Examples of Replacement OWTS in a sentence
Replacement OWTS with non- conforming absorption rates that exceed 5.12 gallons per square foot are required to provide a NOWTS (refer to Chapter 11 “Non-Conventional Onsite Wastewater Treatment Systems).Considerations for Gravel Packed Pits The following requirements pertain only to pits that are gravel packed after successful presoak and percolation tests have been accomplished while test holes were empty.
Tier 1 – Low Risk New or Replacement OWTS Applies to all new or replacement OWTS that comply with conservative siting and design standards. Tier 1 applies when a LAMP has not been approved by the RWQCB Maximum flow rate is 3,500 gpd Minimum density, based on annual rainfall of less than 15-inches, is 2.5 acre.
Tier 1 – Low Risk New or Replacement OWTS • Applies to all new or replacement OWTS that comply with conservative siting and design standards.• Tier 1 applies when a LAMP has not been approved by the RWQCB.• Maximum flow rate is 3,500 gpd.• Maximum density, based on annual rainfall of less than 15-inches, is one dwelling unit per 2.5 acre.
Tier 1 – Low Risk New or Replacement OWTS Applies to all new or replacement OWTS that comply with conservative siting and design standards. Tier 1 applies when a LAMP has not been approved by the RWQCB. Maximum flow rate is 3,500 gpd. Minimum density, based on annual rainfall of less than 15-inches, is 2.5 acre.
Tier 2 – LAMP for New or Replacement OWTS Applies to all new or replacement OWTS based on local conditions, siting and design standards as identified in an approved LAMP developed by the local agency and approved by the RWQCB. Allows the City of Hesperia (City) to adopt standards that may differ from Tier 1 Standards. Maximum flow rate is 10,000 gpd.
Tier 2 – LAMP for New or Replacement OWTS • Applies to all new or replacement OWTS based on local conditions, siting and design standards as identified in an approved LAMP developed by the local agency and approved by the RWQCB.• Allows the City of Hesperia (City) to adopt standards that may differ from Tier 1 Standards.• Maximum flow rate is 10,000 gpd.
Tier 2 – LAMP for New or Replacement OWTS • Applies to all new or replacement OWTS based on local conditions and siting and design standards as identified in a LAMP developed by the local agency and approved by the RWQCB.• Allows the City of Hesperia (City) to adopt standards that may differ from Tier 1Standards.• Maximum flow rate is 10,000 GPD.
Permits issued for the construction of a new or Replacement OWTS requiring an Operation and Maintenance (O&M) Plan shall be prepared for the OWTS owner by a Qualified Professional.
To accommodate this extreme variance, local agencies may submit management programs known as the Local Agency Management Plan (LAMP) for approval by the RWQCB, and then upon approval, manage the installation of New and Replacement OWTS under that plan.
Four years larer, by which rime more rhan rwice as many members of rhe birrh cohorr had developed schizophrenic illnesses, rhose proband– conrrol differences had enrirely disap- peared.