CHECK AND CALIBRATION Sample Clauses

CHECK AND CALIBRATION. Operating ZoneInterchange Equipment Operators shall perform annual check and calibration of its time error of and frequency devices used to supply the SPP with data used by SPP to perform BA functions against a common reference. Documents verifying such actions shall be provided to SPP BA as requested by SPP BA. The Operating ZoneInterchange Equipment Operator shall adhere to the minimum values for measuring devices as listed below: Device Accuracy Digital Frequency Transducer = 0.001 Hz MW, MVAR, and voltage transducer = 0.25 % of full scale Remote terminal unit = 0.25 % of full scale Potential transformer = 0.30 % of full scale Current transformer = 0.50 % of full scale
AutoNDA by SimpleDocs
CHECK AND CALIBRATION. Operating ZoneInterchange Equipment Operators shall perform annual check and calibration of its time error of frequency devices used to supply the SPP with data used by SPP to perform BA functions against a common reference. The Operating ZoneInterchange Equipment Operator shall adhere to the minimum values for measuring devices as listed below: Device Accuracy Digital Frequency Transducer = 0.001 Hz MW, MVAR, and voltage transducer = 0.25 % of full scale Remote terminal unit = 0.25 % of full scale Potential transformer = 0.30 % of full scale Current transformer = 0.50 % of full scale

Related to CHECK AND CALIBRATION

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.

  • Check Meters Developer, at its option and expense, may install and operate, on its premises and on its side of the Point of Interconnection, one or more check meters to check Connecting Transmission Owner’s meters. Such check meters shall be for check purposes only and shall not be used for the measurement of power flows for purposes of this Agreement, except as provided in Article 7.4 below. The check meters shall be subject at all reasonable times to inspection and examination by Connecting Transmission Owner or its designee. The installation, operation and maintenance thereof shall be performed entirely by Developer in accordance with Good Utility Practice.

  • Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of fossil fuel consumption and associated GHG reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site(s) • Develop M&V protocol for pre-installation measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre- installation measurements (and calculations) based on the M&V protocol for pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to:

  • Scoring The number of routes each company operates (Route # 0001-2999, 8000-8199) will be multiplied by 2 to determine the daily number of trips. (Only accidents, breakdowns and service reports related to routes falling in this range will be used for the evaluation). The daily number of trips will be multiplied by 175 to arrive at the annual number of trips. The number of accidents, breakdowns and service complaints will be divided by the total number of trips to calculate a percent figure. Each company’s percentage will be compared to the total average. See below for a sample. BUS COMPANY NUMBER OF TOTAL BKDN PERCENT ACCIDENTS PERCENT2 SERVICE PERCENT3 ROUTES TRIPS BKDN ACCIDENTS REPORTS COMPLAINTS TO TRIPS TO TRIPS TO TRIPS A 360 58680 3 0.01% 27 0.05% 46 0.08% B 48 7824 3 0.04% 4 0.05% 39 0.50% C 123 20049 11 0.05% 9 0.04% 27 0.13% D 91 14833 0.00% 10 0.07% 11 0.07% E 124 20212 20 0.10% 19 0.09% 18 0.09% TOTALS 746 121598 37 0.03% 69 0.06% 141 0.12% To score, if a company’s percentage is less than or equal to the total percentage for that category, the company will be awarded 6 points per category. Percentages greater than the total percentage for each distinct category (Accident, Breakdown, Service Complaints) will be scored according to the following scale: Less than-Equal to Ave. 6 points 0-3% above average 5 points 4-7% above average 4 points 5-8% above average 3 points 9-12% above average 2 points 13-16% 1 points Greater than 17% 0 points Any circumstance whereby a Breakdown or Accident is found by PTS to be ‘Non Reported’ by vendor within the required timeframe (see G-36) will count as (20) ‘Reported’ instances for the purpose of this Contractor Evaluation Scoring.

  • Test The outer surface of the lamp lenses shall be subjected once or more than once to the action of the sand jet produced as described above. The jet shall be sprayed almost perpendicular to the surface to be tested. The deterioration shall be checked by means of one or more samples of glass placed as a reference near the lenses to be tested. The mixture shall be sprayed until the variation in the diffusion of light on the sample or samples measured by the method described in Appendix 2, is such that: Δ d = (T5 - T4) / T2 ≤ 0.0250 ± 0.0025 Several reference samples may be used to check that the whole surface to be tested has deteriorated homogeneously.

  • ODUF Testing 6.6.1 Upon request from TWTC, AT&T shall send ODUF test files to TWTC. The Parties agree to review and discuss the ODUF file content and/or format. For testing of usage results, AT&T shall request that TWTC set up a production (live) file. The live test may consist of TWTC’s employees making test calls for the types of services TWTC requests on ODUF. These test calls are logged by TWTC, and the logs are provided to AT&T. These logs will be used to verify the files. Testing will be completed within thirty (30) days from the date on which the initial test file was sent.

  • Testing Landlord shall have the right to conduct annual tests of the Premises to determine whether any contamination of the Premises or the Project has occurred as a result of Tenant’s use. Tenant shall be required to pay the cost of such annual test of the Premises; provided, however, that if Tenant conducts its own tests of the Premises using third party contractors and test procedures acceptable to Landlord which tests are certified to Landlord, Landlord shall accept such tests in lieu of the annual tests to be paid for by Tenant. In addition, at any time, and from time to time, prior to the expiration or earlier termination of the Term, Landlord shall have the right to conduct appropriate tests of the Premises and the Project to determine if contamination has occurred as a result of Tenant’s use of the Premises. In connection with such testing, upon the request of Landlord, Tenant shall deliver to Landlord or its consultant such non-proprietary information concerning the use of Hazardous Materials in or about the Premises by Tenant or any Tenant Party. If contamination has occurred for which Tenant is liable under this Section 30, Tenant shall pay all costs to conduct such tests. If no such contamination is found, Landlord shall pay the costs of such tests (which shall not constitute an Operating Expense). Landlord shall provide Tenant with a copy of all third party, non-confidential reports and tests of the Premises made by or on behalf of Landlord during the Term without representation or warranty and subject to a confidentiality agreement. Tenant shall, at its sole cost and expense, promptly and satisfactorily remediate any environmental conditions identified by such testing in accordance with all Environmental Requirements. Landlord’s receipt of or satisfaction with any environmental assessment in no way waives any rights which Landlord may have against Tenant.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point Xxxxxx. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!