Unanticipated equipment outage definition

Unanticipated equipment outage means an unexpected outage due to equipment failure.

Related to Unanticipated equipment outage

  • Maintenance Outage means NERC Event Type MO, as set forth in attached Exhibit B, and includes any outage involving ten percent (10%) of the Facility’s Net Output that is not a Forced Outage or a Planned Outage.

  • Compression Ignition Engine means an internal combustion engine with operating characteristics significantly similar to the theoretical diesel combustion cycle. The regulation of power by controlling fuel supply in lieu of a throttle is indicative of a compression ignition engine.

  • Covered Equipment means, unless otherwise specified in a Schedule, Covered Property:

  • Fixed Equipment means any property affixed in any way to the Licensed Premises existing at the time Notice to Proceed is given, whose removal would damage the Licensed Premises.

  • Interconnection equipment means a group of components or an integrated system owned and operated by the interconnection customer that connects an electric generator with a local electric power system, as that term is defined in Section 3.1.6.2 of IEEE Standard 1547, or with the electric distribution system. Interconnection equipment is all interface equipment including switchgear, protective devices, inverters or other interface devices. Interconnection equipment may be installed as part of an integrated equipment package that includes a generator or other electric source.

  • Standard equipment means the basic configuration of a vehicle which is equipped with all the features that are required under the regulatory acts of the Contracting Party including all features that are fitted without giving rise to any further specifications on configuration or equipment level.

  • Workaround means a temporary modification to or change in operating procedures for the Work that: (i) circumvents or effectively mitigates the adverse effects of a Defect so that the Work complies with and performs in accordance with the applicable Specifications and Documentation; (ii) does not require substantial reconfiguration of the Work or any reloading of data; and (iii) does not otherwise impose any requirements that would impede an end user’s efficient use of the Work.

  • Unscheduled Outage means any outage that is not a “Scheduled Outage”. “Committed Time” shall mean, as to each Business Day, one hour before the trading session for that day is scheduled to open on the NYSE and one hour after the trading session on the NYSE for that day finally closes, but excluding the following periods of Scheduled Outage (defined below). A “Scheduled Outage” shall mean (1) those time periods from 12 AM Saturday to 6:00 AM Sunday each week and 11:00 PM to 12:00 AM daily, during which Computershare’s System maybe unavailable due to routine maintenance; and (2) any time period as to which Company has received prior notice. ≥99.5% <99.5% to ≥98% <98%

  • Field emission equipment means equipment which uses an x-ray tube in which electron emission from the cathode is due solely to the action of an electric field.

  • fall prevention equipment means equipment used to prevent persons from falling from a fall risk position, inducing personal equipment, a body harness, lanyards, lifelines or physical equipment such as guard-rails, screens, barricades, anchorages or similar equipment;

  • Electrical equipment means underground equipment that contains dielectric fluid that is necessary for the operation of equipment such as transformers and buried electrical cable.

  • Customer Equipment means hardware, software, systems, cabling and facilities provided by you and used in conjunction with the Equipment that we supply to you in order to receive the Services;

  • Generator Maintenance Outage means the scheduled removal from service, in whole or in part, of a generating unit in order to perform necessary repairs on specific components of the facility, if removal of the facility meets the guidelines specified in the PJM Manuals.

  • Scheduled Outage has the meaning given to it in the Grid Code;

  • Supplier Equipment means the Supplier's hardware, computer and telecoms devices, equipment, plant, materials and such other items supplied and used by the Supplier (but not hired, leased or loaned from the Customer) in the performance of its obligations under this Call Off Contract;

  • Planned Outage means the removal of equipment from service availability for inspection and/or general overhaul of one or more major equipment groups. To qualify as a Planned Outage, the maintenance (a) must actually be conducted during the Planned Outage, and in Seller’s sole discretion must be of the type that is necessary to reliably maintain the Project, (b) cannot be reasonably conducted during Project operations, and (c) causes the generation level of the Project to be reduced by at least ten percent (10%) of the Contract Capacity.

  • Metering Equipment means all metering equipment installed at the metering points designated in the appropriate appendix to an Interconnection Service Agreement. Minimum State of Charge:

  • Generator Planned Outage means the scheduled removal from service, in whole or in part, of a generating unit for inspection, maintenance or repair with the approval of the Office of the Interconnection in accordance with the PJM Manuals.

  • Project Equipment means the items of machinery, equipment or other personal property used in connection with the construction and development of the Project pursuant to the provisions hereof, and all replacements thereof and substitutions therefor made pursuant to this Agreement.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Service Equipment means any equipment, Software, systems, cabling and facilities provided by or on behalf of Verizon and used to facilitate provision of the Services at a Customer Site. Ownership of the Service Equipment does not pass to Customer. Service Equipment does not include Verizon Facilities.

  • Load Control Equipment means the equipment (which may include, but is not limited to, ripple receivers and relays) that is from time to time installed in, over or on Consumer’s Premises for the purpose of receiving signals sent by Load Signalling Equipment and switching on and off, or otherwise controlling, controllable load;

  • Designated Equipment means either: (i) a server identified by serial number, or host I.D. on which the Licensed Materials are stored; or (ii) a computer or workstation, as identified by its serial number, host I.D. number or Ethernet address; to which the Licensed Materials are downloaded and Used only upon the issuance of a License Key. The Designated Equipment shall be of a manufacture, make and model, and have the configuration, capacity (i.e., memory/disk), operating software version level, and pre- requisite and co-requisite applications, prescribed in the Documentation as necessary or desirable for the operation of the Software.

  • CONSTRUCTION EQUIPMENT means all appliances and equipment of whatsoever nature for the use in or for the execution, completion operation or maintenance of the work unless intended to form part of permanent work.

  • Unplanned Outage refers to the unavailable status of the units of the Power Plant other than Planned Outage. Based on the urgency of the needs of outage, the Unplanned Outage can be classified into five categories: (1) immediate outage; (2) the outage which could be delayed for a short while but the units must exit within six hours; (3) the outage which could be postponed over six hours but the units must exit within seventy-two hours; (4) the outage which could be deferred over seventy-two hours but the units must exit before the next Planned Outage; and (5) the prolonged outage which is beyond the period of the Planned Outage.

  • Production equipment (1 7 9) means tooling, templates, jigs, mandrels, moulds, dies, fixtures, alignment mechanisms, test equipment, other machinery and components therefor, limited to those specially designed or modified for "development" or for one or more phases of "production".