PV Plant Capacity definition

PV Plant Capacity means the aggregate net generation capacity (AC) of the PV Plant at the Electrical Interconnection Point at Standard Test Conditions and expressed in whole kW (with a fractional kW amount below 0.5 being rounded down to the nearest whole kW and a fractional kW amount equal to or above 0.5 being rounded up to the nearest whole kW), determined in accordance with the Scope Book and other applicable provisions of this Agreement pursuant to a Project Performance Test.

Examples of PV Plant Capacity in a sentence

  • Rwanda‟s Private Sector Federation estimated that investors spend approximately 68% of the value of court judgments in pursuing a claim via commercial courts.

  • The following tables summarize the minimum requirements as necessary for the PV Plant Capacity Tests.

  • The outputs of the PV Plant Capacity Test shall be: The Modeled Capacity Rating is the capacity of the As-Built Modeled AEP at PV Plant Capacity Test reporting conditions, based on regression of the As-Built Modeled AEP data corresponding to the test period.

  • The power output for the PV Plant Capacity Test shall be measured at the Electrical Interconnection Point Meter.

  • Testing Protocols The PV Plant Capacity Test will be conducted consistent with the protocols defined in Section 3, Section 4 and Section 5 of this Part B and ASTM-E2848-13.

  • Testing duration and data frequency shall be as follows: Parameters PV Plant Capacity Test PV Plant Capacity Test duration PV Plant Capacity Test duration will be the minimum of five (5) consecutive days or as long as required to collect one hundred fifty (150) data points Data sample period The sample rate shall be 5 seconds and then averaged to 5 minutes.

  • The PV Plant Capacity Tests will be conducted by Seller consistent with this Part B.

  • In addition, if pursuant to Successfully Run PV Plant Capacity Tests, Seller achieves the Minimum PV Plant Capacity but fails to achieve the Guaranteed PV Plant Capacity, subject to any retest procedures and other remedies set forth in the Agreement, then Seller shall pay, as set forth in the Agreement, the Initial PV Plant Capacity Liquidated Damages, if any, and the Final PV Plant Capacity Liquidated Damages, if any.

  • Each of these data will be trended and compared to each other before and during the PV Plant Capacity Test to determine if there is any instrument that is reading with an offset or anomalous output.

  • Capacity Test Steps The following steps will be used to test the PV Plant’s power output with respect to the PV Plant Capacity Tests: Field testing Data compilation and reduction Calculation of Actual Capacity Rating and Modeled Capacity Rating Determination of pass / fail Field Testing AC power output (Pm) for the PV Plant, ambient temperature(s), and irradiance levels will be measured and recorded using the Primary Measurement Devices described in Section 4 of this Part B of this Exhibit J-2.

Related to PV Plant Capacity

  • Project Capacity means the AC capacity of the project at the generating terminal(s) and to be contracted with MSEDCL for supply from the Solar Power Project.

  • Contract Capacity has the meaning set forth in Section 3.1(f).

  • Storage Capacity means any combination of space, injectability and deliverability.

  • System Capacity means the operational capacity of the Gathering System at any applicable point in time.

  • Idle capacity means the unused capacity of partially used facilities. It is the difference between: (a) that which a facility could achieve under 100 percent operating time on a one-shift basis less operating interruptions resulting from time lost for repairs, setups, unsatisfactory materials, and other normal delays; and (b) the extent to which the facility was actually used to meet demands during the accounting period. A multi-shift basis should be used if it can be shown that this amount of usage would normally be expected for the type of facility involved.

  • Excess Capacity means volume or capacity in a duct, conduit, or support structure other than a utility pole or anchor which can be used, pursuant to the orders and regulations of the Commission, for a pole attachment.

  • Rated Capacity means the Average Daily Flow for which the Works are approved to handle;

  • Installed Capacity or 'IC’ means the summation of the name plate capacities of all the units of the generating station or the capacity of the generating station (reckoned at the generator terminals), approved by the Commission from time to time;

  • Reserved Capacity means the maximum amount of capacity and energy that the Transmission Provider agrees to transmit for the Transmission Customer over the Transmission Provider’s Transmission System between the Point(s) of Receipt and the Point(s) of Delivery under Tariff, Part II. Reserved Capacity shall be expressed in terms of whole megawatts on a sixty (60) minute interval (commencing on the clock hour) basis.

  • Contracted Capacity means the capacity (in MW AC) contracted with MSEDCL for supply by the successful bidder at the Delivery Point from the Solar Power Project.

  • Bid Capacity meanss capacity offered by the bidder in his Bid under invitation.

  • New Capacity means a new Generator, a substantial addition to the capacity of an existing Generator, or the reactivation of all or a portion of a Generator that has been out of service for five years or more that commences commercial service after the effective date of this definition. For purposes of Section 23.4.5 of this Attachment H, “Offer Floor” for a Mitigated Capacity Zone Installed Capacity Supplier that is not a Special Case Resource shall mean the lesser of (i) a numerical value equal to 75% of the Mitigation Net CONE translated into a seasonally adjusted monthly UCAP value (“Mitigation Net CONE Offer Floor”), or (ii) the numerical value that is the first year value of the Unit Net CONE determined as specified in Section 23.4.5.7, translated into a seasonally adjusted monthly UCAP value using an appropriate class outage rate, (“Unit Net CONE Offer Floor”). The Offer Floor for a Mitigated Capacity Zone Installed Capacity Supplier that is a Special Case Resource shall mean a numerical value determined as specified in Section 23.4.5.7.5. The Offer Floor for Additional CRIS MW shall mean a numerical value determined as specified in Section 23.4.5.7.6. For the purposes of Section 23.4.5 of this Attachment H, “Non-Qualifying Entry Sponsors” shall mean a Transmission Owner, Public Power Entity, or any other entity with a Transmission District in the NYCA, or an agency or instrumentality of New York State or a political subdivision thereof.

  • Licensed capacity means the number of children the Department has determined the day care home can care for at any one time in addition to any children living in the home who are under the age of 12 years. Children age 12 and over on the premises are not considered in determining licensed capacity.

  • Committed Capacity means that portion of the Capacity that is required to meet the Capacity Entitlements of Access Holders;

  • Nameplate capacity means the maximum electrical generating output (in MWe) that a generator can sustain over a specified period of time when not restricted by seasonal or other deratings as measured in accordance with the United States Department of Energy standards.

  • Maximum Capacity or ‘Pmax’ means the maximum continuous active power which a power-generating module can produce, less any demand associated solely with facilitating the operation of that power-generating module and not fed into the network as specified in the connection agreement or as agreed between the relevant system operator and the power-generating facility owner;

  • Generation Capacity Resource shall have the meaning specified in the Reliability Assurance Agreement. Generation Interconnection Customer:

  • Available Capacity means the capacity from the Project, expressed in whole megawatts, that is available to generate Product. [For As-Available Product facilities only]

  • Base Capacity Resource means a Capacity Resource as described in Tariff, Attachment DD, section 5.5A(b).

  • Technical Capacity means the maximum firm capacity that the transmission system operator can offer to the network users, taking account of system integrity and the operational requirements of the transmission network;