Bus Work Sample Clauses

Bus Work. The 69kV low bus will be extended to the west. The new 69kV main bus will be 3” Al with 1192 Al wire taps. The wire taps to all PT’s and arresters will be 336 Al.
Bus Work. The 69kV low bus will be extended to the west. The new 69kV main bus will be 3” Al with 1192 Al wire taps. The wire taps to all PT’s and arresters will be 336 Al. Control House – Three (3) new control panels will be installed in the west end of the control house. The new AC supply cable to GCB 6050 will come from a single pole 30A breaker on AC Dist Panel C. Control Cables – The following new cables will be installed. These will be installed from the control house to the new equipment via the existing precast concrete trench and new conduits. Two (2) 19/c #12 control cables Two (2) 9/c #9 CT cables One (1) 2/c #10 AC One (1) 10c/#9 awg metering secondary cable One (1) 10c/#9 awg metering secondary cable Miscellaneous – 48kV MCOV surge arresters will be located 18” from the insulators on the pothead structure. One (1) spline ball will be installed. All new equipment will be connected to the existing ground grid according to LIPA’s construction standards.
Bus Work. ➢ (18) 115 kV Composite Deadend Insulators ➢ (450) Feet – 336.4 MCM ACSR ➢ (1) 121 kV Station Post Insulators
Bus Work. Not applicable.
Bus Work. ➢ (3) 115 kV, Station Post Insulators ➢ (6) 230 kV, Station Post Insulators ➢ (180) Feet – 336.4 MCM ACSR ➢ (9) 2” Aluminum Pipe Bus Supports to 5’ B.C. ➢ (180) Feet – 2” SPS Aluminum Pipe Bus

Related to Bus Work

  • STOP WORK (a) SELLER shall stop Work for up to ninety (90) days in accordance with any written notice received from LOCKHEED XXXXXX, or for such longer period of time as the parties may agree and shall take all reasonable steps to minimize the incurrence of costs allocable to the Work during the period of Work stoppage. (b) Within such period, LOCKHEED XXXXXX shall either terminate in accordance with the provisions of this Contract or continue the Work by written notice to SELLER. In the event of a continuation, an equitable adjustment in accordance with the principles of the "Changes" clause shall be made to the price, delivery schedule, or other provision(s) affected by the Work stoppage, if applicable, provided that the claim for equitable adjustment is made within thirty (30) days after date of notice to continue.

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

  • Additional Work If changes in the work seem merited by Consultant or the City, and informal consultations with the other party indicate that a change is warranted, it shall be processed in the following manner: a letter outlining the changes shall be forwarded to the City by Consultant with a statement of estimated changes in fee or time schedule. An amendment to this Agreement shall be prepared by the City and executed by both Parties before performance of such services, or the City will not be required to pay for the changes in the scope of work. Such amendment shall not render ineffective or invalidate unaffected portions of this Agreement.