Source Control BMPs definition

Source Control BMPs means low-technology practices designed to prevent pollutants from contacting storm water runoff or to prevent discharge of contaminated runoff to the storm drainage system.
Source Control BMPs means BMPs that are designed to prevent Pollutants from contacting storm water runoff and prevent their Discharge into the MS4 or Receiving Waters.
Source Control BMPs means physical, structural or mechanical devices or facilities that are intended to prevent pollutants from entering stormwater.

Examples of Source Control BMPs in a sentence

  • Appropriate and feasible long-term Source Control BMPs, which may be structural features or operational practices, shall be implemented to minimize the transport of pollutants in runoff from the development by controlling pollutant sources and keeping pollutants segregated from runoff.

  • Except as specified in other sections of this Order, pollutant reduction and control measures can be used alone or in combination, and can include Structural and Source Control BMPs, and operation and maintenance procedures, which can be applied before, during, and/or after pollution generating activities.

  • Structural Treatment Control BMPs shall be implemented when a combination of Site Design and Source Control BMPs are not sufficient to protect water quality.

  • Complete the following selection table for Source Control BMPs, by checking boxes that are applicable.

  • Structural Source Control BMPs are physical, structural, or mechanical devices, or facilities that are intended to prevent pollutants from entering stormwater.

  • Copermittee stormwater ordinances require that applicable Source Control BMPs be implemented; the same BMPs may also be required as a condition of a use permit or other revocable Discretionary Approval for use of the site.

  • In the middle column, list the corresponding permanent, Structural Source Control BMPs (from Columns 2 and 3 of the Pollutant Sources/Source Control Checklist) used to prevent Pollutants from entering runoff.

  • This interest rate subsidy may be granted on interest payable to a bank during the first five years of the duration of the loan taken to finance investment in plant and equipment.

  • Add additional narrative in this column that explains any special features, materials or methods of construction that will be used to implement these permanent, Structural Source Control BMPs.

  • Site Design and Source Control BMPs may include, but are not limited to, those outlined in the City’s Storm Water Management program.


More Definitions of Source Control BMPs

Source Control BMPs means physical, structural or mechanical devices or facilities that are intended to prevent pollutants from entering stormwater. A few examples of source control BMPs are erosion control practices, maintenance of stormwater facilities, constructing roofs over storage and working areas, and directing wash water and similar discharges to the sanitary sewer or a dead end sump.
Source Control BMPs means BMPs that are intended to prevent pollutants from entering stormwater. Examples include erosion control practices, maintenance of stormwater facilities, providing roofs over storage and working areas, and directing wash water and similar discharges to the sanitary sewer or a dead-end sump.

Related to Source Control BMPs

  • Best available control technology (BACT means an emissions limitation (including a visible emission standard) based on the maximum degree of reduction for each pollutant subject to regulation under CAA which would be emitted from any proposed major stationary source or major modification which the Department, on a case-by-case basis, takes into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combustion techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 7 DE Admin. Code 1120 and 1121. If the Department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard, or combination thereof, may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation, and shall provide for compliance by means which achieve equivalent results.

  • Best available control technology or “BACT” means an emissions limitation, including a visible emissions standard, based on the maximum degree of reduction for each regulated NSR pollutant which would be emitted from any proposed major stationary source or major modification which the reviewing authority, on a case-by-case basis, taking into account energy, environmental, and economic impacts and other costs, determines is achievable for such source or modification through application of production processes or available methods, systems, and techniques, including fuel cleaning or treatment or innovative fuel combination techniques for control of such pollutant. In no event shall application of best available control technology result in emissions of any pollutant which would exceed the emissions allowed by any applicable standard under 567—subrules 23.1(2) through 23.1(5) (standards for new stationary sources, federal standards for hazardous air pollutants, and federal emissions guidelines), or federal regulations as set forth in 40 CFR Parts 60, 61 and 63 but not yet adopted by the state. If the department determines that technological or economic limitations on the application of measurement methodology to a particular emissions unit would make the imposition of an emissions standard infeasible, a design, equipment, work practice, operational standard or combination thereof may be prescribed instead to satisfy the requirement for the application of best available control technology. Such standard shall, to the degree possible, set forth the emissions reduction achievable by implementation of such design, equipment, work practice or operation and shall provide for compliance by means which achieve equivalent results.

  • Client Accounts means accounts of Clients (i) that are Controlled by an Access Person and (ii) in which no Access Person has a substantial proportionate economic interest; provided that, the Client pays a management, advisory or any other similar arms-length fee to the Access Person and the beneficiary of the Client Account is not an Immediate Family member of an Access Person.

  • Computer software maintenance contract means a contract that obligates a seller of computer software to provide a customer with:

  • Client Account means the unique personalised account of the Client consisting of all Completed Transactions, Open Positions and Orders in the Trading Platform, the balance of the Client money and deposit/withdrawal transactions of the Client money.

  • Traffic control device means a flagger, sign, signal, marking, or other device used to regulate, warn or guide traffic, placed on, over, or adjacent to a street, highway, private road open to public travel, pedestrian facility, or shared-use path by authority of a public agency or official having jurisdiction, or, in the case of a private road open to public travel, by authority of the private owner or private official having jurisdiction.

  • Source changer means a device designed and used for replacement of sealed sources in radiographic exposure devices, including those source changers also used for transporting and storage of sealed sources.

  • Source material milling means any activity that results in the production of byproduct material as defined by definition (2) of byproduct material.

  • Erosion and sediment control plan or "plan" means a document containing material for the conservation of soil and water resources of a unit or group of units of land. It may include appropriate maps, an appropriate soil and water plan inventory and management information with needed interpretations, and a record of decisions contributing to conservation treatment. The plan shall contain all major conservation decisions to ensure that the entire unit or units of land will be so treated to achieve the conservation objectives.

  • Diagnostic source assembly means the tube housing assembly with a beam-limiting device attached.

  • Commercial computer software means software developed or regularly used for non-governmental purposes which—

  • Source Code for a work means the preferred form of the work for making modifications to it. “Object code” means any non-source form of a work.

  • Monthly Reporting Date means the 25th day of each month after the date of this Agreement (or if any such day is not a Business Day, the next succeeding Business Day thereafter).

  • Access control means a system for allowing only approved individuals to have unescorted access to the security zone and for ensuring that all other individuals are subject to escorted access.

  • Open-Source Components means any software component that is subject to any open-source copyright license agreement, including any GNU General Public License or GNU Library or Lesser Public License, or other obligation, restriction or license agreement that substantially conforms to the Open Source Definition as prescribed by the Open Source Initiative or otherwise may require disclosure or licensing to any third party of any source code with which such software component is used or compiled.

  • Service Control Point (SCP) is the node in the common channel signaling network that accepts Queries for certain Database services. The SCP is a real time database system that receives Queries from service platforms, performs subscriber or application-specific service logic, and then sends a Response back to the Query-originating platform. Such service platforms can be Service Switching Points (SSPs) or other network nodes capable of properly formatting and launching Queries.

  • Monthly Reporting Period The period during which servicers report Mortgage payments to the Administrator, generally consisting of the calendar month preceding the related Payment Date for Gold PCs and the second calendar month preceding the related Payment Date for ARM PCs, which period the Administrator has the right to change as provided in Section 3.05(d) of this Agreement; provided, however, that with respect to prepayments on PCs issued before September 1, 1995, the Monthly Reporting Period generally is from the 16th of a month through the 15th of the next month.

  • Supply Start Date means the date(s) specified in clause 2.8;

  • CONTRACT END DATE Contract performance shall terminate as of December 31, 2027, with no new obligations being incurred after this date unless the Contract is properly amended, provided that the terms of this Contract and performance expectations and obligations shall survive its termination for the purpose of resolving any claim or dispute, for completing any negotiated terms and warranties, to allow any close out or transition performance, reporting, invoicing or final payments, or during any lapse between amendments. CERTIFICATIONS: Notwithstanding verbal or other representations by the parties, the “Effective Date” of this Contract or Amendment shall be the latest date that this Contract or Amendment has been executed by an authorized signatory of the Contractor, the Department, or a later Contract or Amendment Start Date specified above, subject to any required approvals. The Contractor certifies that they have accessed and reviewed all documents incorporated by reference as electronically published and the Contractor makes all certifications required under the Standard Contract Form Instructions and Contractor Certifications under the pains and penalties of perjury, and further agrees to provide any required documentation upon request to support compliance, and agrees that all terms governing performance of this Contract and doing business in Massachusetts are attached or incorporated by reference herein according to the following hierarchy of document precedence, the applicable Commonwealth Terms and Conditions, this Standard Contract Form, the Standard Contract Form Instructions and Contractor Certifications, the Request for Response (RFR) or other solicitation, the Contractor’s Response (excluding any language stricken by a Department as unacceptable, and additional negotiated terms, provided that additional negotiated terms will take precedence over the relevant terms in the RFR and the Contractor’s Response only if made using the process outlined in 801 CMR 21.07, incorporated herein, provided that any amended RFR or Response terms result in best value, lower costs, or a more cost effective Contract.

  • Innovative control technology means any system of air pollution control that has not been adequately demonstrated in practice, but would have a substantial likelihood of achieving greater continuous emissions reduction than any control system in current practice or of achieving at least comparable reductions at lower cost in terms of energy, economics, or non-air quality environmental impacts.

  • Source material means: (1) uranium or thorium, or any combination thereof, in any physical or chemical form or (2) ores which contain by weight one-twentieth of one percent (0.05 percent) or more of (i) uranium, (ii) thorium or (iii) any combination thereof. Source material does not include special nuclear material.

  • Product Schedule means the “Product Schedule” that forms part of the Contract.

  • Background concentration means such concentration of that substance as is present in:

  • Secondary dose monitoring system means a system which will terminate irradiation in the event of failure of the primary dose monitoring system.

  • fall prevention equipment means equipment used to prevent persons from falling from a fall risk position, inducing personal equipment, a body harness, lanyards, lifelines or physical equipment such as guard-rails, screens, barricades, anchorages or similar equipment;

  • Client Records has the meaning set forth in Section 3.14.