100% Construction Documents Sample Clauses

100% Construction Documents. Upon the Department’s approval of the Interim Construction Document Submission, the Professional shall finalize the Construction Documents, on or before the date provided in the final Time Schedule, as amended, and shall submit the same for review and approval to the Department and for review by the Client Agency. The submission shall include the recommendation for the number of calendar days for construction and the number of calendar days for Temporary Heat. This submission shall include working drawings setting forth all items necessary for bidding and proper execution of the Work including but not limited to, materials, workmanship, finishes, mechanical and electrical systems, special equipment, site work, and utility connections and services. The Construction Documents shall be detailed in accordance with the requirements of the Bureau of Pre-Construction Project Procedure Manual.
AutoNDA by SimpleDocs
100% Construction Documents. No later than the 100% Construction Document Deadline set forth in “Exhibit D”, and based on the approved ninety percent (90%) complete Construction Documents, A/E shall prepare and deliver to TFC the proposed one hundred percent (100%) complete Construction Documents and the 100% Construction Document Cost Estimate review comments. If such estimate exceeds the Budget, A/E shall consult with TFC to identify further potential Drawing and/or Specification modifications that bring the estimate into compliance with the Budget. Approved modifications shall be incorporated into the Construction Documents at no cost to TFC in the event TFC determines in its sole discretion that such changes are the responsibility of A/E.
100% Construction Documents. Permit Submittal to PP&R PM All Team a. Stamped Drawings 4 24 24 24 b. Stamped Specifications 1 4 Stamped Final Design Calculations (Includes incorporating additional calcs c. and preparing final package for permitting) 1 4 4
100% Construction Documents. Permit Submittal to PP&R PM All Team a. Stamped Drawings 8 24 12 12 8 34 24 b. Stamped Specifications 2 4 4 4 4 2 d. Updated Cost Estimate RLB/team review 1 1 1 1 1 e. Permit Application Forms and support documentation 2 1 1 1 1 1 Owner review and approval Hours 2 17 120 93 90 78 47 156 99 15 Rate $255 $255 $215 $185 $185 $185 $185 $145 $120 $115 Fee $510 $4,335 $25,800 $17,205 $16,650 $14,430 $8,695 $22,620 $11,880 $1,725 $ 123,850.00
100% Construction Documents. Permit Submittal to PP&R PM a. Stamped Drawings All Team 4 2 30 b. Stamped Specifications 2 4 c. Stamped Final Design Calculations 2 8 d. Updated Cost Estimate RLB/team review 1 2
100% Construction Documents. Meetings. • Meetings with the Owner and Design Builder during this Phase shall be included as part of the HCAA Project No. 8430 22, Bag Claim Level Ceiling Replacement project.
100% Construction Documents. 1. Provide assistance with the coordination of the lighting design with the architectural and electrical design.
AutoNDA by SimpleDocs
100% Construction Documents. During this project phase, the C&T consultants will attend meetings and progress the C&T design for the Baggage Claim Level toward GMP pricing by the Design-Builder. The construction documents will be developed to show the design in enough detail to provide for the establishment of a GMP. The following tasks are included in this phase:
100% Construction Documents. 2.13.4.4.1 One (1) set: Clear background, reproducible copy of stamped Drawings.
100% Construction Documents. Designer/Builder shall be complete with this phase upon: