Chilled Water Pipework, Condensate Drains and Insulation Sample Clauses

Chilled Water Pipework, Condensate Drains and Insulation. All chilled water distribution pipework shall be non-galvanised heavyweight carbon steel to ANSl B31.1. Pipework supports shall be at not greater than the following intervals:- Size of Tube Support Intervals 15mm 1.8 m 20mm - 50mm 2.4 m 65mm - 100mm 3.0 m 125mm 3.7 m 150mm 4.5 m >150mm 6.0 m A drain system shall be installed to carry away condensate from package air conditioning units evaporator coils, fan coil and air handling unit cooling coils. The drain connections shall be trapped and run to the nearest gully, soakaway or sump. Condensate drains shall have the same bore as the drain connection on the units. All changes in direction of pipework for drains shall be carried out with crosses or tees with plugs fitted in blank ends for rodding out. All equipment drains shall be adequately supported and run with a fall in the direction of flow of not less than 1:250. Pipework for drains shall be run in light gauge copper tube or appropriate plastic pipe. Thermal insulation shall be applied to all pipework carrying chilled water and hot water services and to cold water services pipework where it is exposed to the weather. Floats and final connections to sanitary ware shall not be insulated. The basic pipe insulating material used on all pipework shall be rigid preformed resin impregnated glass fibre pipe sections of the thickness specified in this clause and having a thermal conductance of less than 0.045 W/m2 deg.C at the operating temperature and a density of not less than 80 kg/m3. The insulation shall be covered with white cotton canvas secured by aluminium alloy bands. Thermal insulation shall be securely fixed to pipework and butt jointed between sections with the faces of the butting edges sealed together by application of non setting sealing compound. All adhesive and sealing compound shall be non-flammable. The insulation shall be purpose made for the type and grade of piping to which it is fixed and shall form a tight fit on the pipe after the application of all sealant and adhesive. Insulation shall be applied to flanges and pipe fittings to the same thickness and standard as the pipe to which they are fixed and vapour barriers shall be extended over the insulation without a break and dressed up to flanges and valve boxes. Thermal insulation exposed to weather and solar effect shall be additionally protected against the weather by means of an external coating of aluminium sheet of at least 0.8mm thick riveted into position and sealed at the joints...
AutoNDA by SimpleDocs

Related to Chilled Water Pipework, Condensate Drains and Insulation

  • Potable Water Contractor shall provide potable water and ice for the Stage 2 Site use, and ensure that a safe and plentiful supply of potable water and ice is available for all activities on the Stage 2 Site until Substantial Completion of Subproject 3. The water and ice for human consumption shall be of suitable quality.

  • Carpet Cleaning Shampooing carpets with the deep dirt extraction (steam cleaning) method per manufactures recommendations.

  • Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including without limitation those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems.

  • Exterior Drainage Does water stand on the property for more than 24 hours after a heavy rain? Yes No Unknown Comments Are gutters and downspouts in good repair? Yes No Unknown Comments:

  • Underground Utilities Any required ground digging or subsurface work shall be done in accordance with Chapter 556, Florida Statutes. It shall be the responsibility of CONTRACTOR to have all underground utilities located before any work begins (Sunshine State One Call 0-000-000-0000). The repairs of any damaged underground utilities as a result of the work being performed by CONTRACTOR shall be the responsibility of CONTRACTOR. The proper utility company shall be contacted immediately to expedite the repairs, if damage has occurred. CONTRACTOR will notify the COUNTY and provide a written explanation of the incident within two (2) days of the damage to any underground utilities.

  • Dry Cleaning Timpson have over 520 dry cleaning stores and are now the UK’s biggest family-run dry cleaner. We process and clean up to 40,000 garments per week and have 32 Dry Cleaning production sites located around the UK. 19 of these sites are Timpson Super Hubs and act as satellite production centres. We offer customers a next day service on everyday items and quality check each garment before it leaves production. Dry Cleaning by Timpson See prices, opening times and more about dry cleaning and laundry services in , . From £2 per item. : Dry cleaning & laundry services DLS have the expertise to advise, design, supply, install & maintain your professional laundry equipment

  • Interconnection Points 8.5.1 The IP of a Party (“Receiving Party”) for Measured Internet Traffic delivered to the Receiving Party by the other Party shall be the same as the IP of the Receiving Party for Reciprocal Compensation Traffic under Section 7.1 above.

  • Provisioning of High Frequency Spectrum and Splitter Space 3.2.1 BellSouth will provide <<customer_name>> with access to the High Frequency Spectrum as follows:

  • Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.

  • Compressed Work Week The Company and Union recognize the concept of the compressed work week. It is further understood that the compressed work week conditions will apply only to those departments that are on the compressed work week.