means the surveyor or engineer employed by or private

  • Project Contract means any contract between the District or the Corporation and any contractor or vendor regarding the construction, production or other acquisition or installation of any part of an Acquisition Project.

  • Solar Power means power generated from the Solar Photovoltaic Power Project;

  • Water Supply Any problem with water supply? Yes No Unknown Comments: Home water treatment system: Yes No Unknown Comments: Fire sprinkler system: Yes No Unknown Does Not Apply Comments: Are the systems in operating condition? Yes No Unknown Comments:

  • Major project means a project comprising of a series of works, activities or services which is intended, in itself, to accomplish a definite and indivisible task of a precise economic or technical nature, which has clearly identified goals and whose total cost exceeds that which is specified in the Framework Agreement;

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Project Highway means the Site comprising the existing road {, proposed bypasses and tunnels} forming part of [NH-** from km ** to km **] and all Project Assets, and its subsequent development and augmentation in accordance with this Agreement;

  • Project Company means Company incorporated by the bidder as per Indian Laws in accordance with Clause no 3.5.

  • Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.

  • Gasification means the substoichiometric oxidation or steam reformation of a substance to produce a gaseous mixture containing two or more of the following: (i) oxides of carbon; (ii) methane; and (iii) hydrogen;

  • Power boiler means a boiler in which steam or other vapor is generated at a pressure of more than 15 psig for use external to itself or a boiler in which water is heated and intended for operation at pressures in excess of 160 psig and/or temperatures in excess of 250 degrees F by the direct application of energy from the combustion of fuels or from electricity, solar or nuclear energy.

  • wind turbine generator or “WTG” means a structure comprising a tower, rotor with three blades connected at the hub, nacelle and ancillary electrical and other equipment which may include J-tube(s), transition piece, access and rest platforms, access ladders, boat access systems, corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities and other associated equipment, fixed to a foundation;

  • Reactive Power means the wattless component of the product of voltage and current, which the Facility shall provide to or absorb from the Grid System within the Technical Limits and which is measured in MVAR;

  • Partner Project Document means the document describing in detail the Work, the Parties’ responsibilities, the expected Results including the work plan, the budget and the installment schedule. The Partner Project Document is the basis for requesting, committing and disbursing funds to carry out the Work and for monitoring and reporting.