The DRAWINGS / MAPS definition

The DRAWINGS / MAPS means the drawing/map or drawings/maps mentioned in NIT and any modifications of them approved by the Employer or any further Working drawings/maps or sketches by the Employer or any further working drawings/maps or sketches which may be furnished or approved in writing by the Employer.

Related to The DRAWINGS / MAPS

  • Contract Drawings means only those drawings specifically entitled as such and listed in the Specifications or in any Addendum, or any drawings furnished by the Commissioner, pertaining or supplemental thereto.

  • Record Drawings means a reproducible set of Construction Documents into which the Architect has incorporated: (a) clarifications, sketches and other Modifications made by the Architect during the Construction Phase; and (b) significant changes in the Work made during construction as shown on the Trade Contractor’s As-Built Drawings.

  • Working Drawings means the final working drawings approved by Landlord, as amended from time to time by any approved changes thereto, and “Work” means all improvements to be constructed in accordance with and as indicated on the Working Drawings, together with any work required by governmental authorities to be made to other areas of the Building as a result of the improvements indicated by the Working Drawings. Landlord’s approval of the Working Drawings shall not be a representation or warranty of Landlord that such drawings are adequate for any use or comply with any Law, but shall merely be the consent of Landlord thereto. Tenant shall, at Landlord’s request, sign the Working Drawings to evidence its review and approval thereof. After the Working Drawings have been approved, Tenant shall cause the Work to be performed in accordance with the Working Drawings.

  • Construction Drawings means those drawings containing the technical details associated with the design, construction and installation of the Infrastructure;

  • Shop Drawings means drawings, submitted to the PHA by the Contractor, subcontractor, or any lower tier subcontractor, showing in detail (1) the proposed fabrication and assembly of structural elements and (2) the installation (i.e., form, fit, and attachment details) of materials of equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract. The PHA may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

  • As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record

  • Shop Drawing means any and all drawings, diagrams, layouts, explanations, illustrations, manufacturer's drawings or other written or graphic materials which illustrate any portion of the construction work.

  • Final Drawing has the meaning specified in Section 3.05(i).

  • Record drawing or “as-builts” means a set of reproducible drawings which show significant changes in the work made during construction and which are usually based on drawings marked up in the field and other data furnished by the contractor.

  • Drawings means the drawings prepared by the Architects and issued by the Engineer and referred to in the specifications and any modifications of such drawings as may be issued by the Engineer from time to time ‘Contract value shall mean value of the entire work as stipulated in the letter of acceptance of tender subject such additions there to or deductions there from as may be made under the provide herein after contained.

  • General Arrangement Drawings shall have the meaning set forth in Clause 3.1 (iii) (b);

  • Line Item means a field of information (or a combination of fields of information) to be entered in a Settlement Schedule by any Participating Subscriber in relation to a Conveyancing Transaction.

  • Project Preparation Advance means the project preparation advance granted by the Association to the Borrower pursuant to an exchange of letters dated April 28, 1994 and May 21, 1994 between the Borrower and the Association;

  • Interest Drawing has the meaning assigned to such term in Section 3.6(a).

  • Design Criteria Package means concise, performance-oriented drawings or specifications for a public construction project. The purpose of the Design Criteria Package is to furnish sufficient information to permit Design-Build Firms to prepare a bid or a response to the District’s Request for Proposals, or to permit the District to enter into a negotiated Design- Build Contract. The Design Criteria Package must specify performance- based criteria for the public construction project, including the legal description of the site, survey information concerning the site, interior space requirements, material quality standards, schematic layouts and conceptual design criteria of the project, cost or budget estimates, design and construction schedules, site development requirements, provisions for utilities, stormwater retention and disposal, and parking requirements applicable to the project. Design Criteria Packages shall require firms to submit information regarding the qualifications, availability, and past work of the firms, including the partners and members thereof.

  • Non-Extension Drawing has the meaning specified in Section 3.5(d).

  • Space Plan means the space plan to be prepared by Tenant in accordance with paragraph 2 below and approved by Landlord and Tenant, and showing the general configuration of the Tenant Improvements.

  • Punch List Items means such items (i) as are reasonably necessary or appropriate to fully complete the construction, equipping and furnishing of the Hotel in accordance with this Contract and (ii) that, unless otherwise agreed by Buyer in its sole discretion, (a) individually and in the aggregate do not and will not prohibit, cause a delay in or otherwise adversely affect, under applicable Legal Requirements, the Franchise Agreement or otherwise, the opening of the Hotel for business to the public or the continued occupancy and operation of the Hotel as contemplated under the Brand and (b) may be corrected or completed, subject to delays caused by Force Majeure, within not more than sixty (60) days.

  • Mine drainage means any drainage, and any water pumped or siphoned, from an active mining area or a post-mining area. The abbreviation “ml/l” means milliliters per liter.

  • Special Drawing Rights and the symbol “SDR” mean special drawing rights as valued by the International Monetary Fund in accordance with its Articles of Agreement”;

  • Loan Transmittal Summary Forms means the forms related to each Xxxx of Sale provided to the Seller by the Purchaser and completed by the Seller which list, by Borrower, (i) the Loans subject to the related Xxxx of Sale and (ii) the outstanding Principal Balance and accrued interest thereof as of the related Cutoff Date.

  • Punchlist Items means any items necessary at the time of the issuance of a temporary certificate of occupancy to complete fully the renovation of the Project Facilities in accordance with the Plans and Specifications for the Project Facilities, or required for the issuance of a final certificate of occupancy or its equivalent.

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • CREFC® Collateral Summary File The data file in the “CREFC® Collateral Summary File” format substantially in the form of and containing the information called for therein, or such other form for the presentation of such information as may be approved from time to time by the CREFC® for commercial mortgage securities transactions generally.

  • Project Budget means the budget and project description included in the grant application. The Project Budget must succinctly describe all major elements of project work, the estimated cost of each, and clearly allocate requested grant funding and match contributions to each.