Age Control Sample Clauses

Age Control. If Retailer is a Video Lottery Game Retailer, then Retailer agrees to place the Video Lottery Game terminals only in an Age-controlled Area as set forth in the Rules.
AutoNDA by SimpleDocs
Age Control. Materials with defined characteristics, which over time are susceptible to quality degradation through use or storage, shall be clearly identified on the lowest level of unit packaging. The package shall be marked to indicate the critical date the shelf life was initiated and date of expiration. As a minimum, materials shall be marked with the date of manufacture, expiration date, storage temperature and humidity requirements, special handling conditions, in addition to the standard identification requirements. Materials at the date of receipt by TTM Technologies shall have a minimum of seventy-five (75) percent of the usable shelf life remaining.
Age Control. You shall assure that any items provided which have a shelf life limitations have at least 5/6 of the shelf life remaining at time of shipment. Shelf life limited material must be identified with Date of Manufacture and Expiration Date.

Related to Age Control

  • Job Control Personal Data being processed on commission (i.e., Personal Data processed on a customer’s behalf) is processed solely in accordance with the Agreement and related instructions of the customer.

  • Input Control The possibility to subsequently verify and determine whether, and by whom, personal data was entered into, changed or removed from data processing systems must be ensured. • Definition of entry authorisation • Logging of logins

  • Site Control In the total loss of building use scenario, what likely exists will be a smoking pile of rubble. This rubble will contain many components that could be dangerous. It could also contain any personnel on the premises at the time of the disaster. For these reasons, the local fire marshal with the assistance of the police will control the site until the building is no longer a threat to surrounding properties and the companies have secured the site from the general public. During this time, the majority owner of the building should be arranging for a demolition contractor to mobilize to the site with the primary objective of reaching the cable entrance facility for a damage assessment. The results of this assessment would then dictate immediate plans for restoration, both short term and permanent. In a less catastrophic event, i.e., the building is still standing and the cable entrance facility is usable, the situation is more complex. The site will initially be controlled by local authorities until the threat to adjacent property has diminished. Once the site is returned to the control of the companies, the following events should occur. An initial assessment of the main building infrastructure systems (mechanical, electrical, fire and life safety, elevators, and others) will establish building needs. Once these needs are determined, the majority owner should lead the building restoration efforts. There may be situations where the site will not be totally restored within the confines of the building. The companies must individually determine their needs and jointly assess the cost of permanent restoration to determine the overall plan of action. Multiple restoration trailers from each company will result in the need for designated space and installation order. This layout and control is required to maximize the amount of restoration equipment that can be placed at the site, and the priority of placements. Care must be taken in this planning to ensure other restoration efforts have logistical access to the building. Major components of telephone and building equipment will need to be removed and replaced. A priority for this equipment must also be jointly established to facilitate overall site restoration. (Example: If the AC switchgear has sustained damage, this would be of the highest priority in order to regain power, lighting, and HVAC throughout the building.) If the site will not accommodate the required restoration equipment, the companies would then need to quickly arrange with local authorities for street closures, rights of way or other possible options available.

  • Traffic Control The Surveyor shall control traffic in and near surveying operations adequately to comply with provisions of the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI which can be found on the State’s internet site. In the event field crew personnel must divert traffic or close traveled lanes, a Traffic Control Plan based upon principles outlined in the latest edition of the Texas Manual on Uniform Traffic Control Devices – Part VI shall be prepared by the Surveyor and approved by the State prior to commencement of field work. A copy of the approved plan shall be in the possession of field crew personnel on the job site at all times and shall be made available to the State’s personnel for inspection upon request.

  • Access Control Supplier will maintain an appropriate access control policy that is designed to restrict access to Accenture Data and Supplier assets to authorized Personnel. Supplier will require that all accounts have complex passwords that contain letters, numbers, and special characters, be changed at least every 90 days, and have a minimum length of 8 characters.

  • Data Input Control It will be possible to retrospectively examine and establish whether and by whom Personal Data have been entered, modified or removed from SAP data processing systems.

  • Network Access Control The VISION Web Site and the Distribution Support Services Web Site (the “DST Web Sites”) are protected through multiple levels of network controls. The first defense is a border router which exists at the boundary between the DST Web Sites and the Internet Service Provider. The border router provides basic protections including anti-spoofing controls. Next is a highly available pair of stateful firewalls that allow only HTTPS traffic destined to the DST Web Sites. The third network control is a highly available pair of load balancers that terminate the HTTPS connections and then forward the traffic on to one of several available web servers. In addition, a second highly available pair of stateful firewalls enforce network controls between the web servers and any back-end application servers. No Internet traffic is allowed directly to the back-end application servers. The DST Web Sites equipment is located and administered at DST’s Winchester data center. Changes to the systems residing on this computer are submitted through the DST change control process. All services and functions within the DST Web Sites are deactivated with the exception of services and functions which support the transfer of files. All ports on the DST Web Sites are disabled, except those ports required to transfer files. All “listeners,” other than listeners required for inbound connections from the load balancers, are deactivated. Directory structures are “hidden” from the user. Services which provide directory information are also deactivated.

  • Climate Control a. The air conditioning/heating units shall be functional at all times. b. The air discharged from the air conditioner interior vent system shall be continuously cool. c. All air conditioning temperature controls and functions shall operate as originally designed and manufactured with no knobs or components broken or missing. d. Systems shall operate on all OEM speeds with no excessive noise.

  • System Access Control Data processing systems used to provide the Cloud Service must be prevented from being used without authorization.

  • Change Control All systems processing and/or storing PHI COUNTY discloses to 14 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY 15 must have a documented change control procedure that ensures separation of duties and protects the 16 confidentiality, integrity and availability of data.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!