As-Built Drawings; Permits Sample Clauses

As-Built Drawings; Permits. At the conclusion of construction, Tenant shall cause the Architect and General Contractor (i) to update the Approved Plans as necessary to reflect all changes made to the Approved Plans during the course of construction, (ii) to certify to the best of their knowledge that the “record set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of this Lease, and (iii) to deliver to Landlord, within sixty (60) days after issuance of a certificate of occupancy for the Premises or for the applicable Tenant Improvements, (A) two (2) sets of copies of such record set of drawings and (B) a copy of the final, signed version of each building permit for the applicable Tenant Improvements.
As-Built Drawings; Permits. At the conclusion of construction of Tenant Improvements in any applicable portion of the Premises, Tenant shall cause the TI Architect and TI General Contractor (i) to update the approved plans for all Tenant’s Work in such portion of the Premises as necessary to reflect all changes made to such approved plans during the course of construction, (ii) to certify to the best of their knowledge that the “record set” of as-built drawings are true and correct, and (iii) to deliver to Landlord, within sixty (60) day after issuance of a certificate of occupancy for the applicable portion of the Premises or for the applicable Tenant’s Work, (A) two (2) copies of such record set of as-built drawings in “hard copy” form and one (1) copy of such record set of as-built drawings in electronic form, and (B) a copy of the final, signed version of each building permit for the applicable Tenant’s Work.
As-Built Drawings; Permits. At the conclusion of construction of Tenant Improvements in each respective portion of the Premises, Tenant shall cause the TI Architect and TI General Contractor (i) to update the approved plans for all Tenant’s Work in such portion of the Premises as necessary to reflect all changes made to such approved plans during the course of construction, (ii) to certify to the best of their knowledge that the “record set” of as-built drawings are true and correct, which certification shall survive the expiration or termination of this Lease, and (iii) to deliver to Landlord, within sixty (60) day after issuance of a certificate of occupancy for the applicable portion of the Premises or for the applicable Tenant’s Work, (A) two (2) sets of copies of such record set of drawings and (B) a copy of the final, signed version of each building permit for the applicable Tenant’s Work.

Related to As-Built Drawings; Permits

  • As-Built Drawings Within thirty (30) Days of the successful completion of the Acceptance Test, Seller shall provide for Company review a set of the proposed as‑built drawings for the Company-Owned Interconnection Facilities constructed by Seller (and/or its Contractors). Within thirty (30) Days of Company's receipt of the proposed as‑built drawings, Company shall provide Seller with either (i) its comments on the proposed as‑built drawings or (ii) notice of acceptance of the proposed as‑built drawings as final as‑built drawings. If Company provides comments on the proposed as‑built drawings, Seller shall incorporate such comments into a final set of as‑built drawings and provide such final as‑built drawings to Company within twenty (20) Days of Seller's receipt of Company's comments.

  • Building Permits All building permits required for the construction of the Improvements have been obtained prior to the commencement of the construction of the Improvements and copies of same will be delivered to Lessor.

  • Required Permits Unless otherwise stated in the RFP documents, all local, State or

  • As-Built Plans Within thirty (30) days after completion of Tenant’s Changes requiring the submission of plans to Landlord, Tenant shall furnish to Landlord a complete set of “as-built” plans and specifications.

  • Applicable Permits Written confirmation that all Applicable Permits then required are in full force and effect including a list of such clearances.

  • Work Permits The Executive shall use his reasonable best efforts to obtain, maintain and renew a suitable (for the purposes of the Executive's contemplated employment by the Company) work permit by the Bermuda government authorities and any other permits required by any Bermuda government authority. The Company shall be responsible for permit fees, and all other expenses, including legal expenses, in connection with obtaining and maintaining such work permit.

  • Drawings and Specifications 9.1 A complete list of all Drawings that form a part of the Contract Documents are to be found as an index on the Drawings themselves, and/or may be provided to Developer and/or in the Table of Contents. 9.2 Materials or Work described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to recognized standards, unless noted otherwise. 9.3 Trade Name or Trade Term It is not the intention of the Contract Documents to go into detailed descriptions of any materials and/or methods commonly known to the trade under “trade name” or “trade term.” The mere mention or notation of “trade name” or “trade term” shall be considered a sufficient notice to Developer that it will be required to complete the work so named, complete, finished, and operable, with all its appurtenances, according to the best practices of the trade. 9.4 The naming of any material and/or equipment shall mean furnishing and installing of same, including all incidental and accessory items thereto and/or labor therefor, as per best practices of the trade(s) involved, unless specifically noted otherwise. 9.5 Contract Documents are complementary, and what is called for by one shall be binding as if called for by all. As such, Drawings and Specifications are intended to be fully cooperative and to agree. However, if Developer observes that Drawings and Specifications are in conflict with the Contract Documents, Developer shall promptly notify District and Architect in writing, and any necessary changes shall be made as provided in the Contract Documents. 9.6 Figured dimensions shall be followed in preference to scaled dimensions, and Developer shall make all additional measurements necessary for the work and shall be responsible for their accuracy. Before ordering any material or doing any work, each Developer shall verify all measurements at the building and shall be responsible for the correctness of same. 9.7 Should any question arise concerning the intent or meaning of the Contract Documents, including the Plans and Specifications, the question shall be submitted to the District for interpretation. If a conflict exists in the Contract Documents, these Construction Provisions shall control over the Facilities Lease, which shall control over the Site Lease, which shall control over Division 1 Documents, which shall control over Division 2 through Division 49 documents, which shall control over figured dimensions, which shall control over large-scale drawings, which shall control over small-scale drawings. In no case shall a document calling for lower quality and/or quantity of material or workmanship control. However, in the case of discrepancy or ambiguity solely between and among the Drawings and Specifications, the discrepancy or ambiguity shall be resolved in favor of the interpretation that will provide District with the functionally complete and operable Project described in the Drawings and Specifications. 9.8 Drawings and Specifications are intended to comply with all laws, ordinances, rules, and regulations of constituted authorities having jurisdiction, and where referred to in the Contract Documents, the laws, ordinances, rules, and regulations shall be considered as a part of the Contract Documents within the limits specified. 9.9 As required by Section 4-317(c), Part 1, Title 24, CCR: “Should any existing conditions such as deterioration or non-complying construction be discovered which is not covered by the DSA-approved documents wherein the finished work will not comply with Title 24, California Code of Regulations, a construction change document, or a separate set of plans and specifications, detailing and specifying the required repair work shall be submitted to and approved by DSA before proceeding with the repair work.”

  • PARKING PERMITS A. Must be obtained on the day of move in. B. Towing charges resulting from violations will be the responsibility of the RESIDENT. C. Any form of duplication of parking permits is a violation of the LEASE AGREEMENT, and may be grounds for eviction. Note: Refer to Resident Handbook for further detail.

  • Building Permit The Owner shall pay for all permits. The Owner and AE shall be required to provide such information to the Permitting Authority as is necessary to obtain approval from the Permitting Authority to commence construction prior to beginning construction. The CM shall pull the Building Permit, and shall be responsible for delivering and posting the Building Permit at the Project Site prior to the commencement of construction. The Owner and AE shall fully cooperate with the CM when and where necessary.

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.