Air Compressor Sample Clauses

Air Compressor. Air Compressor: • Expand air compressor & air dryer capacity, one new 1,000 cfm air compressor with one receiver and one regenerative dryer sized for the application • Air compressor/dryer system will not exceed 80 db noise limits outside compressor shed. • Dryer will provide -40 F dew point air with system operating at full air flow, • One compressor shed
AutoNDA by SimpleDocs
Air Compressor. The air compressor system will demonstrate the ability to generate the designed flow rate of 1,000 cfm compressed air, and a maximum dew point of-40F while generating less than 80 db of noise outside the compressor shed.
Air Compressor. Air compressor shall be a Wabco brand, minimum of 18.7 cubic feet per minute capacity. Air brake system shall be the quick build up type. The air compressor discharge line shall be stainless steel braid reinforced Teflon hose.
Air Compressor. Miscellaneous refrigeration parts and accessories, filters, piping, batteries and parts.
Air Compressor. Enclose air compressor in northwest corner of bay A. Run distribution lines as necessary.
Air Compressor. Quantity (1) Manufacturer Castair Performance 4.6 cfm @ 100 psi Processor (PLC) Xxxxx‐Xxxxxxx CompactLogix, data logging onto flash card and ethernet communication. Operator Interface (HMI) Xxxxx‐Xxxxxxx Panel View 1000 Color Touchscreen. Enclosures Xxxxxxx Concept, Painted Steel, NEMA 4/12 Conduit Liquid‐Tight Flexible Metal Conduit or PVC Rigid Conduit Location Main Control Panel mounted on RO Skid & wired to RO Instruments and Valves. RO Skid Inlet Schedule 80 PVC RO Skid High Pressure Schedule 10 304 Stainless Steel RO Skid Permeate Schedule 80 PVC RO Skid Concentrate Schedule 80 PVC Interconnecting Piping Interconnecting plumbing between RO skid and feed, CIP and flush tanks shall be provided by others. Pump Quantity 3 (antiscalant, acid and sodium bisulfite) Manufacturer Pulsafeeder Type Peristaltic Other In‐line static mixer on RO feed, calibration columns and check valves on chemical lines. Tank Quantity (3) located on RO skid Manufacturer Norwesco Vessel Construction HDPE Capacity 10 gallons, flat bottom Dimensions 13” dia. x 20” hgt. Quantity (3) located on RO skid Manufacturer Penguin Type Drum mixer Tank Quantity (1) shipped loose Manufacturer Norwesco Vessel Construction HDPE Capacity 105 gallons, flat bottom Dimensions 23” dia. x 63” hgt. Pump Quantity (1) located on RO skid Manufacturer Grundfos CMG3‐5 Type Multistage centrifugal Pump Construction Stainless steel Motor HP 2 HP Performance 20 gpm @ 58 psi
Air Compressor. 1) Inspect for proper operation and pressures 2) Check oil level 3) Inspect and drain any accumulated water from water separation filter, replace filter element as necessary to maintain proper operation 4) Inspect all electrical connections for correct amperages and voltages 5) Tighten all electrical connections and ensure that they are free from corrosion 6) Inspect main pneumatic lines for moisture build up.
AutoNDA by SimpleDocs
Air Compressor. Inspect for proper operation and pressures 8) Check oil level
Air Compressor. Inspect for proper operation and pressures
Air Compressor. A. Without waiver of the provisions of the first paragraph of this Section 6.2.5, Tenant shall have the right, at its sole expense, and subject to Tenant obtaining all requisite permits and otherwise in compliance with all applicable codes and laws, to install, maintain, repair, replace and operate an air compressor (the air compressor is referred to as the “Air Compressor”), such Air Compressor to be located in a mutually acceptable location of the loading dock area of the Building or the Premises (the “Air Compressor Area”), provided Tenant shall promptly repair any damage caused to the Building or to the Property caused by reason of such installation and operation. Tenant shall not install the Air Compressor in the Air Compressor Area without Landlord’s prior approval of the manner of and the plans and specifications for such installation and screening if reasonably required by Landlord. If such installation shall result in an increase in premiums for Landlord’s insurance coverage for the Building, then Tenant shall be liable for the increase as Additional Rent hereunder. B. Tenant agrees that upon the expiration or earlier termination of this Lease, Tenant shall, in accordance with subsection 6.1.9 hereof, remove the Air Compressor, at Tenant’s expense, and promptly repair and restore any damage to the Property or the Building due to such removal. If the Air Compressor is not so removed by Tenant upon the expiration of the term of this Lease, then it shall become the property of Landlord and, if Landlord so elects, Landlord shall remove the same and charge Tenant for the cost of removal, including costs, if any, associated with restoration of the Property due to such removal. C. Tenant shall indemnify, defend and hold harmless Landlord from and against any and all claims, costs, expenses, fees or suits arising out of accidents, damage, injury or loss to any and all persons and property, arising from the installation, maintenance, operation and repair of the Air Compressor, unless caused by the fault or negligence of Landlord, its agents, employees and contractors. Tenant shall obtain insurance coverage for the benefit of Landlord and its managing agent in such amount and of such type as Landlord may reasonably require. D The installation, maintenance and operation of the Air Compressor shall be at Tenant’s sole cost and expense, and shall be performed in accordance with all applicable laws and requirements of applicable governmental authorities, and ot...
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!