Sustaining Capital Costs definition
Examples of Sustaining Capital Costs in a sentence
Table 10 - LOM Sustaining Capital Costs Description CLOSURE COSTS Site Closure costs were also considered as an integral part of the Feasibility Study.
Pre-Production and Sustaining Capital Costs (Millions) * Pre-production and annual heap leach cell and tailings development** Totals may not add exactly due to rounding Operating Costs Operating CostsLOM AverageMining Costs* ($/tonne mined)$4.46Processing ($/tonne processed)$20.10G & A ($/tonne processed)$7.11* Not including capitalized pre-production mining costsProject Description The Tiger Deposit is located approximately 55 km northeast of Keno City, Yukon.
The capital costs are summarized in Table 18.1. Table 18.1 – Sustaining Capital Costs $ billions Mine$1.5Concentrator0.9Supporting Infrastructure and Environmental 2.5 Total Capital Expenditures $4.9 Estimates are derived from current costs and adjusted to the reserve price environment.
Details of the total sustaining cost are presented in Section 21.2.7.Table 1‑9: Sustaining Capital Costs SummaryMining Equipment 2.0TMF 1.5Water Management 0.5Total Operating Sustaining Capital Costs 4.0Closure & Reclamation 1.1Total 5.1Note: Sums may not add up due to rounding.
The total sustaining capital costs are summarized in Table 21.7 Summary of Sustaining Capital Costs.
Initial capital costs total ZAR 15,906M and are expended over a 72 month period from January 2017 to Dec 2022 including the pre-production construction and commissioning period; and· Sustaining Capital Costs — includes all costs over the 16-year mine life related to expansion of production from the initial 300ktpm to 600ktpm and the acquisition, replacement, or major overhaul of assets required to sustain operations.
Although courts generally “are properly very skeptical” that product design changes harm competition, it is well established that in certain circumstances a monopolist’s product changes can do precisely that.
Initial Capital Cost Estimates ItemNotes:(1) Totals do not necessarily equal the sum of the components due to rounding adjustments(2) Direct process plant capital costs are based on benchmarking and not from engineering design Sustaining Capital Costs RPA estimates the life-of-mine (“LOM”) sustaining capital for El Domo to be $105 M, which is expected to be funded by operating cash flows.
Initial capital costs total $95 M (including $8 M contingency), which will be expended over a 15 month pre-production design, construction and commissioning period; • Sustaining Capital Costs – includes all costs related to the acquisition, replacement, or major overhaul of assets during the mine life required to sustain operations.
Table 1-9 provides a summary of sustaining capital costs associated with steady state production.Table 1-8 Upfront Capital Costs Summary Upfront Capital Costs Table 1-9 Sustaining Capital Costs Summary Sustaining Capital Costs Operating costs for life of mine total $65.82 million equating to an operating cost of $60.0 per tonne milled.