Alternative Sampling Designs Sample Clauses

Alternative Sampling Designs. In emergency settings, rapid but statistically-reliable population-based surveys are needed to provide humanitarian organizations and government agencies with essential information on the severity and magnitude of the situation so that appropriate analysis and response planning takes place. The most common method used in emergencies is a two-stage 30x30 cluster survey. This method provides reliable population-level estimates, but is time- and resource-intensive. XXXXX, working with CRS, the Ohio State University, SC/US and a team of statistical experts at Harvard School of Public Health, developed, tested and validated three alternative sampling designs that are proven to be more time- and resource-efficient than the 30x30 cluster survey: the 33x6, the 67x3 and the sequential design. All three are hybrid designs, combining aspects of cluster sampling and analysis with LQAS analysis. Articles reporting on the alternative sampling work were published in the International Journal of Epidemiology (2007), Emerging Themes in Epidemiology (2008) and The Journal of Royal Statistical Society Series A (2009). In Project Year One, FANTA-2 published Alternative Sampling Designs for Emergency Settings: A Guide for Survey Planning, Data Collection and Analysis (2009). Need and demand continue to grow for additional thresholds to be addressed by the alternative sampling designs. The IASC Nutrition Cluster has now recommended the adoption of the WHO standards for emergency settings, which will lead to higher XXX prevalence levels being reported and make the detection of low levels of XXX (5 percent) useful in almost all emergency settings. Additional institutions have adopted the alternative sampling design approach; for example, WFP intends to begin using it in the near future and the Food Security Analysis Unit/Somalia is using the designs as their standard methodology. In addition, ACF is both scaling up the use of the designs within countries (e.g., to national levels in the case of Southern Sudan) and expanding the use of the designs for sentinel site surveillance to additional countries (e.g., Kenya, Uganda). FANTA-2 will continue to improve the relevance and utility of the alternative sampling designs for application in emergency settings. This will include statistical modeling and simulations to explore how the designs can most effectively be used for nutrition surveillance and validation of LQAS analysis for additional thresholds of acute malnutrition and alterna...
AutoNDA by SimpleDocs

Related to Alternative Sampling Designs

  • RE-WEIGHING PRODUCT Deliveries are subject to re- weighing at the point of destination by the Authorized User. If shrinkage occurs which exceeds that normally allowable in the trade, the Authorized User shall have the option to require delivery of the difference in quantity or to reduce the payment accordingly. Such option shall be exercised in writing by the Authorized User.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CSTC chooses to subtend a Verizon access Tandem, CSTC’s NPA/NXX must be assigned by CSTC to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG. 9.2.2 CSTC shall establish Access Toll Connecting Trunks pursuant to applicable access Tariffs by which it will provide Switched Exchange Access Services to Interexchange Carriers to enable such Interexchange Carriers to originate and terminate traffic to and from CSTC’s Customers. 9.2.3 The Access Toll Connecting Trunks shall be two-way trunks. Such trunks shall connect the End Office CSTC utilizes to provide Telephone Exchange Service and Switched Exchange Access to its Customers in a given LATA to the access Tandem(s) Verizon utilizes to provide Exchange Access in such LATA. 9.2.4 Access Toll Connecting Trunks shall be used solely for the transmission and routing of Exchange Access to allow CSTC’s Customers to connect to or be connected to the interexchange trunks of any Interexchange Carrier which is connected to a Verizon access Tandem.

  • Power Factor Design Criteria (Reactive Power A wind generating plant shall maintain a power factor within the range of 0.95 leading to 0.95 lagging, measured at the Point of Interconnection as defined in this LGIA, if the ISO’s System Reliability Impact Study shows that such a requirement is necessary to ensure safety or reliability. The power factor range standards can be met using, for example without limitation, power electronics designed to supply this level of reactive capability (taking into account any limitations due to voltage level, real power output, etc.) or fixed and switched capacitors if agreed to by the Connecting Transmission Owner for the Transmission District to which the wind generating plant will be interconnected, or a combination of the two. The Developer shall not disable power factor equipment while the wind plant is in operation. Wind plants shall also be able to provide sufficient dynamic voltage support in lieu of the power system stabilizer and automatic voltage regulation at the generator excitation system if the System Reliability Impact Study shows this to be required for system safety or reliability.

  • Loop Provisioning Involving Integrated Digital Loop Carriers 2.6.1 Where Xxxx has requested an Unbundled Loop and BellSouth uses IDLC systems to provide the local service to the End User and BellSouth has a suitable alternate facility available, BellSouth will make such alternative facilities available to Xxxx. If a suitable alternative facility is not available, then to the extent it is technically feasible, BellSouth will implement one of the following alternative arrangements for Xxxx (e.g. hairpinning): 1. Roll the circuit(s) from the IDLC to any spare copper that exists to the customer premises. 2. Roll the circuit(s) from the IDLC to an existing DLC that is not integrated. 3. If capacity exists, provide "side-door" porting through the switch. 4. If capacity exists, provide "Digital Access Cross Connect System (DACS)- door" porting (if the IDLC routes through a DACS prior to integration into the switch). 2.6.2 Arrangements 3 and 4 above require the use of a designed circuit. Therefore, non- designed Loops such as the SL1 voice grade and UCL-ND may not be ordered in these cases. 2.6.3 If no alternate facility is available, and upon request from Xxxx, and if agreed to by both Parties, BellSouth may utilize its Special Construction (SC) process to determine the additional costs required to provision facilities. Xxxx will then have the option of paying the one-time SC rates to place the Loop.

  • Alternative Work Schedule An alternate forty (40) hour work schedule (other than five (5) uniform and consecutive eight (8) hour days in a seven (7) day period), or for hospital personnel an eighty (80) hour workweek in a fourteen (14) day period and other mutually agreed upon schedules that comply with applicable federal and state law. Employee work schedules normally include two (2) consecutive days off.

  • Alternative Structure If following the date of this Agreement all of the conditions set forth in Article VI have been satisfied or waived (except that the tax representation letters in the forms as set forth in Exhibit B-1 and called for in Section 5.14 cannot be delivered and the condition set forth in Section 6.1(e) has not been waived), but the Closing could occur if the tax representation letters in the forms set forth in Exhibit B-2 could be executed and delivered (assuming Parent alters the structure as hereafter provided in this Section 1.1(b)), Parent shall alter the structure of the business combination between Merger Sub and the Company contemplated by this Agreement, , by consummating a second-step merger of the Surviving Corporation into a limited liability company wholly-owned by Parent that is disregarded as an entity for federal tax purposes, in accordance with Delaware Law, immediately following the Merger (such second-step merger, the “Second Merger”); provided, however, that (i) such wholly-owned disregarded limited liability company shall become a party to, and shall become bound by, the terms of this Agreement and (ii) the tax representation letters in the forms set forth in Exhibit B-2 shall be executed and delivered, and (iii) any action taken pursuant to this Section 1.1(b) shall not (unless consented to in writing by the Company prior to the Closing) (x) alter or change the kind or amount of consideration to be issued to the holders of the Company’s capital stock or other securities as provided for in this Agreement or (y) otherwise cause any closing condition set forth in Article VI not to be capable of being satisfied (unless duly waived by the party entitled to the benefits thereof). If such second-step merger occurs, references to the Merger in Recital I, Section 1.10, Section 2.6(b)(xiii), Section 4.1(b)(xviii), Section 5.14 and Section 6.1(e) shall be to the Merger and the second-step merger described in this Section 1.1(b), taken together as one integrated transaction for U.S. federal income tax purposes.

  • Programming Phase Schematic Design Phase: 2.2.1.3. Design Development Phase:

  • Computer Equipment Recycling Program If this Contract is for the purchase or lease of computer equipment, then Contractor certifies that it is in compliance with Subchapter Y, Chapter 361 of the Texas Health and Safety Code related to the Computer Equipment Recycling Program and the Texas Commission on Environmental Quality rules in 30 TAC Chapter 328.

  • SOURCE CODE ESCROW FOR LICENSED PRODUCT If Source Code or Source Code escrow is offered by either Contractor or Product manufacturer or developer to any other commercial customers, Contractor shall either: (i) provide Licensee with the Source Code for the Product; or (ii) place the Source Code in a third party escrow arrangement with a designated escrow agent who shall be named and identified to the State, and who shall be directed to release the deposited Source Code in accordance with a standard escrow agreement acceptable to the State; or (iii) will certify to the State that the Product manufacturer/developer has named the State, acting by and through the Authorized User, and the Licensee, as a named beneficiary of an established escrow arrangement with its designated escrow agent who shall be named and identified to the State and Licensee, and who shall be directed to release the deposited Source Code in accordance with the terms of escrow. Source Code, as well as any corrections or enhancements to such source code, shall be updated for each new release of the Product in the same manner as provided above and such updating of escrow shall be certified to the State in writing. Contractor shall identify the escrow agent upon commencement of the Contract term and shall certify annually that the escrow remains in effect in compliance with the terms of this clause. The State may release the Source Code to Licensees under this Contract who have licensed Product or obtained services, who may use such copy of the Source Code to maintain the Product.

  • Single Source Selection Services for tasks in circumstances which meet the requirements of paragraph 3.10 of the Consultant Guidelines for Single Source Selection, may, with the Association's prior agreement, be procured in accordance with the provisions of paragraphs 3.9 through 3.13 of the Consultant Guidelines.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!