Task B definition

Task B. Review City planning documents, conduct research and analyze data
Task B. Boundary Region Fort Ord was established as a U.S. Army post by the Department of Defense in 1917 and proposed for closure in 1991 by the Base Realignment Commission. In 1994, the State legislature created the Fort Ord Reuse Authority (FORA) to oversee the reuse and redevelopment of the former military base, which includes more than 45 square miles of the former Fort Ord (also referred to as the Ord Community). A small portion of the former Ft. Ord remains under Army control and is now called the Presidio of Monterey Annex. Other property within the former Fort Ord falls under the following jurisdictions: the Bureau of Land Management, the cities of Seaside, Marina, Monterey, and Del Rey Oaks, the County of Monterey, the University of California, California State University at Monterey Bay, and the Presidio of Monterey Annex. The California Department of Parks and Recreation administers the Fort Ord Dunes State Park area that stretches along the western portion of the former Fort Ord between Highway 1 and the ocean. • This task will describe current and anticipated water supply needs as they relate to the two IRWM planning regions and how the various jurisdictions propose to meet those needs. This task will provide additional details about: geography, jurisdictional boundaries including political boundaries, special districts, and agency boundaries; service areas for water and wastewater providers; hydrogeology; hydrology; economics/Industry; and population and population trends (including MHI). Potable water is provided to customers overlying the SGB by MCWD, CAW, and one other water distribution system. Over 90% of the water within the CAW service area is delivered by CAW, which operates its main and three satellite water distribution systems in the area. MCWD provides municipal supply water to existing and future developed areas on the former Fort Ord military base. Within the SGB, this includes the residential areas and schools surrounding the Bayonet and Blackhorse golf courses. The water is obtained from xxxxx near Marina, in the Xxxxxxx River Groundwater Basin. The City of Seaside operates a single municipal supply system in the SGB to serve residential customers in a part of the city. MCWD provides water for residents in the City of Marina and former Fort Ord. MCWD provides water solely from groundwater xxxxx extracting from the Xxxxxxx Valley Groundwater Basin. The principal nonpotable use of water in the SGB is irrigation of golf courses. The Lag...
Task B. Land Use Assumptions (LUA) B1: Development of LUA The impact fee CIP is required to be based upon a set of adopted LUAs, which includes a “description of the service area(s) and projections of changes in land use, densities, intensities, and population in the service area over at least a ten-year period.” Although no particular format is specific in the Texas statue, the key components of the LUAs include description and analysis of existing conditions, determination of service areas (s) for capital facilities and 10-year growth projections. For water and wastewater planning, a discussion of an ultimate or “build out” development assumption will also be prepared to facilitate identification of full system needs, as well as 10-year needs (attributable to new growth). LUAs will be prepared for the City and service area boundaries of water/wastewater facilities. For the most part, the study area boundaries for roads and water/wastewater coincide with city limits, except for a small area of service for water/wastewater which extends into the City of Mansfield jurisdiction. Key elements of the LUA report include:  Coordination and correlation of LUA with service areas for roads, water and wastewater  Documentation of existing growth rates, trends and socio-demographics  Development of base, 10-year and ultimate or build-out projections  Land use, population and employment assumptions for the projection periods  Supporting documentation population and employment data by traffic survey zone and service areas for 2015 and 2025 Data for the LUA will be developed from the recently approved 2014 Water/Wastewater Master planning effort and supplemented with data provided by the City for development activity that has occurred since the demographic data of the master plan. Data to be provided by the City include residential (added single and multi-family dwelling units) and square footage (or acreage) of developed non-residential uses within the city and water/wastewater planning areas. Data will be by traffic survey zones (TSZ) to facilitate both the roadway and water/wastewater service area analyses. The provision of electronic data (GIS Shapefile) is envisioned. The FNI team will coordinate with the city on specific data needs. B2: Confirmation of Growth Rates with CIPAC Because LUAs have a critical effect on capital improvements identification and programming, our approach will be to obtain confirmation of 10-year growth rates from the CIPAC as early as possibl...

Examples of Task B in a sentence

  • The Task B Quality Assurance Project Plan (Task B.5) documents the objectives, monitoring framework, sample frequency and duration, and analytical methods to be used at the home sites.

  • Map right-of-way information on the same base mapping as the existing conditions – Task B).

  • Task B of the Florida Onsite Sewage Nitrogen Reduction Strategies Study (FOSNRS) includes performing field experiments to critically evaluate the performance of nitrogen removal technologies that were identified in FOSNRS Task A.9 and pilot tested in TaskA.26.

  • Organize discussions on Task B to be specific to the different categories of pest control (i.e., Fumigation, Lawn and Ornamental, General Household Pest Control, and Termite).

  • Task B of the Florida Onsite Sewage Nitrogen Reduction Strategies Study (FOSNRS) includes performing field experiments to critically evaluate the performance of nitrogen removal technologies that were identified in FOSNRS Task A.9 and pilot tested in PNRSII.

  • The IS will incorporate existing information from the City’s “General Plan - EIR” and “Bicycle Master Plan - Mitigated Negative Declaration” to be supplemented with the information gathered in Task B.

  • From this, during the first year, we expect to sell roughly 125 smoke detectors and 42 dismounting tools every month, which is also the least amount that we can expect to be per month.

  • The classifications of onsite technologies that will be eva- luated in Task B have been identified and prioritized in FOSNRS Tasks A.1 through A.9 and include two stage biofiltration using solid phase electron donor media for denitrifica- tion, addition of denitrification biofilters to existing aerobic nitrifying systems, and in situ vertical flow biofilters (Hazen and Sawyer, 2009a, 2009b, 2009c, 2009d).

  • The research team’s approach to the study involved five tasks: □ Task A: Literature review and issue identification □ Task B: Focus group review of Task A findings and selection of issues for further research □ Task C: Analysis of issues selected in Task B □ Task D: Focus group review of Task C findings □ Task E: Final report and guidance 8Rhode Island, “Regulations for Accommodating Utility Facilities within Public Freeway Rights-of-Way,” 1990.

  • Powers, 293 U.S. 214 (1934).43As used herein, the term “bond” is intended to refer to any municipal obligation, including, but not limited to, bonds, notes, leases and certificates of participation.44Although participants in the Task B focus group viewed risk to the tax-exempt status of bonds as a significant potential issue, it was not a prominent issue in the case studies.


More Definitions of Task B

Task B. Lump Sum Fee: $2,400.00
Task B. Prepare the First Year Annual Action Plan and Facilitate Plan Review Process
Task B. Refine Project Alternatives
Task B. Review City planning documents, conduct research and analyze data 5) conduct research, and analyze data in order to identify housing and community development needs and priorities. 6) Develop required maps using CPD Maps or GIS software to show areas of minority and low-income concentration, low- and moderate-income areas, and distribution of resources. Task C: Conduct a Housing Market Analysis and Housing & Homeless Needs Assessment
Task B. The dissemination process was initialized by different activities from all ABs. A new Logo was created. The website was established offering information by choice of both the foregoing EUTOPA project and the running EUTOPA-IP including the newsletters and an internal space (Ac- tion B1). Already in 2009 Journal Articles were published (Action B2) and Presentations were given (Action B2). First Newsletter was published in March 2010 (Action B4) media followed EUTOPA with attention (Action B5).
Task B shall have the meaning ascribed to it in Section 2.1.1.2.

Related to Task B

  • Task Order means a separate order issued under this Contract.

  • Statement of Work means the description of activities performed in completing the Project, as specified in the Contract and as may be amended.

  • Work Plan means a plan that describes each individual activity to be conducted to complete eligible activities and the associated costs of each individual activity.

  • municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;

  • Task means the amount of work to be done by one individual worker or a gang in order to earn one day’s wage.

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • Work Order means an individually negotiated document that is executed by both Parties and which authorizes a Project, if any, in an indefinite quantity Contract.

  • Project Description means the document that describes the Project's Reduction activities and that uses either the VCS Project Description Template or the project description template specified by the relevant Approved GHG Program;

  • Project Number means a unique number assigned to the project by the department or the city, village, town or county that is undertaking the project.

  • Service Description means pre-defined descriptions of services found at http://www.sap.com/servicedescriptions current as of the effective date of the Order Form which in conjunction with a Scope Document (if any) defines the Services to be provided and becomes part of the Order Form.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Service Descriptions means user manuals and other documentation relating to the Services that are made available to Customer by Provider in digital or hardcopy form, as updated from time to time.

  • Maintenance Services means SAP’s then-current maintenance and/or support services offered under and described in detail in the applicable SAP PartnerEdge Model.

  • Programme of work means the Programme of work submitted by the contractor and approved by the Engineer-in-charge and includes an amendment thereto made from time to time and approved by the Engineer-in-charge;

  • Scope of Work means the description of Services and Deliverables specified in the Contract and as may be amended.

  • Support and Maintenance Services means the support and maintenance services described in Section 1 of these Support Terms.

  • SOW means the document specifying, without limitation, the scope, objective, and time frame of the Work that Supplier will perform for Cisco.

  • Cost of work , in table above, shall mean the agreement amount of the work.

  • Project Plans mean the plans for the Project that are attached to this Agreement as Exhibit “B.”

  • Scope of Works means the sections of the RFQ detailing the technical requirements of the work to be carried out as existing at the Date of Acceptance of the Quotation and any modification of such Works thereafter directed or the use of which has been permitted by the Superintendent for the purposes of the Contract.

  • Manufacturing Services means the manufacturing, quality control, quality assurance, stability testing, packaging, and related services, set forth in this Agreement, required to manufacture Product or Products from Active Materials and Components;

  • development charge means a charge imposed pursuant to this By-law;

  • Integrated Development Plan means a plan formulated and approved as envisaged in Section 25 of the Municipal Systems Act 2000, as amended.