Automation Requirements Sample Clauses

Automation Requirements. Planimetric design files (DGN) must be fully compatible with the State’s MicroStation V8i graphics program without further modification or conversion.
AutoNDA by SimpleDocs
Automation Requirements. Data processed by standard calculators, computers, and other business hardware and software normally maintained and used by the Engineer’s Surveyor will be considered acceptable. The Engineer’s Surveyor shall:  Provide planimetric design files (DGN) fully compatible with the State’s MicroStation V8i graphics program without further modification or conversion.  Electronically collect and process field survey data files to be fully compatible with the State’s computer systems without further modification or conversion. All files must incorporate only those feature codes currently being used by the State.  Provide DTM fully compatible with the State’s GEOPAK system without further modification or conversion. All DTM must be fully edited and rectified to provide a complete digital terrain model with all necessary break lines.  Submit a final aerial control point layout showing the location of the points and labeled with their respective alpha-numeric designations.  Submit a plot and computer graphics of an 11 inch by 17 inch index map showing an overall view of the project and the relationship of primary monumentation and control used in the preparation of the project, signed and sealed by a RPLS, and as directed by the State.  Submit a plot and computer graphics of an 11 inch by 17 inch horizontal and vertical control sheet showing the primary survey control monumentation used in the preparation of the project, signed and sealed by a RPLS, and as directed by the State.  Submit an 8 ½ inch by 11 inch data sheet for each aerial ground control point which must include, but need not be limited to, a location sketch, a physical description of the point, surface coordinates, the elevation, and datums used.  Submit a CD or DVD containing the graphics files and scanned images of the control data sheets.  Submit a written statement describing the datum used along with copies of all relevant NGS and data sheets. DocuSign Envelope ID: 6DA01770-719C-4EFF-A344-425189FAC6FB  Submit a written tabulation of all aerial control points with their respective alpha-numeric designations, surface coordinates (for center panel points only), and elevations.
Automation Requirements. 6.1. Planimetric design files (DGN) shall be fully compatible with the State’s 6.2. Electronically collected and processed field survey data files shall be fully compatible with the State’s computer systems without further modification or conversion. All files shall incorporate only those feature codes currently being used by the State. 6.3. DTM shall be fully compatible with the State’s GEOPAK system without further modification or conversion. All DTM fully edited and rectified to provide a complete digital terrain model with all necessary break lines.
Automation Requirements. Data processed by standard calculators, computers, and other business hardware and software normally maintained and used by the Engineer’s Surveyor must be considered acceptable. The Engineer’s Surveyor shall: • Provide planimetric design files (DGN) fully compatible with the State’s • Electronically collect and process field survey data files to be fully compatible with the State’s computer systems without further modification or conversion. All files must incorporate only those feature codes currently being used by the State. • Provide DTM fully compatible with the State’s GEOPAK system without further modification or conversion. All DTM must be fully edited and rectified to provide a complete digital terrain model with all necessary break lines. • Submit a final aerial control point layout showing the location of the points and labeled with their respective alpha-numeric designations. • Submit a plot and computer graphics of an 11 inch by 17 inch index map showing an overall view of the project and the relationship of primary monumentation and control used in the preparation of the project, signed and sealed by a RPLS, and as directed by the State. • Submit a plot and computer graphics of an 11 inch by 17 inch horizontal and vertical control sheet showing the primary survey control monumentation used in the preparation of the project, signed and sealed by a RPLS, and as directed by the State. • Submit a CD or DVD containing the graphics files and scanned images of the control data sheets. • Submit a written statement describing the datum used along with copies of all relevant NGS and data sheets. • Submit a written tabulation of all aerial control points with their respective alpha-numeric designations, surface coordinates (for center panel points only), and elevations. DocuSign Envelope ID: D0894D65-6FF6-4E21-BE5E-BEEA53479086
Automation Requirements. Deliverables The Engineer’s Surveyor shall: • Submit a final mobile mapping control point layout showing the location of the points and labeled with their respective alpha-numeric designations. • Submit a plot and computer graphics of an 11 inch by 17 inch index map showing an overall view of the project and the relationship of primary monumentation and control used in the preparation of the project, signed and sealed by a RPLS, and as directed by the State. • Submit a plot and computer graphics of an 11 inch by 17 inch horizontal and vertical control sheet showing the primary survey control monumentation used in the preparation of the project, signed and sealed by a RPLS, and as directed by the State. • Submit an 8 ½ inch by 11 inch data sheet for each mobile mapping ground control point which must include, but need not be limited to, a location sketch, a physical description of the point, surface coordinates, the elevation, and datums used. • Submit a CD or DVD containing the graphics files and scanned images of the control data sheets. • Submit a written statement describing the datum used along with copies of all relevant NGS and data sheets. • Submit a written tabulation of all mobile mapping control points with their respective alpha-numeric designations, surface coordinates (for center panel points only), and elevations. DocuSign Envelope ID: D0E29F2F-2A8C-4E32-A9B8-8EFA82530B8F PHASE II – PLANS, SPECIFICATIONS, AND ESTIMATES (XXXX SECTION) FUNCTION CODE 102(110) – FEASIBILITY STUDIES
Automation Requirements. Deliverables The Engineer’s Surveyor shall: • Submit a plot and computer graphics of an 11 inch by 17 inch index map showing an overall view of the project and the relationship of primary monumentation and control used in the preparation of the project, signed and sealed by a RPLS, and as directed by the State. • Submit a plot and computer graphics of an 11 inch by 17 inch horizontal and vertical control sheet showing the primary survey control monumentation used in the preparation of the project, signed and sealed by a RPLS, and as directed by the State. • Submit an 8 ½ inch by 11 inch data sheet for each aerial ground control point which must include, but need not be limited to, a location sketch, a physical description of the point, surface coordinates, the elevation, and datums used. • Submit a CD or DVD containing the graphics files and scanned images of the control data sheets. • Submit a written statement describing the datum used along with copies of all relevant NGS and data sheets.
Automation Requirements 
AutoNDA by SimpleDocs

Related to Automation Requirements

  • GRADUATION REQUIREMENTS I understand that in order to graduate from the program and to receive a certificate of completion, diploma or degree I must successfully complete the required number of scheduled clock hours as specified in the catalog and on the Enrollment Agreement, pass all written and practical examinations with a minimum score of 80%, and complete all required clinical hours and satisfy all financial obligations to the College.

  • Notification Requirements 1. If the Family Leave is foreseeable, the employee must provide the agency/department with thirty (30) calendar days notice of his or her intent to take Family Leave. 2. If the event necessitating the Family Leave becomes known to the employee less than thirty (30) calendar days prior to the employee's need for Family Leave, the employee must provide as much notice as possible. In no case shall the employee provide notice later than five (5) calendar days after he or she learns of the need for Family Leave. 3. For foreseeable leave due to a qualifying exigency, an employee must provide notice of the need for leave as soon as practicable, regardless of how far in advance such leave is foreseeable. 4. When the Family Leave is for the purpose of the scheduled medical treatment or planned medical care of a child, parent, spouse or registered domestic partner, the employee shall, to the extent practicable, schedule treatment and/or care in a way that minimizes disruption to agency/department operations.

  • Encryption Requirements DST will not locally store Fund Data on any laptops or mobile devices (e.g., Blackberries, PDAs) managed by DST.

  • Information Requirements The Company covenants that, if at any time before the end of the Effectiveness Period the Company is not subject to the reporting requirements of the Exchange Act, it will cooperate with any Holder and take such further reasonable action as any Holder may reasonably request in writing (including, without limitation, making such reasonable representations as any such Holder may reasonably request), all to the extent required from time to time to enable such Holder to sell Registrable Securities without registration under the Securities Act within the limitation of the exemptions provided by Rule 144 and Rule 144A under the Securities Act and customarily taken in connection with sales pursuant to such exemptions. Upon the written request of any Holder, the Company shall deliver to such Holder a written statement as to whether it has complied with such filing requirements, unless such a statement has been included in the Company’s most recent report filed pursuant to Section 13 or Section 15(d) of Exchange Act. Notwithstanding the foregoing, nothing in this Section 7 shall be deemed to require the Company to register any of its securities (other than the Common Stock) under any section of the Exchange Act.

  • Certification Requirements The hospice program certifies and attaches hereto documentation that: (a) it is Medicare approved and meets all Medicare conditions of participation (42 CFR 418); and (b) is licensed pursuant to any applicable state or local law.

  • Application Requirements This application shall contain, as a minimum, a sketch showing the location of proposed facilities; a description, sketch, manufacturer’s brochure, etc. of the proposed facilities; and a description of the operation proposed. (11-28-90) 101. -- 199. (RESERVED)‌ 200. OPERATIONAL AGREEMENT.‌‌

  • Installation requirements We (if we install the System) or our contractor (if we procure a contractor to install the System) must:

  • Notification Requirement Through and up to the conclusion of the Non-Competition Period, Executive shall give notice to the Company of each new business activity he plans to undertake, at least seven (7) days prior to beginning any such activity. Such notice shall state the name and address of the Person for whom such activity is undertaken and the nature of Executive’s business relationship(s) and position(s) with such Person.

  • Information Requirement The successful bidder's shall be required to advise the Office of Management and Budget, Government Support Services of the gross amount of purchases made as a result of the contract.

  • Documentation Requirements ODM shall pay the MCP after it receives sufficient documentation, as determined by ODM, detailing the MCP’s Ohio Medicaid-specific liability for the Annual Fee. The MCP shall provide documentation that includes the following: 1. Total premiums reported on IRS Form 8963;

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!