Bollards Sample Clauses

Bollards. Adequate double bollards to be provided on the main deck distributed on the port and starboard side for effective mooring. The bollards placed in heavy foundations with a height of about 200 mm. Total height of the bollards 500 mm. Deck construction in way of bollards shall be reinforced with increased plating thickness and extra stiffeners.
AutoNDA by SimpleDocs
Bollards. A. Pipe: Black Steel, ASTM A53, Type E, Grade A, Schedule 80, sized as shown, with 1/4-inch steel-plate cap welded all around and weld ground smooth
Bollards. The building(s) will be protected by the installation of crash barriers around the perimeter. These may be concrete bollards, planters, retractable gates, or other architectural features. They shall conform as much as practical to the existing building features and structures to avoid an armed camp appearance. SFO NO. DTSA20-03-R-00528 INITIALS: [SIG] & [SIG] --------- --------- 44 LESSOR GOV'T
Bollards. .1 The bollards are to be comprised of 150mm (6 in) diameter galvanized steel pipe;
Bollards. .1 There shall be one [1] bollard installed at the North corner and one [1] bollard installed at the East corner of the tower.
Bollards. Steel tubes for bollards shall conform to ASTM A 53 Grade A. Concrete shall conform to the requirements of Section 502. Paint for bollards shall conform to Section 714. Galvanized steel for bollards shall conform to Section 715.
Bollards. Construct and install bollards at location shown on plans. Fabricated bollards shall be inspected prior to installation. Final determination of bollard locations will be made in the field as directed. Excavate a hole for the bollard to the required depth. Assemble the bollard and set the bollard plumb. Place concrete for the bollard base according to Section 502. Galvanized posts shall be pre-treated with vinyl wash primer or per manufacturer’s recommendations prior to painting “OSHA” safety yellow.
AutoNDA by SimpleDocs

Related to Bollards

  • Ceilings 13.1 Lambdaboard ceilings, minimum 25mm thick with a width of 1220mm x 1800mm, skimmed with Plascon EZ Joint and EZ Skim system.

  • Weights light, moderate and heavy, have their normal everyday meanings, and are to be applied consistently, regardless of the physical characteristics of the jobholder and whether the duties are normally carried out by women or by men; or by small people or large people; or by fit or unfit people. So, a sack of cement or a sack of potatoes is a heavy weight, even if it is lifted and carried without obvious exertion by a tall, fit, young person.

  • XXXREAS the Trust is registered under the Investment Company Act of 1940, as amended, (the "1940 Act") as an open-end, series management investment company; and

  • Ceiling Company and its subcontractors will not affix, attach, or suspend any lighting fixtures, signs, or other fixtures or devices of any kind or nature from the ceiling above any of the Premises without the prior written approval of Authority.

  • Backlog Backlog represents the total estimated contract value of work that remains to be completed pursuant to outstanding contracts as at a certain date, net of estimated value added tax, and is based on the Group’s assumption that the relevant contracts will be performed in accordance with their terms. Backlog is not a measure defined by generally accepted accounting principles. Any modification, termination or suspension of these contracts by the Group’s clients may have a substantial and immediate effect on the Group’s backlog. Projects may also remain in the Group’s backlog for an extended period of time beyond what was initially anticipated due to various factors beyond the Group’s control. The table below sets out the details of the total value of new contracts entered into by the Group and its backlog categorised by (1) business segments; (2) the industries in which the Group’s clients operate; (3) regions; and (4) clients of each of (i) China Petrochemical Corporation (“Sinopec Group”) and its associates and (ii) the non- Sinopec Group and its associates during the period or as at the date indicated: Total of New Contract Value Backlog For the twelve months ended 31 December 2019 As at 31 December 2019 Business segments Engineering, Consulting and (RMB thousand) Percentage(%) (RMB thousand) Percentage(%) Licensing 2,713,103 5.2 8,192,663 8.6 EPC Contracting 31,208,711 59.7 72,662,664 76.5 Construction 17,317,903 33.1 12,829,461 13.5 Equipment Manufacturing 1,079,430 2.0 1,308,772 1.4 Total 52,319,147 100.0 94,993,560 100.0 Industries in which the Group’s clients operate Oil Refining 14,058,072 26.9 28,201,648 29.7 Petrochemicals 24,035,891 45.9 28,285,500 29.8 New Coal Chemicals 7,012,922 13.4 13,394,670 14.1 Other Industries 7,212,262 13.8 25,111,742 26.4 Total 52,319,147 100.0 94,993,560 100.0 Regions PRC 45,585,147 87.1 74,754,485 78.7 Overseas 6,734,000 12.9 20,239,075 21.3 Total 52,319,147 100.0 94,993,560 100.0 Clients of each of (i) Sinopec Group and its associates and (ii) the non-Sinopec Group and its associates Sinopec Group and its associates 29,195,571 55.8 49,789,049 52.4 Non-Sinopec Group and its associates 23,123,576 44.2 45,204,511 47.6 Total 52,319,147 100.0 94,993,560 100.0 The Board wishes to emphasise that the above information in relation to the representative new contracts, the total value of new contracts and backlog shall not constitute any forecast or prediction of the profits of the Group. This announcement is made by the order of the Board. The Board collectively and individually accepts responsibility for the accuracy of this announcement. Shareholders of the Company and potential investors are advised to exercise caution when dealing in the shares of the Company. By order of the Board SINOPEC ENGINEERING (GROUP) CO., LTD. Xxx Xxxxx Chief Financial Officer, Company Secretary Beijing, the PRC 28 February 2020 As at the date of this announcement, the executive Directors are XX Xxxxxxx, XXXXX Xxxxx, XXX Xxxx (employee representative Director) and XXXX Xxxxxxxx (employee representative Director); the non- executive Director is XX Xxxxxx; and the independent non-executive Directors are XXX Xxxx Xxxxx, Xxxxxxx, XXX Xxxx and XX Xxxxx.

  • Shipments The Vendor shall ship, deliver or provide ordered products or services within a commercially reasonable time after the receipt of the order from the TIPS Member. If a delay in said delivery is anticipated, the Vendor shall notify TIPS Member as to why delivery is delayed and shall provide an estimated time for completion of the order. TIPS or the requesting entity may cancel the order if estimated delivery time is not acceptable or not as agreed by the parties.

  • FLOORING All Bed Rooms, Dinning-cum-Living, and would be finished with Ivory Vitrified tiles (24'' X 24'') flooring and 4'' skirting. Bath-room, Kitchen & Balcony would be finished with Ivory Ceramic tiles (12'' X 12'') flooring. The walls of the Toilets/Bathrooms would finish with white glazed tiles in 60'' height. Roof would be finished with roof tiles.

  • Floor Load Tenant shall not place a load upon any floor of the Premises that exceeds 50 pounds per square foot “live load”. Landlord reserves the right to reasonably designate the position of all Equipment which Tenant wishes to place within the Premises, and to place limitations on the weight thereof.

  • Inventories The Operator shall maintain detailed records of Controllable Material.

  • Gross Margin 13 Independent...................................................................................13

Time is Money Join Law Insider Premium to draft better contracts faster.