Fraud Monitoring System means an off-line administration system that monitors suspected occurrences of ABT- related fraud.
Infrastructure Improvements means a street, road, sidewalk, parking facility, pedestrian mall, alley, bridge, sewer, sewage treatment plant, property designed to reduce, eliminate, or prevent the spread of identified soil or groundwater contamination, drainage system, waterway, waterline, water storage facility, rail line, utility line or pipeline, transit-oriented development, transit-oriented property, or other similar or related structure or improvement, together with necessary easements for the structure or improvement, owned or used by a public agency or functionally connected to similar or supporting property owned or used by a public agency, or designed and dedicated to use by, for the benefit of, or for the protection of the health, welfare, or safety of the public generally, whether or not used by a single business entity, provided that any road, street, or bridge shall be continuously open to public access and that other property shall be located in public easements or rights-of-way and sized to accommodate reasonably foreseeable development of eligible property in adjoining areas. Infrastructure improvements also include 1 or more of the following whether publicly or privately owned or operated or located on public or private property:
Initial Environmental Examination or “IEE” means an initial environmental examination for a Subproject, including any update thereto, prepared and submitted by the Borrower pursuant to the requirements set forth in the EARF and cleared by ADB;
Remediation waste means all solid and hazardous wastes, and all media (including groundwater, surface water, soils, and sediments) and debris that are managed for implementing cleanup.
Beam monitoring system means a system designed and installed in the radiation head to detect and measure the radiation present in the useful beam.
Infrastructure improvement means permanent infrastructure that is essential for the public health and safety or that:
Individual monitoring devices means devices designed to be worn by a single individual for the assessment of dose equivalent. For purposes of these regulations, "personnel dosimeter" and "dosimeter" are equivalent terms. Examples of individual monitoring devices are film badges, thermoluminescent dosimeters (TLDs), pocket ionization chambers, optically stimulated luminescence (OSL) dosimeters and personal air sampling devices.
Collaborative drug therapy management means participation by an authorized pharmacist and a physician in the management of drug therapy pursuant to a written community practice protocol or a written hospital practice protocol.
Construction and demolition waste means the waste building materials, packaging, and rubble resulting from construction, remodeling, repair, and demolition operations on pavements, houses, commercial buildings and other structures.
Remediation means any response, remedial, removal, or corrective action, any activity to cleanup, detoxify, decontaminate, contain or otherwise remediate any Hazardous Materials, Regulated Substances or USTs, any actions to prevent, cure or mitigate any Release, any action to comply with any Environmental Laws or with any permits issued pursuant thereto, any inspection, investigation, study, monitoring, assessment, audit, sampling and testing, laboratory or other analysis, or any evaluation relating to any Hazardous Materials, Regulated Substances or USTs.
Mold remediation in accordance with professional standards means mold remediation of that
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Remediation Plan means a report identifying:
Phase I Environmental Assessment A “Phase I assessment” as described in, and meeting the criteria of, the ASTM, plus a radon and asbestos inspection.
service delivery and budget implementation plan means a detailed plan approved by the mayor of a municipality in terms of section 53(1) (c) (ii) for implementing the municipality’s delivery of municipal services and its annual budget.
Drug therapy management means the review of a drug therapy regimen of a patient by one or more pharmacists for the purpose of evaluating and rendering advice to one or more practitioners regarding adjustment of the regimen.
Clean coal technology demonstration project means a project using funds appropriated under the heading “Department of Energy—Clean Coal Technology,” up to a total amount of $2,500,000,000 for commercial demonstration of clean coal technology, or similar projects funded through appropriations for the Environmental Protection Agency. The federal contribution for a qualifying project shall be at least 20 percent of the total cost of the demonstration project.
Radiation therapy simulation system means a radiographic or fluoroscopic x-ray system intended for localizing the volume to be exposed during radiation therapy and confirming the position and size of the therapeutic irradiation field.
Monitoring System means a system established by BNY to fulfill the Responsibilities specified in clauses (d) and (e) of Section 1 of Article III of this Agreement.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Environmental Review means the Federal
Environmental Safeguards means the principles and requirements set forth in Chapter V, Appendix 1, and Appendix 4 (as applicable) of the SPS;
Licensed site remediation professional means an individual
Environmental Compliance Reserve means any reserve which the Agent establishes in its reasonable discretion after prior written notice to the Borrower from time to time for amounts that are reasonably likely to be expended by the Borrower in order for the Borrower and its operations and property (a) to comply with any notice from a Governmental Authority asserting material non-compliance with Environmental Laws, or (b) to correct any such material non-compliance identified in a report delivered to the Agent and the Lenders pursuant to Section 7.7.
Primary dose monitoring system means a system which will monitor the useful beam during irradiation and which will terminate irradiation when a pre-selected number of dose monitor units have been delivered.
Phase I Environmental Report means a report by an Independent Person who regularly conducts environmental site assessments in accordance with then current standards imposed by institutional commercial mortgage lenders and who has a reasonable amount of experience conducting such assessments.