Advanced Metering Systems Sample Clauses

Advanced Metering Systems. TC.19 Appliance/Plug-load reductions - ECMs such as but not limited to: • Replace air-cooled ice/refrigeration equipment • Replace refrigerators • De-lamp vending machines • Plug timers • Energy Star® products TC.20 Future ECMs - (not currently authorized): • Non-Building Applications SAMPLE DELIVERABLES FOR TASK ORDERS Pre-award Deliverables Sample: Item Deliverable Frequency Due ªCopies ªRecipient 1 Preliminary Assessment One time Per contractor schedule 6 (2/4) • Agency Contracting Officer (CO) (1/0) • Agency COR (1/1) • DOE COR (0/1) • DOE CO (0/1) � PF (0/1) 2 Draft IGA One time Per contractor schedule 5 (2/3) • Agency CO (1/0) • Agency COR (1/1) • DOE COR (0/1) � PF (0/1) 3 Draft Proposal One time Per contractor schedule 5 (2/3) • Agency CO (1/0) • Agency COR (1/1) • DOE COR (0/1) � PF (0/1) 4 Final IGA/Final Proposal One time Per contractor schedule 5 (2/3) • Agency CO (1/0) • Agency COR (1/1) • DOE COR(0/1) • DOE CO (0/1) 5 Evidence of surety commitment One time Per contractor schedule 1 • Agency CO (1/0) ªRequired formats for and numbers of submittals are indicated in parentheses (hard copy/electronic pdf on CD-ROM) Post-award Deliverables Sample: Item Deliverable Frequency Due ªCopies ªRecipient 1 Signed Task Order One time Upon Receipt from agency 2 (1/1) • Agency CO (1/0) • DOE CO (0/1) 2 Certificate of Insurance One time 15 days after TO award 1 (1/0) • Agency CO (1/0) 3 Performance Bond One time 30 days after TO award 1 (1/0) • Agency CO (1/0)
AutoNDA by SimpleDocs
Advanced Metering Systems. A system that collects time-differentiated energy usage data from advanced meters via a network system on either an on-request or defined schedule basis. The system shall have the capability to read real and lapsed time power usage, trend data (KW usage), cost reporting (KWH readings) data, and power factor. This collected information will support energy use management, procurement, and operations, U.S. Department of Energy, EERE: Guidance for Electric Metering in Federal Buildings, (February 3, 2006).
Advanced Metering Systems. 1.1. Withdrawing Request for Certificates of Public Convenience and Necessity and Cost Recovery for Advanced Metering Systems. The Utilities agree to withdraw their requests for the Commission to grant certificates of public convenience and necessity (“CPCNs”) and to approve cost recovery in these base rate proceedings for the Utilities’ proposed full deployment of Advanced Metering Systems (“AMS”). The Parties agree that the Utilities’ withdrawal of their requests for CPCNs and cost recovery for AMS in these proceedings does not preclude the Utilities from having full AMS deployment considered in future proceedings.

Related to Advanced Metering Systems

  • PATROL VIDEO SYSTEMS 2 1. As part of the law enforcement services to be provided to CITY, COUNTY 3 has provided, or will provide, patrol video systems (hereinafter called “PVS”) 4 that are or will be mounted in patrol vehicles designated by COUNTY for 5 use within CITY service area.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Metering Equipment 13.01. Utility will furnish, install, own and maintain metering equipment capable of measuring the flow of kilowatt-hours (kWh) of energy. The Customer's service associated with the CRG will be metered at a single metering point. The metering equipment will measure energy delivered by Utility to Customer and also measure energy delivered by Customer to Utility. Customer agrees to provide safe and reasonable access to the premises for installation of this equipment and its future maintenance or removal.

  • Installation Services 3.1 The Bitstream 2a Service includes a Standard Install as set out below (in each case to the extent that the relevant provisioning works are not already complete for the relevant Service Order).1

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct. Interconnection Service does not necessarily provide the Interconnection Customer with the capability to physically deliver the output of its Large Generating Facility to any particular load on the CAISO Controlled Grid without incurring congestion costs. In the event of transmission constraints on the CAISO Controlled Grid, the Interconnection Customer's Large Generating Facility shall be subject to the applicable congestion management procedures in the CAISO Tariff in the same manner as all other resources.

  • Net Metering If you generate electricity from a renewable generating facility to offset your electricity consumption and/or use net metering at any time during the term of this Agreement, you must notify Starion.

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • Advanced Services As a general matter, shall have the meaning set forth by the FCC.

  • Customer Equipment Customer represents and warrants that it owns or has the legal right and authority, and will continue to own or maintain the legal right and authority during the term of this Agreement, to place and use the Customer Equipment as contemplated by this Agreement. Customer further represents and warrants that its placement, arrangement, and use of the Customer Equipment in the Internet Data Centers complies with the Customer Equipment Manufacturer's environmental and other specifications.