General Arrangement Drawings definition

General Arrangement Drawings shall have the meaning set forth in Clause 3.1 (iii) (b);
General Arrangement Drawings shall have the meaning set forth in Clause 3.1 (iii) (b); “GOI” or “Government” means the Government of India; “Good Industry Practice” means the practices, methods, techniques, designs, standards,skills,diligence,efficiency,reliabilityandprudencewhicharegenerallyand reasonably expected from a reasonably skilled and experienced contractor engaged in the same type of undertaking as envisaged under this Agreement and which would be expected to result in the performance of its obligations by the Contractor in accordance with this Agreement, Applicable Laws and Applicable Permits in reliable, safe, economical and efficientmanner; Contract AgreementPage 21 of 153 “Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Kachukhana Harichara Paglagaunj to Dhubri - Phulbari Bridge approach (Package-II) of Srirampur - Dhubri Section of NH-127B from existing Km 28.050 to Km 55.060 (Design Km 27.650 to Km 54.154), (Design Length=26.504 Km) on EPC Mode in the State of Assam under JICA - ODA loan assistance.” Mar 2022 “Government Instrumentality” means any department, division or sub- division of the Government or the State Government and includes any commission, board, authority, agency or municipal and other local authority or statutory body including panchayat under the control of the Government or the State Government, as the case may be, and having jurisdiction over all or any part of the Project Highway or the performance of all or any of the services or obligations of the Contractor under or pursuant to this Agreement; “Handover Memorandum” shall have the meaning set forth in Clause 8.2; “IRC” means the Indian Roads Congress; “Indemnified Party” means the Party entitled to the benefit of an indemnity pursuant to Article 25; “Indemnifying Party” means the Party obligated to indemnify the other Party pursuant to Article 25; “Indirect Political Event” shall have the meaning set forth in Clause 21.3; “Insurance Cover” means the aggregate of the maximum sums insured under the insurance taken out by the Contractor pursuant to Article 20, and includes all insurances required to be taken out by the Contractor under Clauses 20.1 and 20.9 but not actually taken, and when used in the context of any act or event, it shall mean the aggregate of the maximum sums insured and payable or deemed to be insured and payable in relation to such act orevent; “Intellectual Property” means all patents, trademarks, service marks, logos,...
General Arrangement Drawings shall have the meaning set forth in Clause 3.1 (iii) (b); “GOI” or “Government” means the Government of India;

Examples of General Arrangement Drawings in a sentence

  • General Arrangement Drawings of all plant, control boards, fittings and apparatus or any part thereof and of installation layout arrangement of such plant and apparatus.

  • The designs and drawings shall be made according to the conditions and relevant codes mentioned in the General Arrangement Drawings supplied by the railway for the work.

  • Where any relevant code is not mentioned in the General Arrangement Drawings, the designs and drawings shall confirm to the codes and specifications mentioned hereunder for various types of structures.

  • Where any provision in General Arrangement Drawings differs from that in the codes mentioned hereunder, the former shall prevail.

  • General Arrangement Drawings Plot Plan Single-Line Diagrams with metering and Point of Interconnection clearly shown EXAMPLE SINGLE-LINE DIAGRAM Heat Balance DiagramFor those resources that burn fuel, then provide a heat balance diagram for each fuel type used.

  • The final location will be decided during the installation stage as per the site conditions and the General Arrangement Drawings & Site Layout Plan submitted during the design stage.

  • General Arrangement Drawings including conceptual structural drawings with approximate sizes, type of material and brief specification ensuring conformity to technical requirements.

  • Connection shall terminate at a 50 foot elevation as shown on the General Arrangement Drawings.

  • General Arrangement Drawings for Road Sign, Markings, and other Facilities.

  • Six (6) sets of complete descriptive catalogue, Dimensional General Arrangement Drawings, detailed parts list of each and every item are to be furnished by the successful tenderer to enable us to verify the items at the time of receipt & installation.


More Definitions of General Arrangement Drawings

General Arrangement Drawings shall have the meaning set forth in Clause 3.1 (iii) (b); “GOI” or “Government” means the Government of India; “Good Industry Practice” means the practices, methods, techniques, designs, standards,skills,diligence,efficiency,reliabilityandprudencewhicharegenerallyand reasonably expected from a reasonably skilled and experienced contractor engaged in the same type of undertaking as envisaged under this Agreement and which would be expected to result in the performance of its obligations by the Contractor in accordance with this Agreement, Applicable Laws and Applicable Permits in reliable, safe, economical and efficientmanner; Contract AgreementPage 20 of 160 “Widening / Improvement to 4 (Four) Lane with Paved Shoulder configuration of existing single lane road from Srirampur (near Bhairiguri Village) to Kachukhana Harichara Paglagaunj (Package-I)
General Arrangement Drawings shall have the meaning set forth in Clause 3.1 (iii) (b); “GOI” or “Government” means the Government of India; “Good Industry Practice” means the practices, methods, techniques, designs, standards,skills,diligence,efficiency,reliabilityandprudencewhicharegenerallyand reasonably expected from a reasonably skilled and experienced contractor engaged in the same type of undertaking as envisaged under this Agreement and which would be expected to result in the performance of its obligations by the Contractor in Contract AgreementPage 20 of 159 Widening & Upgradation to 4-lane with paved shoulder from km 16.700 (end of Seer Hamdan Bypass) to km 39.450 (start of Pahalgam Bypass), Package-II of Khanabal - Pahalgam - Chandanwadi - Baltal section of NH-501 in the UT of Jammu & Kashmir on EPC Mode January’ 2024
General Arrangement Drawings shall have the meaning set forth in Clause 3.1 (iii) (b); “GOI” or “Government” means the Government of India; “Good Industry Practice” means the practices, methods, techniques, designs, standards,skills,diligence,efficiency,reliabilityandprudencewhicharegenerallyand reasonably expected from a reasonably skilled and experienced contractor engaged in the same type of undertaking as envisaged under this Agreement and which would be expected to result in the performance of its obligations by the Contractor in accordance with this Agreement, Applicable Laws and Applicable Permits in reliable, safe, economical and efficientmanner; “Government Instrumentality” means any department, division or sub- division of the Government or the State Government and includes any commission, board, Contract AgreementPage 20 of 251 Construction of Service Road and RCC Drain on both sides of NH 37A from Kaliabor –Tiniali- (Km 0.000) to Kolong Bridge (Km 0.600) in Nagaon district in the state of Assam under EPC Mode Nov 2023
General Arrangement Drawings means the documents of that description certified as the general arrangement drawings by the Secretary of State for the purposes of this Order;
General Arrangement Drawings shall have the meaning set forth in Clause 3.1 (iii) (b); “GOI” or “Government” means the Government of India; “Good Industry Practice” means the practices, methods, techniques, designs, standards,skills,diligence,efficiency,reliabilityandprudencewhicharegenerallyand reasonably expected from a reasonably skilled and experienced contractor engaged in the same type of undertaking as envisaged under this Agreement and which would be expected to result in the performance of its obligations by the Contractor in accordance with this Agreement, Applicable Laws and Applicable Permits in reliable, safe, economical and efficientmanner; Contract AgreementPage 20 of 151 “Construction of Four Lane Badarpur Bypass from Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Siddeswar Pt.-I Village to Design Chainage km 38+600 on NH-37 (Old NH-44) at Kandigram Chaita Village in the State of Assam on EPC Mode under Bharatmala Pariyojana in Economic Corridors (Project Length – 11.3

Related to General Arrangement Drawings

  • As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record

  • Shop Drawings means drawings, submitted to the PHA by the Contractor, subcontractor, or any lower tier subcontractor, showing in detail (1) the proposed fabrication and assembly of structural elements and (2) the installation (i.e., form, fit, and attachment details) of materials of equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the Contractor to explain in detail specific portions of the work required by the contract. The PHA may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.

  • First draw sample means a one−liter sample of tap water that has been standing in plumbing pipes at least 6 hours and is collected without flushing the tap.

  • Construction Contract or “contract” means a written agreement between a contractor and a public agency for the construction, alteration, demolition, or repair of a facility, other than a contract having a dollar value of less than $30,000.00 or a contract that provides for 3 or fewer payments.

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.